Summary
Overview
Work History
Education
Skills
Additional Information
Languages known
Disclaimer
Timeline
Generic

Sivabalan

Peravurani

Summary

Diligent M&E Engineer with strong background in Mechanical and electrical systems. Successfully managed complex projects and ensured seamless operation of critical equipment. Demonstrated expertise in troubleshooting and repair, alongside effective use of teamwork and problem-solving skills.

Overview

10
10
years of professional experience

Work History

Senior Electrical Technician

LARSEN & TOUBRO ANNA NAGAR, CHENNAI
01.2023 - Current
  • Execution: Erection and commissioning of Ring Main Unit(RMU)
  • Supervised electrical installation and maintenance projects, ensuring compliance with safety standards and regulations.
  • Led troubleshooting efforts for complex electrical systems, enhancing operational efficiency and reducing downtime.
  • Execute underground and aboveground piping works such as Fire Water Line, Foam Line system, cooling water, Gas Pipeline, Industrial water, Potable Water line
  • Execute the Sanitary and Plumbing works at buildings
  • Execute the HVAC works in the buildings
  • Trained and mentored junior technicians on best practices in electrical diagnostics and repair methodologies.
  • Collaborated with engineering teams to implement system upgrades, optimizing performance of electrical infrastructure.
  • Developed preventive maintenance schedules, significantly improving equipment reliability and availability rates.
  • Conducted root cause analysis on recurring issues, driving strategic improvements in operational processes and solutions.

M&E Engineer

Rotary Engineering
10.2021 - 12.2022
  • Designed and implemented M&E systems for construction projects, ensuring compliance with industry standards.
  • Coordinate and supervise Underground and Above ground piping works
  • Conducted thorough inspections and assessments of mechanical and electrical systems to guarantee operational efficiency.
  • Collaborated with cross-functional teams to troubleshoot issues, enhancing project timelines and reducing downtime.
  • Analyzed project requirements and specifications to develop effective engineering solutions that met client expectations.

Electrical Technician

COLLIERS INTERNATIONAL GROUP, CHENNAI
06.2017 - 12.2020
  • Execution: To mobilize, erect and commissioning the switchgear panels at the switchgear room.
  • Installed electrical conduit and wiring for power, controls, and lighting.
  • Tested wiring and other system parts for electrical flow and function.
  • Tested, troubleshot, and calibrated equipment in shop and field.
  • Installed electrical wiring through conduits and holes in both flooring and walls.
  • Maintained detailed records of all repairs, maintenance tasks, and inventory for accurate tracking purposes.
  • Inspected equipment for defects and safety hazards and completed necessary repairs.

Electrical Technician

CHENNAI PETROLEUM CORPORATION LIMITED, CHENNAI
08.2015 - 08.2017
  • Execution: To do glanding and termination works at DB’s, switchgear panels, testing works at various CT’s, VT’s and transformers.


Education

Bachelor of Engineering (B.E) - Electronics and Communication Engineering

SAACE, Anna University
01.2015

Higher Secondary (12th) - undefined

Laurel higher secondary school
01.2011

Secondary School (10th) - undefined

Dr.J.C.Kumarappa Matric Higher secondary School
01.2009

Skills

  • Execute the Testing and Commissioning Works for both Mechanical, Electrical works and HVAC works
  • Field service support
  • Electrical code compliance
  • Electrical troubleshooting
  • Customer relations

Additional Information

• Efficient operation and maintenance of all electrical equipment in the plant for zero electrical downtime and maximum productivity

• Involved in shutdown activities of various units in oil and gas

• To do site planning, inspections and coordination with consultants, subcontractors & clients on M&E requirements and specifications

• Prepare and create detail work schedule, manpower and resource planning

• Coordinate for submission documents and approval, review of shop drawings, Architectural drawings which is related to M&E works

• Coordinate the safety management system on site

• Conduct the QC briefings for various discipline subcontractors.

• Follow up and reporting on the project progress

• Plan, monitor and ensure work-in-progress at site are on schedule

• Prepare and compile as built drawings for submission

• Identify discrepancies, assess, and recommend M&E Subcontractors' claims

• Preparation of document (Cable schedule, Termination details, Work method statements, Risk assessment, Material tracker, Progress tracker)

• Project execution, technical support, coordination with design team, sales proposal & tender support, preparation of project specifications, technical clarification of electrical and ELV system, HVAC system and Piping system

• Initiate and get involved in project meetings, site progress meeting and internal department meetings with regards to project related matters, department operations.

• Executing cost saving and energy saving techniques.

• Guide construction team to handle and deliver project effectively and efficiently

• Provide technical assistance to project team, fabrication team and commissioning team.

• Closely coordinate with inter departments to smooth process and project flow.

• Work closely with QA/QC department to maintain and achieve company goals.

• To execute the plant main grid earthing.

• Erection, Commissioning and maintenance of HT/LT switchgears of VCBs, ACBs and MCCBs feeders of MCCs, AC UPS and DC systems (Handled SIEMENS, SCHNEIDER switchboards)

• Conducting FAT and SAT testing for electrical & ELV systems.

• Execution of the Electrical, ELV system, HVAC System, U/G Piping- FW line, Cooling water Line, Potable Water Line, Plumbing and Sanitary system, Sewer and Drainage system

• To check with isometric diagrams while installation and prepare for pressure test, wrapping for UG piping's, Wrapping, holiday testing works

• To check the coordination and install the Post indicator valves

• Ensuring for safe working conditions

• Experienced to maintain good communication and coordination with client and subcontractors.

Languages known

English & Tamil

Disclaimer

I hereby declare that the above particulars are correct and true to the best of my knowledge.

Timeline

Senior Electrical Technician

LARSEN & TOUBRO ANNA NAGAR, CHENNAI
01.2023 - Current

M&E Engineer

Rotary Engineering
10.2021 - 12.2022

Electrical Technician

COLLIERS INTERNATIONAL GROUP, CHENNAI
06.2017 - 12.2020

Electrical Technician

CHENNAI PETROLEUM CORPORATION LIMITED, CHENNAI
08.2015 - 08.2017

Higher Secondary (12th) - undefined

Laurel higher secondary school

Secondary School (10th) - undefined

Dr.J.C.Kumarappa Matric Higher secondary School

Bachelor of Engineering (B.E) - Electronics and Communication Engineering

SAACE, Anna University
Sivabalan