C190 INTEGRATED TRAIN TESTING CENTRE PROJECT – GS ENGINEERING & CONSTRUCTION CORP., Managed architectural works including ALC panels, plastering, skim coat, and screeding., DE142 – Multi-Storey Gali Batu Bus Depot (2023 – 2025) – GAMUDA BERHARD, Managed architectural works including ALC panels, plastering, skim coat, and screeding., ENIA & Mandai Resort (2022 – 2025) - LUM CHANG BUILDING CONTRACTORS PTE LTD, Supply labour and tools to install alc panel, steel stiffener & lintel and wet trade works, AMAT@TIC, Tampines (2023 – 2024) – Boustead Engineering Pte Ltd, Coordinated finishing works: tiling, screeding, plastering, and ALC panels., AMK District Cooling Plant (C2251) (2023 – 2025) – Asia Projects Engineering Pte Ltd, Oversaw ceiling works, ALC panels, plastering, screeding, and tiling., Hai Sing Catholic School @ Pasir Ris (2023 – 2025) – Trust Build Engineering Pte Ltd, Architectural and finishing works coordination., Development at Neil Road – (Ongoing) – Shimizu Corporation Pte Ltd, ALC panels, plastering, screeding, and tiling works., PARKTOWN @ Tampines (Ongoing) – United Tec Construction Pte Ltd, ALC panels, plastering, screeding, and tiling works., J107-DESIGN AND CONSTRUCTION OF GEK POH STATION, TAWAS STATION AND VIADUCT FOR JURONG REGION LINE (LTA Projects) (Ongoing)-CES_SDC PTE. LTD., ALC panels, plastering Works only.