Overview
Work History
Education
Skills
Accomplishments
Certification
Timeline
Generic

Zay Yar Win

Overview

11
11
years of professional experience
1
1
Certification

Work History

Project BIM Manager / VDC Lead

Lim Wen Heng Construction Pte. Ltd, ENGINEERING PTE LTD
04.2022 - Current
  • TAMPINES N9 C10-12 & PK_HDB BTO _ Tampines Greenquartz / PROPOSED PUBLIC HOUSING
  • DEVELOPMENT COMPRISING 13 BLOCKS OF 10/12/13/14/16/17-STOREY RESIDENTIAL BUILDINGS (TOTAL 1613 UNITS)
  • WITH 2 MULTI-STOREY CAR PARK, 2 ESS, 4 PRECINCT PAVILIONS, SOCIAL COMMUNAL FACILITIES & PARK AT TAMPINES
  • STREET 95/STREET 96 (TAMPINES PLANNING AREA)
  • Planning and setting of project requirements, processes and workflow and BIM activities to ensure timely completion within targeted project schedule
  • Monitoring closely to team to deliver for updated and coordinated models based on latest information for all trades and areas including PPVC and precast
  • Prepare and present VDC/ ICE session bi-weekly intermediary between architects, engineers and specialist for coordination geometry and technically matters
  • Submit Digital mock-up unit using Escape
  • PPVC tracking and detail installation workflow
  • Implementation for new HDB BTO IDD project of 17 uses cases to adopt as company standards
  • Managing BIM software for BIM users’ subscriptions of Autodesk Construction Cloud Docs, Autodesk build and BIM collaborate pro
  • Projects Title: Macpherson Nursing Home _ MOHH
  • BIM coordination, BIM virtualization
  • BIM model submission to MOHH to MOHH's portal, CASE portal
  • Handover BIM model and RDS & RLS to end user with Cobies requirement/ BIM 6D facilities management

BIM & VDC Manager

Right Construction Pte. Ltd
11.2018 - 04.2023
  • Projects Title: HDB BTO _ UBI GROVE _ GEYLANG C29-30 PARK- PROPOSED PUBLIC HOUSING DEVELOPMENT
  • COMPRISING 12 BLOCKS OF 10/12/14/15-STOREY RESIDENTIAL BUILDING (TOTAL 1193 UNITS) WITH 2 BLOCKS OF MULTI-
  • STOREY CAR PARK, ESS, PRECINCT PAVILIONS, COMMUNITY FACILITIES & PARK AT UBI ROAD 3 AND UBI AVENUE 1 & 2
  • Develop VCD Execution Plan according to HDB contract Spec
  • Digital Mock-up Units for residential blocks, Child Care Center, Link brides and DOP using VRcollab
  • Present regular ICE sessions with all state holders and use virtual reality for real-time visualization and coordination to get a response in shortening the time
  • Design review session of improving design for common areas to assist architect, consultants and HDB
  • Coordination federated models and summaries of RFI submission to support project team
  • PBU, HCS, precast installation drawing, C&S drawing, detail drawing to integrate into C&S BIM Models
  • Preparing as-built model submission as per contract requirements
  • Organize and train in-house & sub-contractor VDC team to model and analysis with VRcollab and Navisworks
  • Projects: HDB BTO _Punggol Northshore Cove /PNC4_ INTEGRATED DEVELOPMENT SITE OF PUNGGOL NORTHSHORE
  • DISTRICT FOR PUBLIC HOUSING (PHASE 5:C4), PLOT 7 COMPRISING OF 4 BLOCKS OF 26-STOREY RESIDENTIAL BUILDING (801 UNITS) WITH 1 STOREY BASEMENT CARPARK, CHILDCARE CENTRE, COMMUNITY FACILITIES, ESS, PRECINCT PAVILION
  • SKY TERRACE AND COMMUNAL ROOF GARDEN AT NORTHSHORE CRESCENT (PNC4)
  • Develop BIM Execution Plan and BIM models for 4 residential blocks with basement carparks
  • BIM visualization and walkthrough with Autodesk Live
  • Construction sequencing and schedule with construction 4D BIM model to present BCA using Asta power project
  • Coordination for M&E and structural design basement carpark, level-1 high level and roof gardens
  • Funding awarded by BCA for BIM implementation, coordination and collaboration among stage holders
  • Projects: HDB BTO _ANG MO KIO N2 C32A _ 380 units (Implementing IDD for project & company since Sept 2021)
  • PROPOSED PUBLIC HOUSING DEVELOPMENTVCOMPRISING 2 BLOCKS OF 29-STOREY AND 4/23/29-STOREY
  • RESIDENTIAL BUILDING (TOTAL 380 UNITS) WITH MULTI-STOREY CAR PARK, ESS, PRECINCT PAVILION, COMMUNAL ROOF
  • GARDENS & COMMUNITY FACILITIES
  • Summaries of IDD use cases for implementation such as ICE, Visualization and design checks, Digital submission & approval for Document Review, BIM-based documentation, Digital QA/QC Inspection
  • Digital handover
  • Approved from BCA to start adopting IDD with funding

BIM Engineer, technical department

Qing Jian International, South Pacific
11.2017 - 10.2018
  • HDB BTO _ West Plain at Bukit Batok / PUBLIC HOUSING DEVELOPMENT COMPRISING 10 BLOCKS OF17/18/19-STOREY RESIDENTIAL BUILDING (TOTAL 1962 UNITS) WITH 2 BLOCKS OF MULTI-STOREY CAR PARK
  • COMMERCIAL/ COMMUNITY FACILITIES, PRECINCT PAVILIONS, BIN CENTRE & ESS AT BUKIT BATOK STREET 41, BUKIT
  • BATOK WEST AVENUE 5/8/9
  • BIM modeling (AR, ST &MEP) to complete coordinated underground services including PWCS
  • Coordination high level CSD and prepare for CBP model and drawings submission
  • Collaboration data from HQ server to project sites with all BIM team members
  • Monthly submission to HOD BIM development reports
  • Prepare to get high scores of construability of BIM/VDC/ICE for all on-going projects
  • Projects: Lequest Executive Condominium (Mixed development with PPVC) at Bukit Batok
  • Assigned to technical department head at HQ
  • Review and updating PPVC module Revit models to deliver site BIM teams
  • Involved in company BIM standards such as creating PPVC steel module, M&E filter & services color
  • Monthly BIM development reports and prepare C score of BIM/VDC/ICE for all projects
  • BIM models and coordination including PWCS
  • Coordination underground and high level CSD and CBP model and drawings submission with other team members
  • Projects: HDB BTO _Melody Spring at Yishun/ N4 C21A & C21B / PUBLIC HOUSING DEVELOPMENT COMPRISING 2
  • BLOCKS OF 16 STOREY RESIDENTIAL BUILDING (TOTAL 172 UNITS) WITH MULTI-STOREY CAR PARK, COMMERCIAL/
  • COMMUNITY FACILITIES, PRECINCT PAVILIONS, BIN CENTRE & ESS AT WOODLANDS NEIGHBOURHOOD 7 CONTRACT 33
  • BIM modeling and coordination for M&E services for all block & units
  • Coordination underground and high level CSD and CBP model and drawings submission with other team members
  • Monthly BIM development reports and prepare C score of BIM/VDC/ICE for all projects

Project Engineer cum BIM coordinator

New Asia M&E Pte Ltd
10.2015 - 10.2017
  • Project Title: Office, Carpark and Utilities Plant at NUH/ PROPOSED ERECTION OF 7/9-STOREY UTILITY /SERVICES
  • BUILDING WITH OFFICES, CAR PARK, M&EPLANTS & ANCILLARY SERVICES AT EXISTING NATIONAL UNIVERSITY HOSPITAL
  • SINGAPORE MK 03 ON LOT 04344K,04898X & 04901W AT LOWER KENT RIDGE ROAD (QUEENSTOWN PLANNING AREA)
  • Create BIM models to meet the contract BIM spec and BEP given
  • BIM modeling, coordination and liaison with client/owner for as-built Asset BIM models
  • To comply with PUB’s/ FSSD’s requirement for site installation (Under & above ground) and material/equipment’s selection to order in advance
  • Attend BIM Progress Report Meeting and submit the report in time
  • Attend MOHH’s requirement for BIM presentation at HQ
  • Attend BIM meeting with MOH for as-built model and OMM submission
  • Prepare for as-built models accordingly with facility management model requirement such as input
  • Cobie’s data
  • Project Title: JTC food Hub at Senoko Sembawang (LIGHT INDUSTRAIL BIM PROJECT)
  • Plumbing Sanitary Gas Fire and RWDP services modeling and coordination with all parties from
  • Underground CSD to Roof CSD and detail installations of services within the given space
  • Attending BIM meeting with third parties BIM consultant to meet JTC BIM workflow and standard
  • High accuracy as-built models’ submission for ready to convert FM model as per client’s instructions

BIM modeler

A's M&E Pte Ltd
08.2014 - 10.2015
  • School of law & business building (Latest and Iconic building of SMU)
  • Modeling plumbing & sanitary services for top-down construction of two basements
  • Prepare concrete body plan/ CBP opening drawing for structure models
  • Coordination and collaboration BIM models with Kajima BIM team for combined services drawings
  • BIM standards from BEP to meet the procedure such as filter, system, etc

Project Title: NCID, National Center of Infection Disease, NCID Hospital/ PROPOSED ERECTION OF NATIONAL CENTRE

FOR INFECTIOUS DISEASES, CENTRE FOR HEALTHCARE INNOVATION WITH BASEMENTS AND ANCILLARY WORKS AT

JALAN TAN TOCK SENG

  • Project setting up based on mater model and updating Revit family for larger scale BIM project
  • PSG and RWDP services modeling, coordination for basement 3 to Level -2
  • Prepare BIM documentation such as Shop Drawings, CBP & presentation slides

Lead of projects support department Project

Pte Ltd. Ley Choon Group
07.2012 - 08.2014
  • Laying of High-pressure Gas Transmission Pipelines from Tuas West Avenue to Upper Jurong Road TL4.1 B &
  • C and TL4.3 A&B (Total 4 Power Gas projects)
  • Design and coordination for High-pressure Water/Gas Pipeline of Power Gas/ PUB the contracts of EPC
  • Engineering Procurement Contracts
  • Tendering for new projects and quantity take out for materials orders especially pipes and bends
  • Assist to Project Director for Technical Reports & Submissions
  • Complete two gas transmission pipeline projects including 2.2m diameter and 600m long tunneling, off- take station, tap-off and T&C woks
  • Project: Laying and rehabilitation underground pipe for PUB contracts, water pipe department
  • Update services plan in MicroStation format for as-built submission to PUB for underground utility infrastructure projects.

Education

Some College (No Degree) - Building Information Modeling

BCA Academy
Singapore

Diploma - Mechanical (Power) Engineering

Government Technical Institute Hawbi

Certificate in DFMA Principles and Applications, BCAA (Module-A of SDDFMA) - Yangon Science Mathematics

BCA Academy
09.2022

1/4/2016 to 7/25/ - D

D
D
2016

Skills

  • Lead Scoring
  • Lead Prospecting
  • Manager Consultation
  • SQL Manager

Accomplishments

  • D, 3D & ISO (CCK Training Centre)
  • Conclusion;
  • BIM Management such as team set-up/recruiting, training, progress monitoring
  • Construction knowledge and installation details for coordination
  • Code compliance and HBD standards
  • Software licenses and basic IT knowledge
  • Communication and sharing information and knowledge among project internal and external parties

Certification

Certificate in Computational BIM, BCAA (Rhinoceros 3D & ArchiCAD) Certificate in Asta Power Project BIM (project scheduling software trained by CSG) Construction Certificate in MicroStation V8i (Knowledge and practicing in latest version of Bentley software such as MicroStation Connect, OpenBuilding and OpenPlant P & ID) Certificate of participation in API 570 Piping Inspector (Knowledge in Solidworks 3D Modeling) Safety Course for Project Manager (SCAL Academy) & BCSS Certificate of Advanced Surveying and Survey Instruments Application (SUNTAC Education Center), Additional Certificates Certificate in Navisworks Manage (4D, 5D, Coordination with FUZOR) Building Construction Supervisor Safety Course (BCSS) Work- At -Height Course for Supervisor (WAHS) Certificate in Revit MEP 2012 (MMK Engineering Training Centre) Certificate in Engineering Drawing (Sea Gate Computer Training Centre) (M&E Drafting and Specialize of installation in ACMV, Plumbing, Sanitary and Electrical) Workshop Technology Training (Myanmar Engineering Society) Certificate in Auto CAD 2010

Timeline

Project BIM Manager / VDC Lead

Lim Wen Heng Construction Pte. Ltd, ENGINEERING PTE LTD
04.2022 - Current

BIM & VDC Manager

Right Construction Pte. Ltd
11.2018 - 04.2023

BIM Engineer, technical department

Qing Jian International, South Pacific
11.2017 - 10.2018

Project Engineer cum BIM coordinator

New Asia M&E Pte Ltd
10.2015 - 10.2017

BIM modeler

A's M&E Pte Ltd
08.2014 - 10.2015

Lead of projects support department Project

Pte Ltd. Ley Choon Group
07.2012 - 08.2014

Some College (No Degree) - Building Information Modeling

BCA Academy

Diploma - Mechanical (Power) Engineering

Government Technical Institute Hawbi

Certificate in DFMA Principles and Applications, BCAA (Module-A of SDDFMA) - Yangon Science Mathematics

BCA Academy

1/4/2016 to 7/25/ - D

D
Certificate in Computational BIM, BCAA (Rhinoceros 3D & ArchiCAD) Certificate in Asta Power Project BIM (project scheduling software trained by CSG) Construction Certificate in MicroStation V8i (Knowledge and practicing in latest version of Bentley software such as MicroStation Connect, OpenBuilding and OpenPlant P & ID) Certificate of participation in API 570 Piping Inspector (Knowledge in Solidworks 3D Modeling) Safety Course for Project Manager (SCAL Academy) & BCSS Certificate of Advanced Surveying and Survey Instruments Application (SUNTAC Education Center), Additional Certificates Certificate in Navisworks Manage (4D, 5D, Coordination with FUZOR) Building Construction Supervisor Safety Course (BCSS) Work- At -Height Course for Supervisor (WAHS) Certificate in Revit MEP 2012 (MMK Engineering Training Centre) Certificate in Engineering Drawing (Sea Gate Computer Training Centre) (M&E Drafting and Specialize of installation in ACMV, Plumbing, Sanitary and Electrical) Workshop Technology Training (Myanmar Engineering Society) Certificate in Auto CAD 2010
Zay Yar Win