Collaborative leader with dedication to partnering with coworkers to promote engaged, empowering work culture. Documented strengths in building and maintaining relationships with diverse range of stakeholders in dynamic, fast-paced settings. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.
· Preparing Daily & Weekly Progress Reports & submit to Project Manager
· Preparing plan for all activities with available resource to meet the schedule & allocating manpower & equipment as per plan & Responsible for ensuring the job progresses as per schedule timely
· Monitoring piping progress and performance in coordination with other Discipline supervisors and assist in developing action plans, when required
· Coordinating the work of the mechanical, piping & Civil team to ensure smooth workflow
· Coordinate with sub-con crew to finish TIE-IN works and performing hydro test.
· Reviewing Field modified Piping Isometrics by inspecting it on the field & provide alternatives and providing necessary details for further engineering modification activities.
· Having experience in Shutdown activity
· Monitoring & Guiding subcontractors engineers in Spool Generation of Isometrics
· Responsible for conducting Daily Tool Box & providing safety awareness to the crew members.
· Assisting with the development and review of Project documentation, including drawings; reports; RA (Risk Assessment); WMS (Work method Statement).
· Performing all duties with regard to health and environmental safety
· Managing workers and solving their work related issues effectively
· Prepared& issued ready for construction Isometrics by using SMART PLANT SPOOLGEN & Auto CAD.
· Performed, coordinated & reviewed piping material take offs (MTO) from Isometrics and provided necessary details for further procurement activities
· Tracked & modified the revision drawing in CAD as per site condition in communication with Construction Engineer
· Kept track of Pipe Spools through various stages (RT, Painting) after Completion of fabrication before releasing the spools & supports for Erection.
· Ensured QA/QC procedures are followed strictly throughout entire project phase by Coordinating & getting approval from Client QA/QC Engineer after every activity.
· Reviewed piping work in progress on continuing basis and followed up of construction packages
· Monitored all piping fabrication& modification activities.
· Performed all duties with regard to health and environmental safety
· To Monitor the site work.
· To prepare Section and Different view drawing,
· To allocate the manpower for the working site for a smooth work flow.
· To keep record of all drawing with date of issue to Sub-con for construction.