AutoCAD Plant 3D
Pipe Support Design
Site Survey:
· Scheduling equipment location check against plot plan
· Examining pipeline routing following P&ID and isometric routine checking
· Organizing group of pipes and slop line checking
· Inspecting piping support and support span
· Setting right platform, ladders and stairs following correct position
· Arranging valve operators' inaccessible position and condensate assembly to be near column
AutoCAD Plant 3D
Mechanical CAD
Cad Worx Plant 3D
Navisworks Freedom 3D
3D Model & Mechanical Design
P&ID’s & BOQ Preparation
Specification Creation
MS Office Suite (Outlook, Excel, Word & Access)
GA Drawing & Layout
Isometric Drawing Preparation
2D drawings Preparation
AutoCAD Plant 3D
3D skid drawings & vessel drawings, place equipment in model
CADWorx 3D Piping, Structure & 3D Equipment Modelling
AutoCAD 2D isometric preparation & Isometric checking
1) Data Collection: Gather all necessary information including equipment specifications, piping details, valve types, sizes, and numbers, as well as instrumentation details.
2) Valve List Preparation: Create a comprehensive list of all valves used in the system, Include details such as valve tag number, valve type (e.g., gate valve, ball valve), size, material, pressure rating, and service description.
3) Line List Preparation: Develop a detailed line list that identifies all piping lines in the system. Include line number, line size, material, design pressure, design temperature, line class, and line description.
4) AutoCAD Drawing Setup: Set up the AutoCAD environment with appropriate layers, linetypes, and blocks for valves and piping components.
5) Drawing Creation: Use AutoCAD to draw the P&ID based on the collected data. Place valves and instrumentation symbols at appropriate locations along piping lines.
6) Symbolization: Assign symbols to represent valves and other components accurately. Use standard symbols or customize them based on project requirements.
7) Annotation: Label valves, lines, equipment, and other components with relevant information such as tag numbers, sizes, and specifications.
8) Verification and Review: Thoroughly review the P&ID and line list to ensure accuracy and consistency with project requirements and standards.
9) Revision Control: Implement a system for managing revisions to the P&ID and line list as the project progresses, ensuring that all changes are properly documented.
10) Finalization: Once the P&ID and line list are complete and approved, finalize the drawings and lists for use in the design, construction, and operation of the system.By following these steps, you can effectively prepare AutoCAD P&ID valve lists and line lists that meet project requirements and facilitate the design and implementation of piping systems.
AutoCAD Plant 3D
SAP (ERP-MM)