Project engineering and construction professional with substantial experience in managing complex projects from inception to completion. Skilled in coordinating and supervising cross-functional teams, ensuring adherence to timelines, and maintaining high standards of quality. Expertise in project planning, resource allocation, and risk management. Known for effective problem-solving, adaptability to changing project requirements, and consistent delivery of results.
Overview
28
28
years of professional experience
Work History
Project Engineer (COW / MC / Integration / N2He)
BW Offshore
08.2023 - Current
Follow up Marine COW / MC / Integration works activities to complete ontime.
Review and supervise all remaining MCRs and Punch items onsite and signed off in Lucy system.
Liaise with engineering team / Vendors / Supply Chain / Yard team for remaining packages' installation and completion.
Lead and supervise the construction team to complete all outstanding packages, MCRs and punch items to be closed in system.
Involved DAC/TRI inspections and AREA completion inspections, raised punch items in Lucy, carried out clear punch items and closed in Lucy system.
Review N2He leak test packs with piping hydrotest packages / other disciplines packages to prepare require documents for N2He test on site.
Project Engineer / Coordinator
BW Offshore
Singapore
05.2023 - 08.2023
Assist to Construction Manager for scope of work preparation for subcontractors.
Review all MTOs from engineering, feedback to estimator to prepare BOQs.
Follow up with Engineering Team for FEED documentations & Demolition scopes to prepare for construction phase.
Liaise with engineering, supply chain, contractors and construction team for client’s requirements,
Construction Manager / Coordinator / Project Engineer
BW Offshore
Port Gentil, Gabon
04.2021 - 05.2023
Review all contractors’ proposal, chosen the best contractor to fabricate the structures and piping system along with technical evaluation as per project requirements.
Closely monitor for fabrication progress at yard and feedback to management when necessaries to take action for any challenges.
Assist to project manager for approval of contractor’s invoice, investigate of any claims which not related to project scopes.
Perform a interface coordinator role with Engineering / Maintenance / Operation / Supply Chain Team to meet project goals.
Lead the offshore installation team, plan the schedules, preparation of method statements, permit to work and acknowledgement the completion of works onboard.
Attend the PTW and safety meetings, discuss with vessel management to execute the projects works safely with time management.
Chair the daily project meetings to address the works related issues including safety issues, reviewing of SOC cards raised by team members.
Project Engineer
BW Offshore
Aberdeen, UK
03.2019 - 03.2021
Ownership for the Risk Ranking Register to manage all MOCs, TQs, Technical Assurances, Reports and all Items Associated with Risks for FPSO operations
Coordinate / prepare / involve the Gas Process Shutdown and Operation Full Shutdown Activities
Assist to Technical Maintenance Manager for operation issues and other FPSO operational requirements
Perform a interface coordinator with Engineering / Maintenance / Operation / Supply Chain Team to meet project goals
Project Engineer / Workpack Coordinator
BW Offshore
Lagos, Victoria Island
04.2015 - 02.2019
Responsible for Interface Coordinator, Construction Coordinator and Project Coordinator of Life Extension Project
Ownership for the WP Register to manage all requested MTOs & JCs and control / monitor the all works activities of LEP work packs
Performed an Engineering Coordinator role and assist to Engineering Manager and interface between all disciplines engineers to complete all the Brown Field Engineering Documents and Procedures prior to fabrications and constructions
Act as a Mini-project manager for assigned project activities including planning and scheduling of the tasks, effective communication and coordination with the involved departments and disciplines to assure project completion and HSEQ requirements
Monitor and Coordinate for all MTO, BOM and PSR_MSR status and follow up closely with Supply Chain to finalize the Materials with the Project’s requirement
Supervise and monitor for all Mechanical Equipment’s deliveries and preservation works at WH
Assist to PM for Budgets and Define the scopes of Life Extension Project
Project Engineer (Topside)
Modec Offshore Production Systems Pte Ltd
Singapore
08.2014 - 04.2015
Coordination with package engineers, process engineers and piping engineers to complete all the procedures of topside modules systems and sub-systems prior to fabrications
Monitor and coordinate for all ECNs and TQ status and follow up closely to finalize with the process requirement as per clients’ general technical descriptions
Performed integrity checks for all isometric drawings with Navis-work 3D model and feedback to engineering team for any discrepancy of design requirement
Review for all topside modules Navisworks model and P&ID drawings to check any discrepancies and feedback to process engineering to update P&IDs according to the client’s process requirement
Mechanical Supervisor (Construction / MC)
Sevan Drilling
Qidong, China
12.2011 - 06.2014
Overall in charge for all Mechanical Equipments (AKMH Drilling equipments and Hull & Marine equipments) arrival & acceptance (BFE & 3rd Party) inspection and installation on Cylindrical Type Semi-submersible Drilling Rig as per Norsok Std (DNV) class requirement.
Regular daily visit to on site to inspect and witness for Mechanical Equipment’s foundation and installation on the Rig as well as to prevent potential issues.
Coordinate with all construction discipline teams in Mechanical walk-down Inspection and punch listing, verifications and clarifications.
Liaise with Cosco Construction Team, MC Team, Commissioning Team and Engineering team to address the root cause of punch items and supervise the technicians and sub-contractors to clear efficiency.
Performed the mechanical completion and area completion inspections for all mechanical equipment, rooms and various types of storage tanks.
Perform acting assistant MC Manager, checked, verified and signed out for ready for commissioning certificates on behalf of MC Manager.
Follow the Sea-trail to continue and complete all the outstanding works and MC packages and hand over to commissioning within schedules.
Package Engineer (Hull & Marine)
Modec Offshore Production Systems Pte Ltd
Jurong East, Singapore
09.2011 - 11.2011
Prepare MFE for 11 Hull and Marine’s mechanical equipment packages, such as (MGPS, UV Sterilizers, Electric Calorifiers, Pressure Relief Valves, Deluge Water Valves, Deck Deluge Foam Valves, Helideck Foam Monitors & Tanks, Foam System, Ballast Eductors, COW Machines, PV Valves)
Prepare for IDC & IFB documents for above mentioned mechanical packages as per clients GTD (General Technical Descriptions)
Participate the department meeting for discussion of project’s issue with all different disciplines to meet the client’s requirement
Field Engineer (Construction / MC)
Modec Offshore Production Systems Pte Ltd
Jurong Shipyard, Singapore
10.2010 - 08.2011
Supervise the all sub-contractors for installation of all topside modules and integration works for Hull, Pipe-racks and Topside Modules as per SOLAS Std to complete within the schedules
Lead the mechanical team for Installation, Alignment, Inspection, Witness and supervising for all topside modules, such as Power Generations (DRESSER - RAND), Gas Compression (Man Turbo), Cooling & Heating Medium, Gas Processing, Separations, Flare Tower, Open & Closed Drain, Hydraulic, Air Compressor & Utility Air System and Sub-systems
Coordinate for the valves management & installation, valves tags & safety lock devices installation & punch lists clearance for all topside modules
Coordinate with all construction discipline teams in Mechanical walk-down Inspection and punch lists verifications of Installed skids and Vendor’s skids packages
Monitor the Projectools project management system for all the modules and systems status to Feedback to Engineering, Construction, Mechanical Completion and Commissioning teams for any discrepancy between onsite and engineering design to update as built
Performed inspection for punch list clearance, ITRs signed out and assist to the commissioning team to continue pre-commissioning and dynamic commissioning for Turbine Generator, HP/MP/LP Gas Compressors, Chemical Injection System, Heating Medium, Cooling Medium, Separation System, Nitrogen, Utility Air & Instrument Air systems and sub-systems
Sr Mechanical Commissioning Technician
SBM Offshore
Keppel Shipyard, Singapore
06.2010 - 10.2010
Installation, Alignment, Inspection for 25 Tons Stick Boom Cranes (Appleton)
Installation, Alignment, Inspection, Witness and supervising for all topside modules, such as Power Generations (Solar Turbines - Mars 100), Gas Compression (Siemen), Portable Water, Cooling Medium, Gas Processing, HP/LP flares, Flare Tower, Open & Closed Drain, Hydraulic, Air Compressor & Utility Air and Diesel systems
Performed pre-commissioning and dynamic commissioning for Solar Turbines, Gas Compressors and Cooling Medium
Assistant Mechanical Commissioning Engineer
SMOE Pte Ltd
Sembawang Shipyard, Singapore
10.2009 - 06.2010
Lead the team for pre-commissioning & commissioning for Fire water and Deluge, Pedestal & Bridge Cranes load test, Solar Turbine Generators (Taurus 70), Lifeboat, HVAC, Compressor Turbine (Man Turbo & Solar Titan 130), Chemical Injection, Portable Water, Cooling Medium, Open & Closed Drain, Gas Compression, Hydraulic, Air Compressor & Utility Air and Diesel systems
Monitor the PIMS project management system for Project status, Modules & Systems Installation status, ITRs status and Punch Lists clearance
Coordinate with vendors and all disciplines to complete the project on time
Sr Mechanical Maintenance Technician
Prosafe Offshore Pte Ltd
Keppel Shipyard, Singapore
01.2009 - 10.2009
Walk down and punch lists verification for all topside modules & sub-systems
Preservation and maintenance works for all Topside Modules Systems, such as Oil Separation Module, Produce Water & Treatment Injection Module, Gas Compression Module, Gas Glycol & Dehydration Module, Chemical Injection Module, Turbine & Boiler Module, Pipe rack (Fresh Water, Portable Water, Fire & Gas, Seawater cooling and IG systems), Main Deck, Flare Scrubbers and Turret Module to prevent of Dust, Water, Oil and any Contaminated materials
Mechanical Commissioning Technician
Conocophillips
Sembawang Shipyard, Singapore
01.2008 - 12.2008
Inspection for piping systems (Fresh water, Portable Water, Seawater, Fuel oil, Lube Oil, Diesel Line, Utility Air, Instrument air, Boiler Feed water) before commissioning was carried out
Performed the lube oil flushing, chemical treatment and heat curing for turbine and steam generator
Performed pre-commissioning and dynamic commissioning for Turbines (MS 5001 Nuovo Pignone), Heat Recovery Steam Generators (HRSG), HP/MP/LP Compressors, HP/LP Flare Knockout Systems, HVAC Systems, Utility Air System and Steam System
Mechanical Supervisor
Seadrill
KeppelFels shipyard, Singapore
01.2007 - 09.2007
Supervised a group of technician and carried out the equipment installation
Performed the pre-commissioning and commissioning with client’s engineers and vendors for Crane, Portable Water/ Fresh & Sea Water/ Water Maker systems, Deluge and Foam system, Deck Drain system and Fuel System
Mechanical Supervisor
CPD Oilwell International
Keppel Benoi shipyard, Singapore
12.2005 - 11.2006
Supervised technicians and carried out the equipment installation and alignment
Assist to client’s engineer to perform pre-commissioning and commissioning
Performed the maintenance and repair for the mechanical equipments
Production Engineer
07.2004 - 11.2005
Working as a Production Engineer at Numonyx Plant for installation, commissioning, functional testing, setup, maintenance, troubleshooting for fully automated robot machines with Vendors
Sr. Associate Engineer
Chartered Semiconductor Manufacturing
04.2000 - 03.2004
Responsible for process control, qualification and fine tuning of the manufacturing requirement as well as performed the preventative maintenance for Quarterly, Semi-annual & Annual PM.
Sr. Production Technician
06.1997 - 04.2000
Working as a Sr
Production Technician at Metalplas Engineering Pte Ltd
For Inspection, Assembly and Installation of Lifts & Escalators for new public housing estate and new commercial building
Education
Master of Science - Mechanical Engineering
Nanyang Technological University
Singapore
01-2003
Bachelor of Engineering -
Yangon Institute of Technology
Yangon,Myanmar
01-1995
Skills
Barossa Opal FPSO, Gas Field Development Project, Singapore
Sakarya Gas Field Development, Phase 2A, FPU Project, Singapore