Have 7 years of experience working as a field installer, site engineer, Testing and Commissioning Engineer ,service for elevator and Escalator and one year. One year of oil and gas quality control at Dubai and I'm willing to work other field also.
Reason for leaving: To move on new challenges and to grow up my career at abroad using my profession skills and experience in a different capacity than I have in the past.
Reason for Leaving : to work in Singapore
Attend site meeting and safety meeting supervised total replacement for high rise machine room elevators.
SERVICE) ENGINEER ( 1 year )
- Experience in maintenance service of lifts / escalators in charge
- Plan correct work methods and procedures to ensure reliability and safe operations.
- Service for breakdowns and call-backs according to contract terms including 24-hour standby
duty.
- Release of passenger from lift mantrap according to contract terms
- Troubleshoot minor equipment faults and carry out preventive and/or corrective actions
- Prepare Maintenance Sheet and signed by customer every month.
Reason - Promote to Projects team
( 1 Year Installation & 2 Years Testing and Commissioning in KONE )
Installation, testing and commissioning all escalators until handover to maintenance team.
Supervised all the sub-contractor.
Installed high rise machine room elevators.
Supervised loading/ unloading of escalators and elevators.
Project coordination and site inspection
Servicing of elevators, escalators and mechanical-parking systems that checking, oiling, greasing,
mechanical adjustment, troubleshooting, testing of safety devices, inspection and parts
recommendation and replacement
Breakdown maintenance calls and release mantrap
Prevention and corrective maintenance works in accordance schedule perform standby works
Support service operation team to achieve department objectives on service quality standards
Prepare tester reports the condition of the lift for all the site activities
Support to the lift well security (safe for other trades and public etc) and safety of all persons
involved in the installation activities during commissioning and testing of the lift (or escalator)
Experience of managing a whole site as well as part of a project. Experience of working on
residential developments over 40mtrs and commercial building in elevator and escalators field
▪ Project coordination and site inspection.
▪ Installation, testing and commissioning for lift & escalators. (Edgar Chagwa Lungu Mall Project)
▪ Plan and coordinate lift and Escalator installations main contractor
▪ Provide technical support and assist supply development needs of the organization
▪ Report to the project manager, to manage the site engineering functions for day to day operations of project Site
‐ Certificate in Building Construction Supervisor Safety Course (BCSS) ‐ AKC, Singapore
‐ Certificate in Manage Work at Height‐3 Course (WAH‐3) ‐ Integrated Training, Singapore
‐ Certificate in Basic Training for Project Engineers Training ‐ HITACHI & ATC Thailand
‐ Certificate in Basic Training Course of Arc Welding ‐ Myanmar Railways
‐ Certificate in KONE Tirak Hoist & Safety Training for method of elevator ‐ KONE, Myanmar
‐ Certificate in Fundamentals of Engineering MEP & ELV Training
‐ Certificate in Occupational Safety & Health Orientation Course, Zambia
‐ Oil & Gas Safety training, UAE
‐ Certificate in Engineering AutoCAD (2D Drawing )