Plant Maintenance career reflecting pioneering experience for diverse industries. Have a good knowledge in Engineering Maintenance and Equipment Commissioning filed.
Professional technician with solid grounding in commissioning systems and equipment. Skilled in diagnostics, troubleshooting, and system optimization. Strong focus on teamwork and achieving results. Adaptable to changing project needs, ensuring reliability and efficiency in all tasks.
Overview
29
29
years of professional experience
1
1
Certification
Work History
Mechanical Commissioning Technician Topside
MODEC PTE LTD
07.2023 - 02.2025
GTG , OTSG , STG and BOP system and equipment commissioning work
Line-up the MGO - GTC line carried out LOTO as per the mark up P&ID for line flashing
Together with Burch vendor inspect generator ND and NDE Bearing
Carried out Gas turbine compartment fire fighting system N2 and H2O cylinders line up and testing with BH vendor
Lubricate the generator cooler fan and Mineral oil cooler fan test run
As part of the OTSG commissioning activity line up LOTO the MEG-P , MEG- S and Asphaltene dissolver tanks to DEMI water storage tank with temporary N2 blanketing path.
Hook up the temporary hose to steam condenser as per mark up P&I D
Operate the temporary DEMI water plant at quayside and transfer water to vessel storage tanks
Monitor the DEMI water Conductivity ( 0.034 - 0.12) & PH (9 - 9.5) value
Carried out line-wake and LOTO as per mark up P&ID for boiler feed water line air leak test and flashing
Work as CRO run the STG condensate pump and BFW pump to flashing the boiler feed water line through Ejector condenser , Gland condenser, Activated carbon filter, Polishing unit, Condensate cooler, Startup Electric BFW heater, Condensate steam per-heater and OTSG inlet to overboard
Monitor and maintenance the water condenser water level from CCR
Prepare the steam line for steam blow activity as per Mark-up P&ID Line wake
Verify the temporary boiler, Steam blow temporary line with target plate inserter and silencer , carried out air leak test
As a steam blow member carried out the steam blow activity like Manually control the steam valve at 15 bar and target plate replacement work
As a CRO operate, monitor and control the STG, BOB System and Equipments using Honeywell Station operating system at CCR, work together with E-house and Marine team
OTSG dry out sequence , BFW line flashing , GTG-MGO line flashing and BOB system for testing
Part of the STG commissioning carried out following activities Laser Alignment, lube oil console, oil eliminator, Jacking oil system, Turing gear unit, Vacuum skid work together with BH vendor inspect , test run , verify and qualify the work condition as per the process requirement
Coordinate vendor to set up the temporary sea water pumps at quayside and hooked up discharge hoses to temporary manifold and test run for steam condenser cooling medium requirement 2500m3/hr
During commissioning period carried out preventive maintenance and condition monitoring like MGO filter replacement, BFW line strainer cleaning, Pump & Motors lubrication , Temperature and Vibration measurement
High pressure steam line to STG test run and Line up the LP steam line to heating medium heat exchanger testing
After completing commissioning activity carried out preservation N2 blanketing on water and steam lines of OTSG and STG
Streamlined work processes by implementing standardized procedures for equipment commissioning and decommissioning.
Delivered consistent results while adhering to strict safety guidelines during all phases of project execution.
Mechanical Commissioning Technician Topside
Modec Pte Ltd.
12.2022 - 06.2023
Carried out commissioning activities various static and rotating equipment
Carried out commissioning checks and steps according to the commissioning procedure
Assisting and supporting the vendor site commissioning activities
Carried out punch clearance and trouble shooting related to equipment commissioning
Carried out pump alignment verification
Carried out installation of the filters and other parts
Knowledge about PTW and LOTO system
Collaborated with a team for the successful installation, calibration, and validation of new systems.
Ensured timely project completion with efficient troubleshooting and resolution of technical issues.
Minimized operational disruptions through proactive identification of potential risks during the commissioning process.
Associate Engineer
Lonza Biologics Tuas Pte Ltd
06.2015 - 08.2022
Execute preventive / repair work orders, follows maintenance procedures & instructions on process equipment such as Bioreactors, Centrifuge, Filtration skids, Chromatography columns, Autoclaves, Glasswasher and CIP Skid etc
Service and Reinstate different type of Mechanical seals
Repair and Service the Lope, Diaphragm and Centrifugal pumps
Troubleshoot equipment problems and assure availability of process equipment for the manufacturing operations
Coordinates with external contractors for specialized maintenance work
Performs planed / scheduled improvement & development projects
Receive and organize consumables and spares needed to perform work
Carried out bioreactor, Pipe line and pressure vessel leak test.( Hydro and Pneumatic)
As per the PID prepare and carried out proper LOTO and Drain out the process system
Process equipment change over actives (Filtration skids, Chromatography columns)
Elastomer change out form in DMS and Equipment BOM list create in SAP
Agitator Mechanical seal upgrade project
Participated in root cause analysis investigations following equipment failures or malfunctions, ensuring appropriate corrective actions were taken promptly.
Reduced downtime with proactive troubleshooting of equipment issues and prompt resolution of problems.
Developed comprehensive training materials for new hires, improving onboarding effectiveness and reducing time spent in training sessions.
Wrote, reviewed and edited technical document in accordance with template requirements.
Served as a subject matter expert providing guidance on engineering best practices throughout the organization during various stages of project development cycles.
Reviewed technical drawings developed by CAD technicians and drafters.
Implemented energy-saving initiatives that resulted in reduced operational costs while maintaining high-quality output levels.
Reviewed technical documents for completeness and conformance to requirements.
Inspected, cleaned and maintained environmental test equipment, operated field sampling pumps and monitored sensitive instruments.
Applied Six Sigma principles to process control methodology.
Senior Equipment Engineering Technician
Wyeth Nutritional Singapore Pte Ltd
01.2006 - 06.2015
Perform, trouble shoot and repair work for all Nutritional plant process line equipment, which include wet, dry and packaging can and pouch line equipments
Support manufacturing activities like size change, equipments setup
Execute Predictive, Preventive and Corrective maintenance on plant equipments
Execute all administrative procedures and documentation as specified in current good manufacturing practices (cGMP)
Study related engineering aspect and machine manual in order to carry out all the work tasks
Job involves general mechanical fitting, repair and maintenance
Install new equipment with vender for process and packaging line
Set-up and adjustment can closer and clincher for different cans size
Lubricate the gears, sprockets, bearings and chains as per preventive maintenance requirement
Support the production for smooth running and reduce the down time
SAP system using for work orders and spare parts management
Set-up the can and pouch line packaging equipment for different sizes
Execute the vender and contractors in line modification and improvement projects
Upkeep and Maintenance all the tools, equipment used in workshop
Responsible for the exercising of maximum care, good judgment and behavior in preventing EHS incident
Topple can drop down conveyor modification
Can line 20 head PLF rotary filler installation project
Can inkjet coding covert to laser coding
Pouch scoop outside the pouch with robot pick and placing system
Can line conveyor modification cost saving project
3 Can case packaging for can line case packers
Powder air conveying system modification
Pouch without carton case packing line modification
Participated actively in team meetings to provide input on project direction, contributing valuable insights based on years of experience as a senior technician.
Streamlined production processes by identifying bottlenecks and implementing effective solutions, resulting in increased output.
Reduced equipment downtime by performing timely maintenance and repairs, ensuring continued productivity.
Performed routine maintenance and replaced worn parts.
Updated documentation such as technical manuals and equipment maintenance records.
Implemented rigorous safety protocols within the workplace, minimizing incidents and promoting a safe working environment.
Assisted engineers with complex problem-solving tasks, contributing to more efficient project completion times.
Maintenance Technician
Rayco Technologies Pte Ltd
03.1999 - 12.2005
Maintenance, Service and repair of rubber injection molding machine PLC control system working pressure 300 bar Rexroth power pack
Maintenance of perform cutting machine 350 bar working pressure parker power pack
Operation and maintenance of Clean room machinery and equipments
Knowledge of Trouble shooting in Electrical and PLC Control panels
Carry out plant facility maintenance air compressor, cooling tower pump and fans
Servicing and repair of hydraulic pneumatic cylinders and control values
To maintain the molding machine and minimize the breakdown
Operated varied hand and power tools to complete repairs.
Used problem-solving skills to alleviate issues efficiently with minimal supervision.
Followed safety protocols to minimize workplace accidents.
Inspected and maintained equipment to keep items in top working condition.
Completed daily, weekly, and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.
Improved equipment functionality by conducting regular maintenance checks and repairs.
Contact Visual inspection before, during and after equipment installation
Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
Troubleshot equipment breakdowns and performed preventive maintenance.
Maintenance Technician
Hofincons Industrial Service Ltd
11.1995 - 11.1998
Carry out maintenance, service and repair of steel plant equipment and machinery Essar steel - 1 HBI Plant
To maintain process plant rotating equipment centrifugal pump, screw pump, reformer FD&ID fan and blower
Servicing feed water pumps, reformer FD and ID fans
Maintain the steel plant hydraulic system and cylinders
Have knowledge in EOT crane maintenance (100 tones, 60 tones)
Overhaul different type of gearboxes
Maintenance and servicing of copper plant machinery and equipment
Anode furnaces drive system air motor with planetary gear box
Servicing and pressure testing for various types of heat exchangers in copper plant graphite modular block type and titanium plate type
Knowledge in alignment rim and face method using dial indicator and fan balancing
Maintain the equipment maintenance records and coordinate with mechanical engineer for all kinds of maintenance activity
Monitored and documented work performance in maintenance logs in compliance with company guidelines.
Revamped workshop organization, leading to more efficient workflow and easier access to tools.
Operated varied hand and power tools to complete repairs.
Used problem-solving skills to alleviate issues efficiently with minimal supervision.
Education
NTC-2 - Mechanical Servicing
ITE
Singapore,
07-2000
Diploma - Mechanical Engineering
TRNP, SBTE
India
04.1995
Skills
Pneumatic controls
Hydraulic systems
Equipment installation
Control systems troubleshooting
Motor control center
Commissioning procedures
Teamwork and collaboration
Time management
Problem-solving abilities
Multitasking Abilities
Reliability
Team collaboration
Adaptability
Continuous improvement
Personal Information
Date of Birth: 03/06/75
Gender: Male
Nationality: Indian
Marital Status: Married
Training
Customised Course in Chemical Process Technology
Bearing Application & Maintenance Course SKF
Occupational First Aider - Singapore Red Cross Society
Introduction to PLC programming
IT Power basic
AutoCAD
Class 3 and Class 2B Driving License
Work-At-Height Assessor (Integrated)
Workplace Safety and Health control Measures
Alfa Laval Separator Maintenance Training Certificate
NovAseptic Mixer Maintenance Training Certificate
Laser Shaft Alignment Training
Residential Status
Singapore PR
Certification
❖ Customized Course in Chemical Process Technology - ITE Singapore.
❖ Occupational First Aider – Singapore Red Cross Society.
❖ Introduction to PLC programming – ITE Singapore.
❖ IT Power basic – NTUC Computer Training Center.
❖ AutoCAD - NTUC Computer Training Center.
❖ Class 3 and Class 2B Driving License – Singapore.
❖ Work-At-Height Assessor (Integrated)
❖ Workplace Safety and Health control Measures
❖ Alfa Laval Separator Maintenance Training Certificate
❖ NovAseptic Mixer Maintenance Training Certificate
❖ Laser Shaft Alignment Training.
Languages
English
Tamil
Hindi
Timeline
Mechanical Commissioning Technician Topside
MODEC PTE LTD
07.2023 - 02.2025
Mechanical Commissioning Technician Topside
Modec Pte Ltd.
12.2022 - 06.2023
Associate Engineer
Lonza Biologics Tuas Pte Ltd
06.2015 - 08.2022
Senior Equipment Engineering Technician
Wyeth Nutritional Singapore Pte Ltd
01.2006 - 06.2015
Maintenance Technician
Rayco Technologies Pte Ltd
03.1999 - 12.2005
Maintenance Technician
Hofincons Industrial Service Ltd
11.1995 - 11.1998
NTC-2 - Mechanical Servicing
ITE
Diploma - Mechanical Engineering
TRNP, SBTE
Similar Profiles
Shruthi HVShruthi HV
Prequalification Coordinator at Modec Production Systems Singapore Pte. Ltd.Prequalification Coordinator at Modec Production Systems Singapore Pte. Ltd.