Collaborative leader partners with coworkers to promote engaged, empowering work culture. Documented strengths in building and maintaining relationships with diverse range of stakeholders in dynamic, fast-paced settings.
3 Years as Regional Director (Profit center) for a Multi-National Consultant in Infrastructure space with customer relationship building for Business Development & Revenue Generation as Key Performance areas.
11 Years' experience in Project delivery of Infrastructure Building M & E Services.
Prior 18 years' experience in Marketing & Business Development, Solution & Service sales, Project Sales & Product sales in the field of Industrial Energy Management, process cooling, Building Services, Industrial heat recovery & waste management solutions.
1) Feasibility studies, Concept design, Basic Engineering design, Detail engineering design of Building Services, all Mechanical services for pharmaceutical project clients. Mechanical services include all Building Services (HVAC, Fire Protection,
Plumbing and Sanitary, Mechanical Piping for Compressed Air and Utility steam and condensate systems.
2) Green Field and Brown field expansion (bump out) projects.
3) Work area: Preparation of Bid documents IFA, IFB, IFC stages, hosting Contractor weekly meeting on behalf Of Clients, Review of contractor shop drawings and material submission documents. Review of testing and commissioning protocols. Support Client during testing and commissioning if necessary.
CAPITASPRING BUILDING PROJECT IN RAFLES PLACE
SCOPE: ACMV, ELECTRICAL, ELV, BMS
Managed team of 26 Key staff and 45 direct work men and 10 sub-contractors
GUCCO TOWER project
Complete Electrical Works for 5 levels of podium Car park, Retail connected to Tanjong Pagar MRT, 6th Storey to 39 Storey Offices, and Basement 1 to 3 Car parK and Urban Park at Level 1
Samsung C & T was the Main Contractor of the Building.
Detail Engineering Phase:
Design development, Engineering Co-ordination, submission and approval of design drawings, Material & Sample submissions, Method statements of all Electrical Low Voltage systems for Changi Airport Terminal 4.
Construction Phase:
Supervising and completion of all M&E Works for the following Buildings.
1) Air Traffic Control Tower near Changi Airport Terminal 4
2) Bus and Taxi transfer holding area
3) South end reservoir - Main Communication Equipment Room
4) U/G Fuel Oil tanks for Diesel generators near Terminal Building and ATCC
Complete Construction Supervision for Zone 2 buildings allotted to me consisted of:
(a) Office of Singapore Sports Council
(b) Retail including Leisure Water Centre at its Roof – THE KALLANG WAVE MALL
(c) Water Sports Centre
(d) Museum
(e) Library.
Technical evaluation, procurement and supply of major Electrical equipment and cables was in the team's works scope
a) All power distribution panels. (DBs)
b) Power and earth Cables including u/g cables
c) LT panels (MSB
d) Standby generators
e) Light and light fittings
Construction Management for all mechanical services in the typical floors of the Hospital Building. (Total Project area of Hospital building: 85,000 m2)
Completed installation and testing of all mechanical services for 2000 room areas in a record time of 6 months before handing over to Main Contractor for False ceiling closure.
Team Size: Directly led a team of 8 Sr. Engineers, 12 Supervisors / 24 Foremen and 700 workmen.
Construction of a Utility service Tunnel (Link Chamber) to carry trunk Chilled water piping 1200 -1400 mm diameter (Supply + Return) of Total length approximately 2 Km and Common bracket Systems for installation of 22KV Power Cables at Building.
Level Basement 2 to Basement 5 at Marina Bay Sands Integrated Resort development site in Singapore.
Besides the tunnel has trunk piping serving Domestic Water and NE Water from Primary intake point supplied by PUB (Public Utilities Board) for further distribution to hotel and other areas of entertainment.
Team Size: 6 Engineers, 2 Supervisors; Safety Officer; Planning Engineer and Document Controller, 1 Draftsman, 1 Welding Engineer Peak Workmen Strength: 150,
ASEAN Regional Sales Manager for Energy Business solutions
In Singapore completed Energy audit work for F&N Beverages factory at Pandan loop. and proposed a performance saving of S$ 450K per annum with an investment of S$ 2.4 Million for retrofitting old energy consuming equipment with a payback of 4.5 years.
a) Project Manager - Nanjing Project – China.
Tenure : 1st Jul 2002 till 5th Jun 2003
Project Management Consultancy of ACMV and Electrical Works in for
Grand Ocean Shopping Mall. The total area of shopping mall is 75,000
m² spread over 8 levels including basement and the ACMV & Electrical
works was completed in a record time of 6 months
b) Project Marketing and estimation Manager for tendering MEP projects
Hong Kong and Macau
Tenure: 5th May 2005 to 28th Feb 2007
c) Tendering ACMV projects in MENA region from Mumbai Office
Tenure : Jul 2004 to Apr 2005
Target Booking achieved : INR 360 Million in 2 years
Target achieved : INR 50 Million
Target achieved : Booked more than 13 projects with average margin of 20%
a) Workshop and tool room
b) Stores
c) Materials department
Performance Evaluation
Y1754755
Sxxxx538A