
Mechanical Engineer having 12+ years 11Month working experience in Semiconductor, power and process plant piping design projects. Proven in organizing, monitoring, controlling and improving the design works to obtain high quality outputs and made significant incremental changes in the design house. Study and understanding of Project requirements, P&ID's, process description and design philosophies. Preparation of piping general arrangement drawing. Preparation of piping isometric drawing as per the P&ID and piping Layout. Preparation of piping detailing drawing. Preparation of pipe support drawings.
Project Name: Micron_BOISE .U.S (WASTE WATER TREATMENT PLANT)
Role& Responsibilities :
· Study and understanding of Project requirements, process description and design philosophies.
· Preparation of Block flow Diagram WWT Area as per Client Requirement
· Preparation of Process Flow Diagram WWT Area based on Block Flow Diagram
· Preparation of Equipment Layout
· Preparation of Equipment move in Layout Drawing
· Preparation of Piping 3D Model in Revit-2022 3D Software.
· Preparation of Space Management Drawing for pipe rack and interconnection piping list
· Preparation of Clash Report in Navis Manager Software
· Condition to other Discipline and Vendor.
· Preparation of piping general arrangement drawing
· Involve to final 3D model Review meeting in client meeting
Extract Bill of Material Report as per final 3D model
Project Name: Micron FAB 10A
Role& Responsibilities :
· Study and understanding of Project requirements, VMP, process description and design philosophies.
· Preparation of Equipment 3D model As Per Vendor GA Drawing.
· Preparation of Piping 3D Model in Plant 3D Software.
· Extract the Isometric Drawing in Plant 3D Software.
· Preparation of pop-out Detail drawing
· Preparation of piping general arrangement drawing
· Clash check with 3D-Model in Navis Manager Software
· Involve to final 3D model Review meeting in client meeting
· Extract Bill of Material Report as per final 3D model
Onsite Client Name : SUEZ Water Technologies & Solutions
Project Details:
Project 1:
Project: TATA Steel Limited (JAMSHEDPUR)
Client: SUEZ Water Technologies & Solutions
Role& Responsibilities :
· Study and understanding of Project requirements, PID, process description and design philosophies.
· Preparation of Equipment 3D model As Per Vendor GA Drawing.
· Preparation of Civil 3D model based on Equipment Layout in Plant 3D software.
· Preparation of Piping 3D Model in Plant 3D Software.
· Extract the Isometric Drawing in Plant 3D Software.
· Preparation of piping general arrangement drawing
· Preparation of wall cutout Detail Drawing.
· Preparation of Pump Foundation Detail Drawing.
· Nozzle orientation Mark up Given to Equipment Vendor.
· Clash check with 3D-Model in Navis Manager Software
· Involve to Regional Team Review meeting.
· Involve to Client Review meeting for TSL.
Project 2: SCANDEX TEXTILE INDUSTRIES 7.2 MLD MBR BASED EFFUENT TREATMENT PLANT BANGLADESH.
Client: SUEZ Water Technologies & Solutions
Role& Responsibilities :
· Study and understanding of Project requirements, PID, process description and design philosophies.
· Preparation of Equipment 3D model As Per Vendor GA Drawing.
· Preparation of Civil 3D model based on Equipment Layout in Plant 3D software.
· Preparation of Piping 3D Model in Plant 3D Software.
· Extract the Isometric Drawing in Plant 3D Software.
· Preparation of piping general arrangement drawing
· Preparation of wall cutout Detail Drawing.
· Preparation of Pump Foundation Detail Drawing.
· Nozzle orientation Mark up Given to Equipment Vendor.
· Clash check with 3D-Model in Navis Manager Software
· Involve to Regional Team Review meeting.
· Coordinate with Electrical and E&I Team
· Preparation of Bill of Material
Project 3:
Project: SHARAF WASHING AND DYEING INDUSTRIES 7.2 MLD MBR BASED
EFFUENT TREATMENT PLANT, BANGLADESH.
Client: SUEZ Water Technologies & Solutions
Role& Responsibilities :
· Study and understanding of Project requirements, PID, process description and design philosophies.
· Preparation of Equipment 3D model As Per Vendor GA Drawing.
· Preparation of Civil 3D model based on Equipment Layout in Plant 3D software.
· Preparation of Piping 3D Model in Plant 3D Software.
· Extract the Isometric Drawing in Plant 3D Software.
· Preparation of piping general arrangement drawing
· Preparation of wall cutout Detail Drawing.
· Preparation of Pump Foundation Detail Drawing.
· Nozzle orientation Mark up Given to Equipment Vendor.
· Clash check with 3D-Model in Navis Manager Software
· Involve to Regional Team Review meeting.
· Coordinate with Electrical and E&I Team
· Preparation of Bill of Material.
Project 4:
Project: NZ-DENIM LIMITED.7.2 MLD MBR DENIM DYEING TEXTILE
EFFUENT TREATMENT PLANT.
Client: SUEZ Water Technologies & Solutions
Role& Responsibilities :
· Study and understanding of Project requirements, PID, process description and design philosophies.
· Preparation of Equipment 3D model As Per Vendor GA Drawing.
· Preparation of Civil 3D model based on Equipment Layout in Revit 3D-software.
· Preparation of Piping 3D Model in Revit 3D-software
· Clash check with 3D-Model in Navis Manager Software
· Involve to Regional Team Review meeting.
· Preparation of Bill of Material
Project 1:
Project: LEUNA 2020+ (TOTAL)
Client: MMEC MANNESMANN
Role& Responsibilities :
· Study and understanding of Project requirements, P&ID's, process description and design philosophies.
· Preparation of Piping Layout in Aveva E3D SOFTWARE
· Preparation of Equipment 3D model
· Preparation of piping general arrangement drawing
· Preparation of piping Support Detail Drawing.
Project 2:
Project: BASRAH UPGRADING FCC PROJECT
FEED SERVICE (HYDRO TREATING UNIT)
Client: JGC Corporation
Role& Responsibilities :
· Study and understanding of Project requirements, P&ID's, process description and design philosophies.
· Preparation of Piping Layout in PDMS SOFTWARE
· Preparation of Equipment 3D model
· Preparation of piping general arrangement drawing
· Extract Bulk MTO Report
Project 3:
Project : HHS GRACE
Client: KURITA WATER INDUSTRIES LTD.
Role& Responsibilities :
· Study and understanding of Project requirements, P&ID's, process description and design philosophies.
· Preparation of 3d model Equipment as per data sheet in plant 3D soft ware .
· Preparation of 3d model of Front piping rout as per GA Drawing.
· Preparation of around Piping Connectivity
· Preparation of general Arrangement Drawing.
· Involve to client Review meet.
· Extract Bulk MTO Report.
Project 4:
Project : HICKORY RUN
Client: CMI Energy-U.S.A
Role& Responsibilities :
· Preparation of Piping 3D Model in CadWork's Software.
· Preparation of isometrics drawing based on client standard
· Preparation of support detail drawing based on client standard
· Preparation cumulative of Bill of materials based on the drawing.
Project 5: LNG PUMP & TRUCK LOADING SKID
Client: OKRA ENERGY-U.S.A
Role& Responsibilities :
· Preparation of 3D Skid Model in Auto plant3D
· Preparation of Equipment model
· Preparation of Skid layout drawings,
· Preparation of Isometrics Drawing.,
· Preparation of support detail drawing
· Preparation cumulative of Bill of materials based on the drawing.
· Preparation of general Arrangement Drawing.
Project 6:
Project : FORT ST JAMES GREEN ENEGRY (40 MWe BIOMASS FIRED POWER PLANT)
Client: FSE Energy, U.S.A
Role & Responsibilities:
· Study and understanding of Project requirements, P&ID's, process description and design philosophies.
· Preparation of Piping Layout in AUTO PLANT 3D
· Preparation of Isometric Drawing
· Preparation of piping general arrangement drawing
· Preparation of piping support detail drawing.
· Preparation cumulative of Bill of materials based on the drawing.
Project 7:
Project: LOUISIANA ENERGY & POWER AUTHORITY.
Client: Victory Energy, U.S.A.
Project Description:
Heat Recovery steam generator power plant Project for achieving piping design in IBR & non IBR pipe lines as per ASME in 31.1 STD, 31.3 STD. Developed piping general arrangement drawing and Isometric, detail drawings and structural TIE IN support detail drawings.
Role & Responsibilities:
· Study and understanding of Project requirements, P&ID's, process description and design philosophies.
· Preparation of piping general arrangement drawing as per Piping and instrumentation diagram.
· Preparation of pipe sizing and pipe thickness calculation based on the ASME31.1, ASM31.3.
· Review and approval of Isometric drawings.
· Review and approval of piping detail drawing.
· Review and approval of piping support detail drawing.
· Review and approval of Bill of materials based on the drawing.
Project 8:
Project: YANNUZZI.
Client: Victory Energy, U.S.A.
Project Description:
Power plant Project for achieving piping design in IBR & non IBR pipe lines as per ASME in 31.1 STD, 31.3 STD. Developed piping general arrangement drawing and Isometric, detail drawings.
Role & Responsibilities:
· Preparation of piping general arrangement drawing.
· Review and approval of Isometric drawings.
· Review and approval of piping detail drawing.
· Review and approval of Bill of materials based on the drawing.
Project 1:
Project: RAMGARH COMBINED CYCLE STAGE-IV, Rajasthan (2x25 MW Power Plants)
Client: Tecpro System Ltd.
Project 2:
Project: M/S.ULTRA CEMENT LIMITED, RAWAN (1x30 MW Power Plant)
Client: Tecpro System Ltd.
Project Description:
Power plant Project for achieving piping design in IBR & non IBR pipe lines as per ASME in 31.1 STD, 31.3 STD. Developed piping general arrangement drawing and Isometric, detail drawings and structural support detail drawings.
Role & Responsibilities:
· Study and understanding of Project requirements, P&ID's, process description and design philosophies.
· Involved in various detailed engineering activities includes preparation of Mechanical datasheet, Technical specification, Material Requisitions, Purchase requisitions etc.,
· Involved in vendor documents review and generating technical queries.
· Conversion of piping layout drawings in to piping Isometric drawings.
· Checking of Isometric drawings.
· Preparation of Piping support arrangement drawings
· Preparation of Detail drawing
· Bill of Material generation based on drawing.
· Knowledge in ASME31.1, ASME 31.3 Standards.
· Piping drafting Autocad-2014.
Project 1:
Project: M/S, Arab paper manufacturing, Co-Saudi (3x16MW power plant)
Client: IJT in Chennai.
Project 2:
Project: M/S.MSR.Mega Bio-power plant, Hyderabad (1x8MW power plant)
Client: Vale project service. In Chennai.
Project 3:
Project: M /S, Madras Cements.Ltd. Ariyalur. Tamilnadu. ( 1x20MW power plant)
Client: Thermax Limited in Chennai.
Role & Responsibilities:
· Conversion of piping layout drawings in to piping Isometric drawings.
· Checking of Isometric drawings.
· Preparation of Detail drawing.
· Bill of Material generation based on drawing.
· Knowledge in ASME31.1, ASME 31.3.
· Piping drafting- Autocad-2010.
Auto CAD-2019, Autodesk plant 3D-2019,Revit-2022, Bentley Auto Plant-2018, PDMS-120 SP625, Aveva E3D-210,CadWork’s Windows XP, Windows 7, Ms Office 2012
Father's Name : S.Gunasekaran
Sex : Male
Date of Birth : 20-03-1989
Marital Status : Married
Languages Known : English, Tamil
Passport no : V4085477