Summary
Overview
Work History
Education
Skills
Projects
References
Timeline
W IQBAL HAIKAL BIN W AHAMAD AZRAN

W IQBAL HAIKAL BIN W AHAMAD AZRAN

EXECUTIVE MAINTENANCE & RELIABILITY ENGINEER
Malaysia

Summary

Maintenance and Reliability Engineer with 2 years of experience driving excellence in planning, troubleshooting and repair equipment and building maintenance to improve quality and efficiency.


Aiming to leverage experience and enhance technical skillsets specializing in mechanical and civil engineering. To explore and secure long term opportunity with a dynamic, collaborative, and challenging multinational organization.

Overview

2
2
years of professional experience
5
5
years of post-secondary education
2
2
Languages

Work History

Executive Maintenance and Reliability Engineer

AWORLDTEC ENGINEERING SDN BHD
12.2020 - Current
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Completed daily, weekly and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.
  • Worked frequently with mechanical and plumbing systems to complete knowledgeable inspections and skilled repairs.
  • Followed work orders and specifications for machine and equipment replacement, repair or maintenance.
  • Partnered with facility management to successfully complete projects within anticipated deadlines.
  • Adjusted machine settings to maximize performance and equipment longevity.
  • Completed partial or full dismantling of equipment to quickly repair or replace defective components and restore functionality.
  • Maintained restroom functionality by repairing leaking faucets, clogged toilets and other equipment.
  • Installed new locks, door handles and door closers.
  • Adhered to company safety and OSHA procedures to minimize accidents.
  • Used problem-solving skills to alleviate issues efficiently with minimal supervision.
  • Quickly responded to internal service calls regarding malfunctioning equipment and completed repairs.
  • Trained junior maintenance professionals on correct repair and cleaning procedures.
  • Provide technical expertise on all matters of engineering, assessment, and monitoring for all process equipment in Centralized Laboratory Services (CLS). (Including mechanical, electrical, and control/instrumentation equipment).
  • Lead maintenance work process for the equipment and building for the CLS.
  • Devised overall strategy on execution of routine maintenance of laboratory equipment, facilities and building to ensure that it is within PETRONAS Technical Standards (PTS) and local regulations.
  • Perform monitoring and report of building HVAC and troubleshooting ability to maintain and create quality air control solutions.
  • Responsible for ensuring equipment operating as operating standards, perform troubleshooting of breakdowns, perform preventive maintenance and calling for repairs.
  • Attentively involved in digitalized notification request of equipment breakdown.
  • Conduct and perform monitoring and maintenance of Fire Alarm Panel (FAP).
  • Responsible of ensuring equipment readiness and safety of building during shutdown of DB Solar Project and ensure that shutdown activities performed comply within HSE standard.
  • Ensure appropriate level of risk assessment and permit authority has been carried out for all employees and contractor by preparing and apply PTW, JHA, JMS and EIC Electrical Isolate Certificate.
  • Assure all work procedure comply with Occupational Safety & Health Act 1994 and Regulations, Environmental Quality Act 1974, Factory & Machinery Act 1967.
  • Rectified and enhance client ad-hoc request for utilities and tie-in (mechanical) equipment.
  • Well versed ISO 14000/45000 and ISO 17025 of international environmental management standards of Centralized Laboratory Settings.
  • Completed and distributed documentation and scope of work for declaration of equipment service, records tracker for monthly building and equipment issues, and prepared equipment master list for CLS.

Utilities Laboratory Technician

Ihsan Strategik Sdn Bhd
07.2020 - 11.2022
  • Participated in continuous improvement by generating suggestions, engaging in problem-solving activities to support teamwork.
  • Developed team communications and information for meetings.
  • Learned new skills and applied to daily tasks to improve efficiency and productivity.
  • Perform non routine and physical analysis of water and wastewater sample to ensure compliance with federal environmental compliance regulations.
  • Analyzed water samples with Ion Chromatography (IC), Atomic Absorption Spectroscopy (AAS), ICP Technology (Perkin Elmer), UV/VIS.
  • Perform routine SQC for all standard analytical instrument and ensure all equipment are well equipped and comply the standard Lab Equipment Calibration / Verification checklist.
  • Conforms to defined specifications by adhering to standard operating procedures and experimental guidelines.
  • Completed all regulatory and job training requirements successfully, including safety, breakdown maintenance, equipment maintenance, compliance, and specialised testing.
  • Create and implement processes for the creation, troubleshooting, maintenance, and training of existing and new laboratory procedures, equipment, instrumentation, and LIMS-based data management systems (Lab Vantage).

MAINTENANCE AND SERVICE ENGINEER TRAINEE

WIN HALL TECH SDN BHD, ALMA, BUKIT MERTAJAM PENANG
01.2020 - 06.2020
  • Involved in 2 big projects while entering the internship: o Vision Guided Dispensing System (VGD) o Lead frame and Weight bar Unloader (LBU)
  • Provide and conduct maintenance engineering services for machines for client (JCT plant)
  • Consult with clients to ascertain their objectives and make strategic suggestions and understand gather client requirements
  • Drawn few parts for the machines that have been ordered from China
  • Developed innovative and design for existing machinery and custom-made machines requested from JCY
  • PROJECTS:
  • Lead team member consist of maintenance lab and CMT (Centralized Maintenance Team) on the RCA (root cause analysis) project for the hvac fan blade broken issues at CLS building
  • Involved as team member in creation of the safety house rule in CLS
  • Managed 20 team members to successfully got BOMBA certificate on the fire & gas alarm system for the CLS building
  • Completion on getting ISO 14000/45000 and ISO 17025 for the CLS
  • Created, managed, and finalized invoice issued for the 14 once off po services on the non-contract equipment services at CLS
  • Involved on installation DB for the solar project at non-process area
  • Involved in project upgrading HVAC system and LEV ducting in CLS
  • Open
  • Completion on HVAC and LEV upgrading at CLS
  • Appointed as Physical Asset Management DEFP (Department Element Focal Person) for the self-audit My
  • Assurance OEMS and successfully completed the MSR report pack and presentation to the department team members
  • Lead the team on the project mapping the escape layout for the CLS building
  • Involved in EMOC upgrading project on the nitrogen gas installation at the CLS gas yard
  • One of the team members that lead the contractor to successfully get the LEV baseline report for the CLS building
  • Involved in the project team on the upgrading HVAC and LEV ducting in the LBB 801
  • Also have successfully conduct the team to achieve balance air flow on the hvac system in CLS building
  • Successfully lead team of 4 completing self-calibration for the 146-gas detector in CLS within 5 days
  • Completed renovation (Project IKEA) of the lubricant and GC room at CLS
  • Involved in 2 projects while internship: o Vision Guided Dispensing System (VGD) o Lead frame and Weight bar Unloader (LBU)

Education

BACHELOR’S IN MECHANICAL ENGINEERING IN AVIATION - MECHANICAL ENGINEERING IN AVIATION TECHNOLOGY

UNIKL Malaysia Institute Aviation Technology, SEPANG MALAYSIA
06.2016 - 06.2020

FOUNDATION IN SCIENCE AND TECHNOLOGY (ENGINEERING) - FOUNDATION ENGINEERING

KOLEJ MARA KULIM, KULIM MALAYSIA
05.2015 - 05.2016

Skills

P&ID Diagram SAPundefined

Projects

  • Involved in preventive maintenance of the ron engine by performing top overhaul.
  • Participated in the creation of the equipment maintenance contract phase 2 for the CLS.
  • Involved in project repair leaked pipe at the fire sprinkler system in CLS.
  • Lead the maintenance team on the creating operating procedure for the maintenance equipment maintenance work process.
  • Design the rooftop expansion joint and involved in managing vendor on the repair work progression.
  • Involved as team member and have been appoint as change owner for the Engineering Management Of Change (EMOC) on the Installation New breaker for the LECO equipment.
  • Troubleshoot the HACH COD reactor DR 200 and repair it by changing the thermal link parts for the fuse that blew due to a power surge. This resulted in a savings for the management budget.
  • Participated in the EMOC for the installation of the nitrogen pallet line at the CLS gas yard, as well as the work flow and operating procedures for the CLS gas usage.
  • Design and lead vendor to installed new steel cage barricade for the new electrical distribution board at CLS.
  • Lead team member consist of maintenance lab and CMT (Centralized Maintenance Team) on the RCA (root cause analysis) project for the hvac fan blade broken issues at Centralized Laboratory Services Pengerang (CLS) building.
  • Design and lead vendor for the installation of a new steel cage barricade for the water piping system entering the CLS building.
  • Involved as team member in creation of the safety house rule in CLS.
  • Managed 20 team members to successfully got BOMBA certificate on the fire & gas alarm system for the CLS building.
  • Completion on getting ISO 14000/45000 and ISO 17025 for the CLS.
  • Involved on installation new DB for the solar project at non-process area in Petronas Pengerang Integrated Complex.
  • Involved in upgrading HVAC system and LEV ducting in (CLS).
  • Lead the maintenance team in identifying the lack of volume control dampers (VCD) installed in the building and being involved in the installation of 160 VCD in CLS Pengerang.

References

M Hisham Ibrahim

hishamc@petronas.com.my

Head of Centralized Laboratory Services Petronas Integrated Complex

+60196565349


Che Rohaizi Bin Abdul Rashid

cherohaizi.rashid@petronas.com.my

Executive Laboratory Management (System)

+60199830954


Dhanjit Singh Dalliwal

dhanjitsingh.dalliwal@technipenergies.com

Field Engineer of Technip Geoproduction

+60193143599

Timeline

Executive Maintenance and Reliability Engineer - AWORLDTEC ENGINEERING SDN BHD
12.2020 - Current
Utilities Laboratory Technician - Ihsan Strategik Sdn Bhd
07.2020 - 11.2022
MAINTENANCE AND SERVICE ENGINEER TRAINEE - WIN HALL TECH SDN BHD, ALMA, BUKIT MERTAJAM PENANG
01.2020 - 06.2020
UNIKL Malaysia Institute Aviation Technology - BACHELOR’S IN MECHANICAL ENGINEERING IN AVIATION, MECHANICAL ENGINEERING IN AVIATION TECHNOLOGY
06.2016 - 06.2020
KOLEJ MARA KULIM - FOUNDATION IN SCIENCE AND TECHNOLOGY (ENGINEERING), FOUNDATION ENGINEERING
05.2015 - 05.2016
W IQBAL HAIKAL BIN W AHAMAD AZRAN EXECUTIVE MAINTENANCE & RELIABILITY ENGINEER