Good skills and knowledge at Buck, Boost, inverting buck-boost, non-inverting buck-boost and Flyback topology.
Overview
15
15
years of professional experience
Work History
System and Application Engineer
Texas Instruments
05.2021 - Current
Job description
LV/MV BUBO technical support,device final release.
Definition for next gen LV BUBO
Reference design for BUBO
take away
Q1 2023 outstanding technical contribution award
small-signal modeling
Simplis modeling
Power Engineer
Hikvision
05.2016 - 03.2021
Jos description
As the head of the department's power supply solution, continuously optimizing power tree and power block for IP camera.
Evaluation for new DC-DC controller and converter,such as device from TI, MPS and Silergy. Generate brick power or user guider of new DC-DC for production team
Failure analysis and root cause found. EMC optimization.
Take away
learn about buck, boost, non-inverting buck-boost topology
Deep understanding about the structure of IP camera
Good work relationship with power device vendor
Application Engineer
Silergy
05.2014 - 05.2016
Job description
Work with design and test team to release device for LED lighting. including definition, road test and key customer support.
simulation and calculation for new IP.
FA support for CRU.
Take away
Learn about internal block of power management device.
Skills about simulation with LTspice and calculation with Mathcad.
learn deeper about triac dimmer.
Power Engineer for LED Lighting
Tospo
09.2009 - 04.2014
Job description
Work together with structure, heat and optical engineer to develop LED driver.
Conducted root cause analysis on system failures.
EMC issues analysis and improvement.
Take always from this job
Learn about the characteristics of LEDs, such as color rendering coefficient, photoelectric conversion efficiency, etc
Learn about the characteristics of SCR dimmers, such as inrush current and holding current characteristics
learn about basic knowledge about Flyback and inverting buck-boost topology,basic knowledge of magnetics and caps.