Adept at elevating safety standards and compliance across multiple high-profile projects, including Shell's $6+ billion ECC Project, achieving 39 million safe working man-hours. Excelled in roles at Soil Build and CB&I Lummus Toyo JV, showcasing exceptional risk assessment capabilities and interpersonal communication skills. Proven track record in developing innovative safety management strategies and fostering a culture of safety excellence.
Full Time WSH Personnel since year 2001 till present, and I have accumulated about 23 years of practical working experience, got a good exposure in the construction and oil petrochemical industry. I am capable of communicating with all levels of personnel, independent in decision making, and a very good team player and pro-active on the job.
As a WSH Manager for CREC Construction, was tasked to handle and boost their safety performance to their Clients, (As below mention). By implementing various enforcement and Behavioral Based safety approach to educate the workers and staffs, prepared and present to client on the company effort on Moving Forward EHS Implementation, after their fatality accident in EXYTE (Global Foundation) Project last December 2022.
Projects Handled:
1. EXYTE @Tampines (Siltronics Fab Next Project).
2. CR 101, (MCC) LTA Project, Bus Depo Project.
3. N105 And N109, Design And Construction Of North South Corridor (Tunnel), Between Suffolk Walk And Novena Rise. (Penta-Bachy Joint Venture) LTA Project.
4. C2A - Tuas Water Reclamation Plant. Koh-Brothers - China Harbor Joint Venture.
5. J106, Design And Construction Of Boon Lay Station And Viaduct Including Addition And Alteration To The Existing East West Line (EWL) Boon Lay Station For Jurong Region Line. (China Communication Construction)
6. J120, Design And Construction Of Integrated Transport Hub At Jurong East. (China Communication Construction)
7. N107, SAMSUNG Design & Construction of North-South Corridor ( Tunnel ) Between Toa Payoh Rise & Marymount Lane.
8. New Mandai crematorium (NMC)- SANTARLI CONSTRUCTION PTE LTD
Track Record - Won, HDB Best Safety Award, Zero Reportable Incident.
Track Record- Track Record-1.5years project, Zero Reportable Incident.
Soilbuild Construction Group is an integrated property developer with a development portfolio of mid to high-end residential properties and business space properties for multi-national corporations, HDB and SMEs. With an established track record of more than 30 years, the Group has successfully acquired and developed a range of residential properties mainly in prime urban districts with features that appeal to cosmopolitan buyers. Currently 10 ongoing projects, I was handling 2 projects, able to handle multi task.
As a Developer’s WSH Officer it requires:
Projects Handled
Achievement / Track Records Set
Proposed Erection Of A Block Of 28-Storey Residential Flats (Total 162 Units) With MSCP At 1st To 4th Storey, Sky Terraces At 5th And 14th Storey and Communal Facilities On Mk17 Lot 07061a At 3 Jalan Kemaman (Novena
Planning Area) - A1287-00005-2018
Proposed Erection of 10-storey Multiple-User General Industrial Factory (Total 186 Units) with Temporary Ancillary Industrial Canteen and Mezzanine for Ancillary Office on Lot 04882L MK 06 at Corporation Drive.
Proposed Erection Of A Multiple-User General
Industrial Development Comprising Of A 7-Storey Ramp Up Factory Building (Total 45 Production Units), A Temporary Ancillary Staff Canteen (Total 1 Unit) And Other Ancillary Facilities On Lot 04728c Mk 7 At Tuas Bay
Track Record-1.5 million, Safe Manhours
Public Housing Development Comprising 6 Blocks of 16/17 – Sty Residential Bldg (Total 1178 Units) With Multi-Storey Car Park, Commercial/Community Facilities, Precinct Pavilions & Park at Sembawang Crescent/Sembawang Way.
3 years project
Is the most iconic Business development at the fringe of Singapore’s CBD. This is a BCA Green Mark Platinum building, with about 69,000 sqm GFA, consisting of two Business 1 towers and a 3-storey retail podium, as well as lifestyle amenities like a recreational pool, childcare and enrichment centres, supermarket, shops and F&B outlets to meet the needs of new generation of knowledge workers. Aperia is ideal for a range of high-spec manufacturing, light operations and clean industries.
The Mezzo is a freehold apartment located at 205 Balestier Road,
Is a freehold apartment located at Margate Road in district 15 near Kallang MRT Station. It will be completed by 2014 and will comprise of 55 units. It is located in the vicinity of Singapore’s largest and most popular park, East Coast Beach and Katong Park.
2 years project
Track Report – Zero Reportable Incident
Joint Venture by CB&I Lummus TOYO JV appointed by Shell (Company) for construction of Ethylene Cracking Complex (ECC Project).Construction of ECC project is been undertaken at Pular Ular, Singapore. This is a multibillion-dollar (approximate $6+ billion) project. Ethylene Project Construction Management (EPCM) responsible for design, engineering procurement, construction and cold commissioning. The Team ECC Safety Management System for the construction phrase for this project compromised with Team ECC SMS plan and procedures comply with ISO 18001. All construction company involves in the project will be identified as Implementation Contractors (IC). Achievement 39 Million Safe Working Man-hours.