Innovative task-driven professional with a decade of experience in construction management. Proven track record of successfully managing multi-million-dollar projects from design to delivery. I bring forth expertise in project management, quality control management, planning, and scheduling in every role I take on.
Overview
14
14
years of professional experience
6
6
years of post-secondary education
3
3
Languages
Work History
QA/QC Engineer
Techniques Air-Conditioning & Engineering Pte Ltd
04.2021 - Current
Assist in the implementation of Project Quality Plan. Prepare weekly reports and conduct regular meetings with clients and trade partners.
Manage Testing schedule for RTO/Client witnessing and ensure compliance with the project requirements.
Perform internal and external benchmark inspections with consultants and clients. Use smart sheet for daily GO/NO-GO inspections meetings.
BIM360 – Create, update, and close checklists, Equipment tracking logs, and Issues.
Lead the team in the installation, testing, and commissioning of piping systems, tanks, and equipment replacements.
Assist the team in the preparation of bidding documents and prepare BOQ.
Develop project procurement plan and responsible for MTO take-off and follow-up. Share responsibility for managing project resources such as manpower allocation, material issuance, sub-con coordination using Tower cranes, lorry cranes, and lifting machines.
Attend daily toolbox meetings, participate in safety site walks, and community meetings. Assist project manager in preparing MOS and RA.
Responsible for material storage of pipes, tanks, pumps, valves, motors, and equipment based on the Ingress Protection (IP) classification and material handling using lifting machines.
Prepare quality documents (ITP, field progress, Weld map, NDT, Pressure test procedure), and all testing reports.
Coordinate with various parties on project development (Fabricators, Suppliers, Consultants, Clients, and Third-Party Inspectors).
Prepare NOI (Notification of Inspection) and perform Incoming/In-progress & Final inspection with consultants/Clients & Non-Conformance Report (NCR) for any findings on the quality of materials.
Prepare progress claims documents and highlight job activities out of scope to project manager for variation order and preparing site work instruction reports and manpower reports for Y.O activities.
Prepare work status chart, weekly tracking list, and daily report.
Prepare the final dossier and maintain all reports throughout the project. Assist with the electrical and automation team for panel building, SCADA programming, and electrical testing.
Project Engineer
Omni-crest Engineering Pte ltd
06.2019 - 03.2021
Project Engineer
Cyclect electrical Pte ltd
06.2013 - 07.2019
QA/QC Engineer
GE India Industrial Pvt ltd
07.2010 - 07.2013
Overseeing Metrology and Mechanical Lab operations.
Defining qualification requirements and communicating them to suppliers, collaborating with sourcing and engineering teams.
Verifying reports based on quality standards such as IS, IEC, and BS. Occasionally traveling to supplier sites for audit performance activities and third-party inspection (TPI) follow-ups.
Developing standardized practices and procedures to ensure compliance in a rapidly changing growth environment.
Engaging with suppliers on Root Cause Analysis (RCA) and Corrective Action Implementation (CAPA), and continually monitoring to resolve any deficiencies identified by audits or product non-conformities.
Monitoring the calibration status of measuring and testing equipment used within the business area.
Proficient in utilizing 7 QC tools, 5WHY, Geometric Dimensions and Tolerance (GD&T), and Global 8 disciplines (G8D).
Conducting Incoming, In-process, and Final inspection activities in fabrication.
Creating Inspection Test Plans, reviewing QC documents, and witnessing Welding Procedure Specifications (WPS) and Procedure Qualification Records (PQR).
Handling gauges and instruments including Sound level meters, Dry & Wet film thickness gauges (DFT & WFT), Coating thickness gauges, surface profile comparators, and Thermo-anemometers.
Verifying calibration certificates of machines and measuring instruments. Performing Dye Penetrant Tests (DPT), and coordinating with third parties for Radiography (RT) interpretation and techniques.
Coordinating with test houses and inspection agencies.
Preparing final documents and verifying them before dispatch
Project Title, Co2 Recovery piping, Oxnerz Neste oil, Consultantz Jacoqs, Project Engineer, Responsible for steel pipes and supports fabrication, inspection, installation, Testing & commissioning for the various service pipelines includes Co2 process, cooling water, and waste water, Engaged with sub-contractors for hot dip galvanizing, painting, insulation, instrumentation. Responsible for LOTO, material handling, Assisted with WorleyParsons for documentation and prepared final dossier
Project Title, 1. 2600 liter saline Mixing tank with PLC system, 1000 liter CIP tank and 200 Liters process tanks. 2. Packaging line installation, Clientz Novartis / Alcon, Project Engineer, Responsible for fabrication, inspection, installation, Testing & commissioning of Stainless-steel tanks and pipes, Installed in-line packaging machines, Autoclave, Alfa Laval pumps, GEM' valves, Mettler Toledo weighing, Endress Hauser Flow meters, level sensors and H'BER unistat 600W temperature control system, Installed the T-VIT insulation for pipes and supervise the chemical cleaning, bore scope inspection, RiqoOavin test, Engaged with sub-contractors for panel installation, SCADA programming, Assisted with third party to prepare SAT/VAT documents and conducted SAT. Provided system operational training for client
Air Conditioning Engineering Technician at CTS Air Conditioning Engineering Pte LtdAir Conditioning Engineering Technician at CTS Air Conditioning Engineering Pte Ltd