Summary
Overview
Work History
Education
Skills
Timeline
Generic
Su Sandar  Myint

Su Sandar Myint

Summary

Proven expertise in cost estimation, project coordination and demonstrated through impactful roles. Skilled in bid preparation and proposal writing, excel in driving project success by optimizing budgets and enhancing procurement strategies. Achieved significant cost savings and efficiency improvements, showcasing a strong blend of analytical and negotiation abilities.

Overview

16
16
years of professional experience

Work History

Proposal & Estimation Engineer

Hai Leck Engineer Pte Ltd
06.2012 - Current
  • Cost Estimation for construction of Mechanical, Piping, Structural Steel, Tank, Scaffolding and Paint Work
  • Analyze tender documents for project requirements, drawings and project schedules
  • Attend tender meeting & project site show around
  • Carryout quantity take-off when necessary
  • Estimate the overall project cost for materials, labour, project preliminary cost
  • Plan and prepare for sourcing of third-party contractor, suppliers and vendors
  • Coordinate with clients to determine the full range of costs
  • Cooperate with vendors and subcontractors to obtain a reliable quotation for most attractive tender proposal
  • Liaise with engineering team for designs and drawings
  • Assess the potential consequences of cost-related issues, resolutions, strategies, and present them to the management team
  • Present the tender proposal to the senior management priors to determine the final value of the tender
  • Participate in tender clarification meetings during the tendering process until the negotiating state
  • Prepare technical documents and preliminary schedule for tender technical proposal
  • Maintained an updated database of historical cost data
  • Review the contract’s documents and assist until the signatory and issue the contract
  • Number of Awarded Tenders: 8 Projects (2 to 22 Million), 7 Projects (below 2 Million)

Costing and Quantity Surveying for Project

  • Prepare quotation for all variation works
  • Assisted and raised MR to Purchasing Department for buying material
  • Prepare bid tabulation form and work order form for confirmation of works to subcontractors and vendors
  • Verify subcontractors’ and vendors’ claims, and issue payment certificate
  • Arrange for collection of all invoices and assist on obtaining approval from respective managers

Costing & QS Engineer

Hiap Seng Engineering Ltd
08.2010 - 05.2012
  • Costing for Maintenance Work of Mechanical, Tankage, Structure and Piping
  • · Identify the basis of established budgets derived from the original work scope
  • · Evaluation of price comparison and cost summary
  • · Track all or potential changes to the project scope ensuring estimates of cost changes and schedule impact
  • · Updated project progress on a routine basis against established scope schedules and budgets
  • · Prepared valuations pricing and agreement of contract variations, progress claims
  • · Monitored ongoing construction costs to assist management.
  • · Resolve any claim discrepancies and dispute in documents
  • · Responsible for source of new suppliers and sub-con outsourcing
  • · Drafted and created the presentation of work method with SOLIDWORKS for the project proposal.

Draughtsman

UNIVERSAL STEEL INDUSTRIES PTE LTD
03.2009 - 08.2010
  • · Designed and fabricated the customized stainless-steel kitchen equipment
  • · Provided plan design for the commercial kitchen equipment for F&B
  • · Utilize initial design concept to generate CAD drawings
  • · Responded to customer queries and resolved customer issues
  • · Meeting and discussing with customers to fulfill their desire kitchen design
  • · Assisted in generating survey design layouts as needed.
  • · Follow up the customer’s requirements after sales support.
  • Number of Restaurant Kitchen Design: 5nos.

Education

Bachelor of Engineering - Electronics

Yangon Technological University
Myanmar
03.2006

Bachelor of Technology - Electronics

YANGON Technological University
Myanmar

Skills

  • Cost Estimation
  • Cost Control
  • Bid preparation
  • Material Takeoff
  • Quantity Surveying
  • Budget Planning
  • Project Coordination
  • Proposal Writing
  • Procurement strategy
  • Project Scheduling
  • Mathematics proficiency

Timeline

Proposal & Estimation Engineer

Hai Leck Engineer Pte Ltd
06.2012 - Current

Costing & QS Engineer

Hiap Seng Engineering Ltd
08.2010 - 05.2012

Draughtsman

UNIVERSAL STEEL INDUSTRIES PTE LTD
03.2009 - 08.2010

Bachelor of Engineering - Electronics

Yangon Technological University

Bachelor of Technology - Electronics

YANGON Technological University
Su Sandar Myint