Summary
Overview
Work History
Education
Skills
Personal Information
Timeline
Generic
SIVA SUBRAMANIYAN

SIVA SUBRAMANIYAN

Electrical & Instrumentation
Nagai

Summary

Strategic Supervisor with expertise prioritizing projects, planning workflow and managing employees to achieve operational goals. Resourceful individual with 16 years of active experience managing efforts within deadline-driven environments. Diplomatic individual with strong leadership and decision-making skills.

Overview

17
17
years of professional experience
2
2
Languages

Work History

Electrical Supervisor

LKP Engineering Pte.Ltd as a Client MSD & Syngenta
02.2018 - Current
  • Coordinated electrical system maintenance and repair with other departments, outside agencies and public utilities.
  • Resolved technical issues swiftly, applying troubleshooting expertise for minimal disruption to ongoing operations.
  • Implemented preventive maintenance programs that increased equipment life expectancy and reduced repair expenses over time.
  • Improved project efficiency by effectively managing electrical installation and maintenance tasks.
  • Reduced downtime in production facilities by promptly addressing and resolving electrical issues.

Electrical Maintenance & Lifting Work Activities

Hiapseng Engineering Ltd as a Client JGC
05.2015 - 05.2016
  • Project: SRC Mogas Cogen Project
  • Troubleshot problems with engines and breakers.
  • Performed load bank testing on newly installed or repaired generators to ensure they met established performance standards before returning them to operation.
  • Maintained accurate records of all completed tasks, facilitating smooth project management and progress tracking.
  • Conducted thorough post-installation assessments to identify any potential issues early on before they became larger problems later down the line.
  • Oversaw installation, maintenance and repair of power lines, electrical systems, fixtures and appliances.

Electrical Maintenance Technician

Hiapseng Engineering Ltd as a Client Evonic
05.2013 - 08.2014
  • Reduced downtime through efficient diagnosis and repair of electrical issues in production machinery.
  • Maintained comprehensive documentation of repairs, upgrades, and maintenance activities to ensure accurate recordkeeping.
  • Collaborated with engineering teams to design, install, and commission new equipment, ensuring optimal performance.
  • Coordinated with external contractors on major projects involving complex installations or repairs of high voltage systems.
  • Performed root cause analysis on recurring equipment failures and implemented corrective actions to prevent future occurrences.

Electrical Maintenance Technician

Lanxess XformulaX
05.2013 - 05.2014
  • Reduced downtime through efficient diagnosis and repair of electrical issues in production machinery.
  • Improved safety standards by conducting thorough inspections and implementing corrective actions for electrical hazards.
  • Collaborated with engineering teams to design, install, and commission new equipment, ensuring optimal performance.
  • Coordinated with external contractors on major projects involving complex installations or repairs of high voltage systems.

Electrical Maintenance Technician

Hiapseng Engineering Ltd as a Client SLNG Terminal
07.2012 - 04.2013
  • Planning , undertaking scheduled preventive maintenance
  • Preventive maintenance and troubleshooting monthly report documentation
  • Preventive maintenance of motor and starters
  • Perform electrical trouble shooting and instrumentation

Electrical Technician

WOONGNAM SINGAPORE PTE LTD
11.2010 - 06.2012
  • Project: Singapore LNG Terminal project
  • Tested wiring and other system parts for electrical flow and function.
  • Tested, troubleshot, and calibrated equipment in shop and field.
  • Inspected equipment for defects and safety hazards and completed necessary repairs.
  • Performed preventive maintenance tasks to verify proper working condition of electrical panels and conduits.

Electrical Technician

Hapseng Engineering Ltd
02.2009 - 10.2010
  • Project: Neste oil project
  • Developed and executed wiring installations for new construction projects, ensuring compliance with electrical codes.
  • Used information in technical diagrams, schematics, and manuals to understand operations and make successful repairs.
  • Created, aligned, and optimized electrical instrumentation and testing equipment.

Electrical Technician

Hiapseng Engineering Ltd
03.2008 - 01.2009

Project: ECC project Bukkum Island

  • Inspected equipment for defects and safety hazards and completed necessary repairs.
  • Improved energy consumption by conducting regular energy audits and implementing recommendations.
  • Performed preventive maintenance tasks to verify proper working condition of electrical panels and conduits.
  • Managed multiple projects simultaneously while maintaining high levels of quality control throughout each project''s lifecycle.

Education

No Degree - Building Construction

SHE AUDIT & CONSULTING PTE LTD
194,02-19 PANDAN LOOP
04.2001 -

No Degree - LIFTING SUPERVISOR

SHE AUDIT & CONSTRUCTION PTE LTD
194,02-19,PANDON LOOP
04.2001 -

No Degree - RIGGER & SIGNALMAN

V SAFE
42 Toh Guan Road East
04.2001 -

Skills

Analytical Thinker

Quick Learner

Electrical installation

Electrical troubleshooting

Electrical testing

Project management

Motor controls

Personal Information

  • Passport Number : Y7813568
  • Passport Date Of Issue : 13/10/2023
  • Passport Expiry Date : 12/10/2033
  • Date of Birth : 20/07/1986
  • Gender : Male
  • Nationality : Indian
  • Marital Status : Married

Timeline

Electrical Supervisor

LKP Engineering Pte.Ltd as a Client MSD & Syngenta
02.2018 - Current

Electrical Maintenance & Lifting Work Activities

Hiapseng Engineering Ltd as a Client JGC
05.2015 - 05.2016

Electrical Maintenance Technician

Hiapseng Engineering Ltd as a Client Evonic
05.2013 - 08.2014

Electrical Maintenance Technician

Lanxess XformulaX
05.2013 - 05.2014

Electrical Maintenance Technician

Hiapseng Engineering Ltd as a Client SLNG Terminal
07.2012 - 04.2013

Electrical Technician

WOONGNAM SINGAPORE PTE LTD
11.2010 - 06.2012

Electrical Technician

Hapseng Engineering Ltd
02.2009 - 10.2010

Electrical Technician

Hiapseng Engineering Ltd
03.2008 - 01.2009

No Degree - Building Construction

SHE AUDIT & CONSULTING PTE LTD
04.2001 -

No Degree - LIFTING SUPERVISOR

SHE AUDIT & CONSTRUCTION PTE LTD
04.2001 -

No Degree - RIGGER & SIGNALMAN

V SAFE
04.2001 -
SIVA SUBRAMANIYANElectrical & Instrumentation