Summary
Overview
Work History
Education
Skills
Vessel work with
Timeline
Generic

Foo Sven

Technical Supt
Singapore

Summary

Versatile Project lead/Superintendent of 16 years’ experience with 6 years of sailing experience in the Singapore Navy. Leading projects locally and overseas, with yard operational skills, owner representative team for new build of jack up and site commissioning lead for lift boat.

Experienced in logistics and purchasing planning for maintenance programs. Site commissioning and FAT, Experienced in “Turn Key” repair and modification project.

Overview

20
20
years of professional experience

Work History

Technical Superintendent

GPK Marine Management Services Group FZ-LLC
2021.06 - Current

Manage the technical/operation aspect of the Lift boat under my care in Saudi, Taiwan, Nigeria, China, UAE(mechanical, hydraulic, electrical, structures, LSA, FFA etc.). Prepare the budget for A.F.E, manage the vessel certification including 5 years special survey, 3 monthly, half yearly and annual renewal certification. Manage the budget, schedule, work quality, vendors, yards and class surveyor.

Technical Superintendent

Teras Offshore Pte. Ltd
2019.08 - 2020.12

Manage the technical aspect of the 2 Lift boat under my care in Saudi. (mechanical, hydraulic, electrical, structures, LSA, FFA etc.). Prepare the budget for A.F.E, manage the vessel certification including 5 years special survey, 3 monthly, half yearly and annual renewal certification. Manage the budget, schedule, work quality, vendors, yards and class surveyor.

QC Lead / Site Commissioning Lead

Singapore Amerin Pte. Ltd.
2016.11 - 2019.07

Involved in the Quality Control and schedule for the production of lift-boat jacking system and hydraulic power system, manage the logistic for delivery from Singapore to china CMHI, on site co-ordinate, management and supervision of the commissioning of jacking system, hydraulic power system, firefighting and propulsion and jetting system of the Amerin 320 designed lift-boat. Settle additional claim and payment.

Supervision of installation of HPU, gearbox, pinons

Owner’s Representatives Team

Hoidi International Pte. Ltd.
2014.08 - 2016.02

Monitor and manage the progress and process of appointed management company and the yard for the construction of 2 in nos. JU2000E jack up in ZPMC and 1 in no. CJ50 jack up in CMHI yard. Station in Nantong, China. Act as the main liaison point between the stakeholder and the yard. To resolve contract dispute and set the standard for the quality of work being done. Attend FAT and commissioning on site. Prepare, submit report and critical thinking to the stakeholder. Budget control.

Operation Manager

Globalone Offshore and Marine Pte. Ltd.
2009.02 - 2014.08

Lead a team of project manager, engineer, qa/qc to drive several projects to completion. Assist the yard manager for day to day running of the yard operation. Overall in charge of the production dept. and yard support facilities, including heavy lift, forklift, scaffolding, painting and HSE

Plan, Monitor the schedule, set the direction for the supervisor and arrange for men power. After production to lead the commissioning team.

Completed D534 anchorage conversion (drillship), Java Constructor (piping laying vessel conversion), Adriatic 1 major repair job (jack up rig)

T110 major repair (drill barge) Ensco riding crew for post yard new fabrication (drillship)

Initial setup of yard facilities including quayside support facilities for ship/rig to come alongside. To convert a bare land into shipyard standard inclusive of crane, workshop layout, docking plan, storage areas, FFE, chemical disposal, heavy lift planning, quayside docking

Working with commercial, purchasing, safety, engineering, sub-contractor for project costing and project tendering. Upon completion, to settle with the various stakeholders.

Project Manager/Site Manager

Atwin Marine Engineering Pte Ltd
2001.08 - 2009.01

Liaised with owner on the concept and design, liaised with the yard for the supporting facilities and ABS for the certification. Prepare the scope of work, prepare the quotation, engineering, procurement and construction. To fabricate and install new quarter module inclusive of Steel structure, Electrical cabling, Ducting extension and additional system for module. Piping system inclusive of hot, cold, grey water and black water line. New walkway extension and new platform. Quote for additional works. Commission the system.

Payment settlement with owner, Plan, Monitor the schedule, set the direction for the supervisor and arrange for men power

Education

Diploma in Shipbuilding & Offshore Engineering

Ngee Ann Polytechnic
Singapore
2001.04 -

Professional Diploma in Leadership And People

SSTC INSTITUTE PTE LTD
Singapore
2001.04 -

Skills

Schedule Management

undefined

Vessel work with

Teras Conquest 7 (Lift boat)

Teras Conquest 5

Teras Conquest 2

Teras Fortress

Amerin 320 SEAPUP 3

FPSO Kikeh

FPSO ROSE SEA

FPSO EAGLE

Development Driller 1

Development Driller 2

D534

Adriatic 1

Java Constructor (piping laying vessel conversion)

JU2000E

CJ50

Whaleshark

Timeline

Technical Superintendent

GPK Marine Management Services Group FZ-LLC
2021.06 - Current

Technical Superintendent

Teras Offshore Pte. Ltd
2019.08 - 2020.12

QC Lead / Site Commissioning Lead

Singapore Amerin Pte. Ltd.
2016.11 - 2019.07

Owner’s Representatives Team

Hoidi International Pte. Ltd.
2014.08 - 2016.02

Operation Manager

Globalone Offshore and Marine Pte. Ltd.
2009.02 - 2014.08

Project Manager/Site Manager

Atwin Marine Engineering Pte Ltd
2001.08 - 2009.01

Diploma in Shipbuilding & Offshore Engineering

Ngee Ann Polytechnic
2001.04 -

Professional Diploma in Leadership And People

SSTC INSTITUTE PTE LTD
2001.04 -
Foo SvenTechnical Supt