Summary
Overview
Work History
Education
Skills
Languages
Pass Type
Passport No
Personal Information
Additional Information
Timeline
Generic

SIVAGURUNATHAN G

Summary

Mechanical Engineer having 12+ years 11Month working experience in Semiconductor, power and process plant piping design projects. Proven in organizing, monitoring, controlling and improving the design works to obtain high quality outputs and made significant incremental changes in the design house. Study and understanding of Project requirements, P&ID's, process description and design philosophies. Preparation of piping general arrangement drawing. Preparation of piping isometric drawing as per the P&ID and piping Layout. Preparation of piping detailing drawing. Preparation of pipe support drawings.

Overview

13
13
years of professional experience

Work History

Sr.Designer/Coordinator

Exyte Singapore Pte. Ltd.
02.2022 - Current

Project Name: Micron_BOISE .U.S (WASTE WATER TREATMENT PLANT)

Role& Responsibilities :

· Study and understanding of Project requirements, process description and design philosophies.

· Preparation of Block flow Diagram WWT Area as per Client Requirement

· Preparation of Process Flow Diagram WWT Area based on Block Flow Diagram

· Preparation of Equipment Layout

· Preparation of Equipment move in Layout Drawing

· Preparation of Piping 3D Model in Revit-2022 3D Software.

· Preparation of Space Management Drawing for pipe rack and interconnection piping list

· Preparation of Clash Report in Navis Manager Software

· Condition to other Discipline and Vendor.

· Preparation of piping general arrangement drawing

· Involve to final 3D model Review meeting in client meeting

Extract Bill of Material Report as per final 3D model

Project Name: Micron FAB 10A

Role& Responsibilities :

· Study and understanding of Project requirements, VMP, process description and design philosophies.

· Preparation of Equipment 3D model As Per Vendor GA Drawing.

· Preparation of Piping 3D Model in Plant 3D Software.

· Extract the Isometric Drawing in Plant 3D Software.

· Preparation of pop-out Detail drawing

· Preparation of piping general arrangement drawing

· Clash check with 3D-Model in Navis Manager Software

· Involve to final 3D model Review meeting in client meeting

· Extract Bill of Material Report as per final 3D model

Senior Engineer

QuEST Global Engineering Services Private Limited
Bangalore,India
01.2020 - 02.2022

Onsite Client Name : SUEZ Water Technologies & Solutions

Project Details:

Project 1:

Project: TATA Steel Limited (JAMSHEDPUR)

Client: SUEZ Water Technologies & Solutions

Role& Responsibilities :

· Study and understanding of Project requirements, PID, process description and design philosophies.

· Preparation of Equipment 3D model As Per Vendor GA Drawing.

· Preparation of Civil 3D model based on Equipment Layout in Plant 3D software.

· Preparation of Piping 3D Model in Plant 3D Software.

· Extract the Isometric Drawing in Plant 3D Software.

· Preparation of piping general arrangement drawing

· Preparation of wall cutout Detail Drawing.

· Preparation of Pump Foundation Detail Drawing.

· Nozzle orientation Mark up Given to Equipment Vendor.

· Clash check with 3D-Model in Navis Manager Software

· Involve to Regional Team Review meeting.

· Involve to Client Review meeting for TSL.

Project 2: SCANDEX TEXTILE INDUSTRIES 7.2 MLD MBR BASED EFFUENT TREATMENT PLANT BANGLADESH.

Client: SUEZ Water Technologies & Solutions

Role& Responsibilities :

· Study and understanding of Project requirements, PID, process description and design philosophies.

· Preparation of Equipment 3D model As Per Vendor GA Drawing.

· Preparation of Civil 3D model based on Equipment Layout in Plant 3D software.

· Preparation of Piping 3D Model in Plant 3D Software.

· Extract the Isometric Drawing in Plant 3D Software.

· Preparation of piping general arrangement drawing

· Preparation of wall cutout Detail Drawing.

· Preparation of Pump Foundation Detail Drawing.

· Nozzle orientation Mark up Given to Equipment Vendor.

· Clash check with 3D-Model in Navis Manager Software

· Involve to Regional Team Review meeting.

· Coordinate with Electrical and E&I Team

· Preparation of Bill of Material

Project 3:

Project: SHARAF WASHING AND DYEING INDUSTRIES 7.2 MLD MBR BASED

EFFUENT TREATMENT PLANT, BANGLADESH.

Client: SUEZ Water Technologies & Solutions

Role& Responsibilities :

· Study and understanding of Project requirements, PID, process description and design philosophies.

· Preparation of Equipment 3D model As Per Vendor GA Drawing.

· Preparation of Civil 3D model based on Equipment Layout in Plant 3D software.

· Preparation of Piping 3D Model in Plant 3D Software.

· Extract the Isometric Drawing in Plant 3D Software.

· Preparation of piping general arrangement drawing

· Preparation of wall cutout Detail Drawing.

· Preparation of Pump Foundation Detail Drawing.

· Nozzle orientation Mark up Given to Equipment Vendor.

· Clash check with 3D-Model in Navis Manager Software

· Involve to Regional Team Review meeting.

· Coordinate with Electrical and E&I Team

· Preparation of Bill of Material.

Project 4:

Project: NZ-DENIM LIMITED.7.2 MLD MBR DENIM DYEING TEXTILE

EFFUENT TREATMENT PLANT.

Client: SUEZ Water Technologies & Solutions

Role& Responsibilities :

· Study and understanding of Project requirements, PID, process description and design philosophies.

· Preparation of Equipment 3D model As Per Vendor GA Drawing.

· Preparation of Civil 3D model based on Equipment Layout in Revit 3D-software.

· Preparation of Piping 3D Model in Revit 3D-software

· Clash check with 3D-Model in Navis Manager Software

· Involve to Regional Team Review meeting.

· Preparation of Bill of Material

Module Lead

Creative Synergies Group
Bangalore, India
12.2014 - 12.2019

Project 1:

Project: LEUNA 2020+ (TOTAL)

Client: MMEC MANNESMANN

Role& Responsibilities :

· Study and understanding of Project requirements, P&ID's, process description and design philosophies.

· Preparation of Piping Layout in Aveva E3D SOFTWARE

· Preparation of Equipment 3D model

· Preparation of piping general arrangement drawing

· Preparation of piping Support Detail Drawing.

Project 2:

Project: BASRAH UPGRADING FCC PROJECT

FEED SERVICE (HYDRO TREATING UNIT)

Client: JGC Corporation

Role& Responsibilities :

· Study and understanding of Project requirements, P&ID's, process description and design philosophies.

· Preparation of Piping Layout in PDMS SOFTWARE

· Preparation of Equipment 3D model

· Preparation of piping general arrangement drawing

· Extract Bulk MTO Report

Project 3:

Project : HHS GRACE

Client: KURITA WATER INDUSTRIES LTD.

Role& Responsibilities :

· Study and understanding of Project requirements, P&ID's, process description and design philosophies.

· Preparation of 3d model Equipment as per data sheet in plant 3D soft ware .

· Preparation of 3d model of Front piping rout as per GA Drawing.

· Preparation of around Piping Connectivity

· Preparation of general Arrangement Drawing.

· Involve to client Review meet.

· Extract Bulk MTO Report.

Project 4:

Project : HICKORY RUN

Client: CMI Energy-U.S.A

Role& Responsibilities :

· Preparation of Piping 3D Model in CadWork's Software.

· Preparation of isometrics drawing based on client standard

· Preparation of support detail drawing based on client standard

· Preparation cumulative of Bill of materials based on the drawing.

Project 5: LNG PUMP & TRUCK LOADING SKID

Client: OKRA ENERGY-U.S.A

Role& Responsibilities :

· Preparation of 3D Skid Model in Auto plant3D

· Preparation of Equipment model

· Preparation of Skid layout drawings,

· Preparation of Isometrics Drawing.,

· Preparation of support detail drawing

· Preparation cumulative of Bill of materials based on the drawing.

· Preparation of general Arrangement Drawing.

Project 6:

Project : FORT ST JAMES GREEN ENEGRY (40 MWe BIOMASS FIRED POWER PLANT)

Client: FSE Energy, U.S.A

Role & Responsibilities:

· Study and understanding of Project requirements, P&ID's, process description and design philosophies.

· Preparation of Piping Layout in AUTO PLANT 3D

· Preparation of Isometric Drawing

· Preparation of piping general arrangement drawing

· Preparation of piping support detail drawing.

· Preparation cumulative of Bill of materials based on the drawing.

Project 7:

Project: LOUISIANA ENERGY & POWER AUTHORITY.

Client: Victory Energy, U.S.A.

Project Description:

Heat Recovery steam generator power plant Project for achieving piping design in IBR & non IBR pipe lines as per ASME in 31.1 STD, 31.3 STD. Developed piping general arrangement drawing and Isometric, detail drawings and structural TIE IN support detail drawings.

Role & Responsibilities:

· Study and understanding of Project requirements, P&ID's, process description and design philosophies.

· Preparation of piping general arrangement drawing as per Piping and instrumentation diagram.

· Preparation of pipe sizing and pipe thickness calculation based on the ASME31.1, ASM31.3.

· Review and approval of Isometric drawings.

· Review and approval of piping detail drawing.

· Review and approval of piping support detail drawing.

· Review and approval of Bill of materials based on the drawing.

Project 8:

Project: YANNUZZI.

Client: Victory Energy, U.S.A.

Project Description:

Power plant Project for achieving piping design in IBR & non IBR pipe lines as per ASME in 31.1 STD, 31.3 STD. Developed piping general arrangement drawing and Isometric, detail drawings.

Role & Responsibilities:

· Preparation of piping general arrangement drawing.

· Review and approval of Isometric drawings.

· Review and approval of piping detail drawing.

· Review and approval of Bill of materials based on the drawing.

Piping Design Engineer

HIQ Power Associates Pvt. Ltd.
Chennai,india
03.2013 - 03.2014

Project 1:

Project: RAMGARH COMBINED CYCLE STAGE-IV, Rajasthan (2x25 MW Power Plants)

Client: Tecpro System Ltd.

Project 2:

Project: M/S.ULTRA CEMENT LIMITED, RAWAN (1x30 MW Power Plant)

Client: Tecpro System Ltd.

Project Description:

Power plant Project for achieving piping design in IBR & non IBR pipe lines as per ASME in 31.1 STD, 31.3 STD. Developed piping general arrangement drawing and Isometric, detail drawings and structural support detail drawings.

Role & Responsibilities:

· Study and understanding of Project requirements, P&ID's, process description and design philosophies.

· Involved in various detailed engineering activities includes preparation of Mechanical datasheet, Technical specification, Material Requisitions, Purchase requisitions etc.,

· Involved in vendor documents review and generating technical queries.

· Conversion of piping layout drawings in to piping Isometric drawings.

· Checking of Isometric drawings.

· Preparation of Piping support arrangement drawings

· Preparation of Detail drawing

· Bill of Material generation based on drawing.

· Knowledge in ASME31.1, ASME 31.3 Standards.

· Piping drafting Autocad-2014.

Piping Design Engineer

Vale Project Service
Chennai,India
07.2011 - 02.2013

Project 1:

Project: M/S, Arab paper manufacturing, Co-Saudi (3x16MW power plant)

Client: IJT in Chennai.

Project 2:

Project: M/S.MSR.Mega Bio-power plant, Hyderabad (1x8MW power plant)

Client: Vale project service. In Chennai.

Project 3:

Project: M /S, Madras Cements.Ltd. Ariyalur. Tamilnadu. ( 1x20MW power plant)

Client: Thermax Limited in Chennai.

Role & Responsibilities:

· Conversion of piping layout drawings in to piping Isometric drawings.

· Checking of Isometric drawings.

· Preparation of Detail drawing.

· Bill of Material generation based on drawing.

· Knowledge in ASME31.1, ASME 31.3.

· Piping drafting- Autocad-2010.

Education

Skills

Auto CAD-2019, Autodesk plant 3D-2019,Revit-2022, Bentley Auto Plant-2018, PDMS-120 SP625, Aveva E3D-210,CadWork’s Windows XP, Windows 7, Ms Office 2012

Languages

English
Tamil

Pass Type

S-Pass

Passport No

V4085477

Personal Information

  • Father's Name: S.Gunasekaran
  • Date of Birth: 03/20/1989
  • Gender: Male
  • Marital Status: Married

Additional Information

Father's Name : S.Gunasekaran

Sex : Male

Date of Birth : 20-03-1989

Marital Status : Married

Languages Known : English, Tamil

Passport no : V4085477

Timeline

Sr.Designer/Coordinator

Exyte Singapore Pte. Ltd.
02.2022 - Current

Senior Engineer

QuEST Global Engineering Services Private Limited
01.2020 - 02.2022

Module Lead

Creative Synergies Group
12.2014 - 12.2019

Piping Design Engineer

HIQ Power Associates Pvt. Ltd.
03.2013 - 03.2014

Piping Design Engineer

Vale Project Service
07.2011 - 02.2013

SIVAGURUNATHAN G