Summary

Resourceful project manager with 12 years of expertise in organizing business operations, financial oversight, and resource management to achieve smooth flow and project operations. Demonstrated success in delivering high-impact projects in diverse environments. Skilled at driving project timelines and ensuring quality outcomes through strategic planning and execution. Highly collaborative, adaptable, and committed to team success and client satisfaction. With 32 years of experience in the construction field, I have held various positions that have equipped me with a deep understanding of the industry.

Overview

32
32
years of professional experience

Work History

PROJECT MANAGER

KIM TIONG HUAT CONTRACTOR P/L
06.2005 - Current
  • Project Involved: DTSS Phase 2 C1A Tuas /J109 Jurong Region Line/ J103 Jurong Region Line / CR111 Defu Station / N115 Woodland /CR205 Blackmore drive Project / CR202 Fairways Drive
  • Owner: LTA Project / PUB Project
  • Our Main Contractor: McConnell Dowell / Daewoo / Wai Fong / Gamuda /Hyundai / China Communication / Obayashi – Shanghai Tunnel JV
  • Scope Of Work: Drain and Road diversion and Reinstatement works

PROJECT MANAGER

KIM TIONG HUAT CONTRACTOR P/L
02.2017 - 11.2020
  • Project Involved: N103 North south corridor/ N108 North south corridor/ T305 Katong Park Station / T208 Springleaf Station / C915 DTL2 / T216 Stevens Station
  • Owner: LTA Project
  • Our Main Contractor: Shanghai Tunnel Engineering / Leighton Asia / SK Engineering / China Railway First Group / Daewoo
  • Scope Of Work: Drain and Road diversion and Reinstatement works

PROJECT MANAGER

KIM TIONG HUAT CONTRACTOR P/L
12.2014 - 01.2017
  • Project Involved: C917A DTL2 / C918A DTL 2/ Sengkang Hospital Project
  • Owner: LTA Project / Sing Health Groups
  • Our Main Contractor: Mc Connell Dowell Pte
  • Ltd./ SK Engineering /Penta Ocean
  • Scope Of Work: Drain and Road diversion and Reinstatement works

PROJECT MANAGER

KIM TIONG HUAT CONTRACTOR P/L
01.2014 - 11.2014
  • Project Involved: T208 Tagore / T213 Caldecott
  • Owner: LTA Project
  • Our Main Contractor: Leighton Asia / Samsung Corporation
  • Scope Of Work: Drain and Road diversion and Reinstatement works

PROJECT MANAGER

KIM TIONG HUAT CONTRACTOR P/L
06.2010 - 12.2013
  • Project Involved: LANXESS / KMC Phase 2 / C917 DTL2 / C918 DTL2 / C935 DTL3
  • Owner: LANXESS / Keppel Groups / LTA Project
  • Our Main Contractor: Gammon / Mc Connell Dowell / Leighton Asia / Alphine
  • Scope Of Work: Drain and Road diversion and Reinstatement works, Excavation and backfilling works, Pile cropping works, Tank foundation, Pile cap foundation works

SITE MANAGER

KIM TIONG HUAT CONTRACTOR P/L
07.2008 - 05.2010
  • Project Involved: Neste Oil at Tuas South Ave 9
  • Owner: Neste Oil and Technip
  • Our Main Contractor: Gammon Pte Ltd
  • Scope Of Work: Drain and Road diversion and Reinstatement works, Excavation and backfilling works, Pile cropping works, Tank foundation, Pile cap foundation works

PROJECT ENGINEER

KIM TIONG HUAT CONTRACTOR P/L
12.2006 - 06.2008
  • Project Involved: Helios Terminal at Jurong Island
  • Owner: Helios / Alstom
  • Our Main Contractor: McConnell Dowell south east Asia Pte Ltd
  • Scope Of Work: Drain and Road diversion and Reinstatement works, Excavation and backfilling works, Pile cropping works, Tank foundation, Pile cap foundation works

SITE ENGINEER

KIM TIONG HUAT CONTRACTOR P/L
06.2005 - 11.2006
  • Project Involved: Sentosa Cove Arrival Plaza / C855 & C852 North East Line
  • Owner: Sentosa / LTA
  • Our Main Contractor: Gammon Pte Ltd / Woh Hup
  • Scope Of Work: Drain and Road diversion and Reinstatement works, Excavation and backfilling works

SITE SUPERVISOR

HOCK CHUAN ANN CONSTRUCTON PTE LTD
05.2000 - 10.2004
  • Project Involved: Edel Weiss Park Condominium, Kim Keat Upgrading (Mup 16), Army Vehicle Multistorey Car Park at Sembawang
  • Owner: Edel Weiss, Hdb, Dsta
  • Scope Of Work: Building structural and Archi works, Excavation and backfilling works

SITE ENGINEER & PROJECT IN CHARGE

Ninans Pte Ltd
05.1992 - 04.2000
  • Project Involved: Cold Storage, Ice Plant, Sea food Processing Plant, Cooling Tower
  • Owner: NINANS PTE LTD, India
  • Scope Of Work: Building structural and Archi work, drain and Road works
  • Duties and Responsibilities: Supervising the Construction of Precast piles, bore piles, micro piling, Supervising the Construction of pre-cast rib beam and planks, Supervising the Construction of post tensioning works, Supervising the launching pre-cast rib beam, planks, lifts and Room Extension Works, Supervising Structural works, Supervising architectural works, Supervising the concrete work and drainage works, Coordinate and control subcontractor’s work, Checking discrepancies in the structural & architectural drawings, Construction and Supervising of Road works

Education

DIPLOMA - CIVIL ENGINEERING, Concrete Structure and Technology

LAKSHMI AMMAL POLYTECNIC
KOVILPATTI, TAMILNADU
01.1991

Skills

  • Word
  • Excel
  • Power point
  • Project Management
  • Project Planning
  • Project planning and development
  • Project Scheduling
  • Project tracking
  • Schedule Management
  • Client Relations
  • Customer Relations
  • Stakeholder Communications
  • Staff Management
  • Work flow planning
  • Advanced problem solving
  • Budgeting and forecasting
  • Risk Management
  • Document Management
  • Project estimation and bidding
  • Project scope
  • Budget Control
  • Contract Management
  • Project scope analysis
  • Technical understanding
  • Cost Control
  • Team Bonding
  • Purchasing and procurement
  • Productivity Improvement
  • Presentations
  • Technical Support
  • Construction management

Timeline

PROJECT MANAGER

KIM TIONG HUAT CONTRACTOR P/L
02.2017 - 11.2020

PROJECT MANAGER

KIM TIONG HUAT CONTRACTOR P/L
12.2014 - 01.2017

PROJECT MANAGER

KIM TIONG HUAT CONTRACTOR P/L
01.2014 - 11.2014

PROJECT MANAGER

KIM TIONG HUAT CONTRACTOR P/L
06.2010 - 12.2013

SITE MANAGER

KIM TIONG HUAT CONTRACTOR P/L
07.2008 - 05.2010

PROJECT ENGINEER

KIM TIONG HUAT CONTRACTOR P/L
12.2006 - 06.2008

PROJECT MANAGER

KIM TIONG HUAT CONTRACTOR P/L
06.2005 - Current

SITE ENGINEER

KIM TIONG HUAT CONTRACTOR P/L
06.2005 - 11.2006

SITE SUPERVISOR

HOCK CHUAN ANN CONSTRUCTON PTE LTD
05.2000 - 10.2004

SITE ENGINEER & PROJECT IN CHARGE

Ninans Pte Ltd
05.1992 - 04.2000

DIPLOMA - CIVIL ENGINEERING, Concrete Structure and Technology

LAKSHMI AMMAL POLYTECNIC

Personal Information

  • Date of Birth: 05/18/73
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married
  • Visa Status: Permanent Resident

Additional Qualifications

  • Specialist Diploma in Construction Management (SDCM - BCA Academy Singapore)
  • Pavement construction and Management (BCA Academy Singapore)
  • Safety Course for Project Manager (Scal Singapore)
  • Levelling and Setting out (BCA Academy Singapore)
  • Risk Management Course (Absolute Singapore)
  • Working Height course for Project Manager (Absolute Singapore)
  • Oil & Petrochemical Supervisor Safety Course (Ntuc Singapore)
  • Confined Space Assessor Course (Scal Singapore)
  • Building Safety Supervisor Course (BCA Academy Singapore)
  • Lifting Supervisor Course (Scal Singapore)
  • Class 3 Driving License (Singapore)

NRIC

S73653021
Soosairaj Johnson