Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Vinoth Rajendran

Bedok

Summary

A Mechanical Engineer with over 12 years of experience in ACMV, BMS, and large-scale project management. Specialized in chilled water systems, VRV, and MV systems, focusing on cost optimization, safety enforcement, and regulatory compliance. Adept at delivering projects on time and within budget, implementing energy-efficient solutions, and ensuring smooth site operations.

Overview

11
11
years of professional experience

Work History

M&E Engineer

Enginius Engineering Pte. Ltd
10.2024 - Current
  • Managed chilled water system low-side design, installation, and commissioning in compliance with industry standards.
  • Led VRF system design and commissioning, ensuring high performance and energy efficiency.
  • Oversaw BMS integration for improved system automation and remote monitoring.
  • Coordinated with consultants and contractors to optimize project execution and reduce delays.
  • Conducted quality and safety inspections, ensuring adherence to regulations.


Manager - Projects

FourPoint Engineering
03.2020 - 09.2024
  • Chilled water system projects, ensuring seamless execution from design to commissioning.
  • Led VRF installations and performance optimization, improving overall system efficiency.
  • Managed BMS setup and commissioning, enhancing HVAC automation and control.
  • Ensured strict compliance with regulatory and safety standards in all projects.
  • Delivered multiple projects on time and within budget by optimizing workflows and vendor coordination.

Mechanical Engineer

Sanya General Contracting LLC
11.2018 - 11.2019
  • Managed the installation and commissioning of chilled water systems, ensuring quality and efficiency.
  • Implemented VRF system solutions, optimizing climate control and energy savings.
  • Led BMS coordination, integrating HVAC automation for better performance monitoring.
  • Ensured compliance with MEP design specifications and safety regulations.

Senior Engineer

N N Aircon Systems Pvt. Ltd.
05.2014 - 09.2018
  • Designed and executed chilled water piping and VRF projects, ensuring system reliability and efficiency.
  • Assisted in BMS integration, improving system control and automation capabilities.
  • Conducted load calculations and equipment selection to optimize ACMV performance.
  • Worked closely with subcontractors to meet project milestones efficiently.

Education

Bachelor of Engineering - Mechanical

K S Rangasamy College of Technology
Namakkal, TN
01.2014

Skills

    Chilled Water System – Low side design, installation, and commissioning
    VRF & MV System – Design, installation, and commissioning
    Building Management System (BMS) – Integration, troubleshooting, and automation
    Project Management – Budgeting, cost optimization, and quality control
    Site Coordination – Team leadership and subcontractor management
    Safety & Compliance – Adherence to industry regulations and workplace safety
    Technical Tools – AutoCAD, Mitsubishi VRF Multi Tool, HAP, McQuay Duct & Pipe Sizer

Languages

Tamil
English
Hindi
Telugu

Timeline

M&E Engineer

Enginius Engineering Pte. Ltd
10.2024 - Current

Manager - Projects

FourPoint Engineering
03.2020 - 09.2024

Mechanical Engineer

Sanya General Contracting LLC
11.2018 - 11.2019

Senior Engineer

N N Aircon Systems Pvt. Ltd.
05.2014 - 09.2018

Bachelor of Engineering - Mechanical

K S Rangasamy College of Technology
Vinoth Rajendran