Summary
Overview
Work History
Education
Skills
Countryofresidence
Availability
Disclaimer
Education
Personal Information
Timeline
Generic

SHANMUGAM RAMESH

Summary

Accomplished Project Engineer with a proven track record at Qing Jian International, adept in leveraging Auto CAD and Autodesk Revit for efficient project execution. Skilled in fostering team collaboration and leadership, I excel in driving projects to completion while ensuring health and safety compliance, achieving significant milestones in construction management.

Overview

15
15
years of professional experience

Work History

Project Engineer , Senior Site Engineer

Qing Jian International (South Pacific) Group Development Co., Pte. Ltd.
01.2023 - Current
  • To assist Project Manager on the day-to-day management of the site, including supervising and Monitoring the site labor force and the work of any subcontractor
  • Managed resources such as equipment, materials, personnel and subcontractors to achieve project goals.
  • Overseeing the construction activities and progress, planning, implementation, and monitoring work schedules in accordance with the master and detailed work programmed
  • Coordinate with Resident Technical Officers (RTOs) and Resident Engineers (REs) for all required inspections and work verification and Liaise with architect, consultants for technical issues and coordinate the site activities with Subcontractors
  • Developed project plans, budgets, and timelines to ensure successful completion of projects.
  • Work with the project safety team to ensure all work is being carried out to safely
  • Supervise ongoing site activities closely
  • In charge of taking material testing and material submission to consultants for approval
  • In charge of BCA/ERSS preparation of structure work (Apply annex, excavation sequence)

Senior Site Engineer

China State Construction development .Co. Ltd.
05.2022 - 08.2022
  • Company Overview: (Singapore)
  • Manage and control workers and monitor their work closely to keep site safer and neat
  • Supervise ongoing site activities closely
  • Liaise with architect, consultants for technical issues and coordinate the site activities with subcontractors
  • Conduct on site investigations and analyse data (maps, reports, tests, drawings and other)
  • Overseeing the construction activities and progress, planning, implementation, and monitoring work schedules in accordance with the master and detailed work programmed
  • Work with the project safety team to ensure all works are being carried out to the highest levels of safety and attend daily jobsite safety meetings and perform weekly project safety audits
  • Coordinate and control construction work on site
  • Evaluate subcontractors risk assessment, safe work procedures and method statements
  • Review subcontractors/supplier performance after completion works
  • Liaising with supplier, attend meeting with clients
  • Coordinate with onsite Resident Technical Officers (RTOs) and Resident Engineers (REs) for all required inspections and work verification
  • In charge with closing all the defects / Punch lists (Site Memo and Site Observation)
  • (Singapore)

Site Engineer

Penta Ocean Construction. Co. Ltd.
08.2015 - 02.2022
  • Company Overview: (Singapore)
  • Client - Singapore Ministry of Health, General– Outram Community Hospital Project Overview- value 70,000,000 SGD Basement4 and 19storey C: Basement / Car parks Super Structure / Link Bridge 【Building Height】105m Approximately 148,000m²
  • Client - Singapore Ministry of Health, Sengkang General and Community Hospitals Project Overview- value 98,000,000 SGD The 1,400-bed facility will include three buildings linked underground, each with 10 floors above ground and two below, for a total of around 290,000 sq
  • Meters of floor space
  • Client-Housing & Development Board of Singapore Project Overview- Land Reclamation Project value 123,200,000 SGD Boskalis International B.V.(Netherland)(51%) Penta-Ocean Construction Co., Ltd (49%) Reclamation by Polder Method : 810 ha Length of Sea Dike : 10 km, Drainage :29 km ,Pumping System, Dredging Works, Ground Improvement Road Construction
  • I am attending 3 positions in this company as Site Engineer structure, Archi Assistant Engineer involve handover inspection, M&E Assistant Engineer involve FME inspection & testing as per spec
  • Overseeing the construction activities and progress, planning, implementation, and monitoring work schedules in accordance with the master and detailed work programmed
  • Manage and control workers and monitor their work closely to keep site safer and neat
  • Supervise ongoing site activities closely
  • Coordinate with onsite Resident Technical Officers (RTOs) and Resident Engineers (REs) for all required inspections and work verification
  • Work with the project safety team to ensure all work is being carried out to the highest levels of safety and attend daily jobsite safety meetings and perform weekly project safety audits
  • Evaluate subcontractors risk assessment, safe work procedures and method statements
  • Review subcontractors/supplier performance after completion of work
  • Liaising with supplier ordering material
  • In charge of BCA conquas preparation of structure work
  • In charge of taking defect/ closing during handover inspection based on user command closing all the defects / Punch lists (Site Memo and Site Observation)
  • (Singapore)

Site Engineer

SsangYong Engineer & Construction. Co. Ltd.
07.2014 - 07.2015
  • Company Overview: (Singapore)
  • Client- National University of Singapore (NUS) Singapore Project Overview- value 24,000,000 SGD 5 buildings / 28 stories, 1,001 Student Beds, Low-rise lecture rooms, Library, Science Block, Performance Hall, Sports Centre, and Landscaping works
  • Prepare the Façade work follow the drawings and in charge of precast installation and check the quality as per drawing, Gondola (suspended scaffolding) installation for precast silicon, external window works precast touch up and painting, façade lighting, cladding installation
  • In charge of landscape work soil filling and excavation, Monitoring of water proofing work, water leaking rectification and drainage work
  • To coordinate Steel structure installation steel gate, trellis, glass lobby
  • Internal work plaster board installation and paint work
  • Prepare trade demonstrations to be witness and clients and RE/RTO
  • In charge with closing all the defects / Punch lists (Site Memo and Site Observation)
  • Raise Non-Compliance Report and Preventive Action to subcontractor’s
  • Preparation and Construction of Mock-up Unit
  • To coordinate with the Authorities, Subcontractors and external parties on matters relating to the project quality
  • (Singapore)

Site Engineer

GRM Builders Pte Ltd
04.2013 - 06.2014
  • Company Overview: (Singapore)
  • Client - Singapore Ministry of Health Ng Teng Fong General Hospital GS Engineering & Construction Main contractor value 52,000,000 SGD consists of three wards that can hold 1,100 beds and is 16 stories at its highest237,000-square-meter
  • Preparation of bills, check measurements, progress report, monthly invoice submission, attending project meeting with clients
  • Excavation of civil Structures as per drawing & specification
  • Installation of Fuel tanks underneath ground
  • Execution of Steel fabrication work
  • Road work for approach way includes Site Excavation, Surveying, Planning & Assuring of Quality
  • Shoring as per requirement of excavation depth
  • Drainage system and sump work, In charge with Pile foundation and rebar work
  • (Singapore)

Site Engineer

NAPC Pte Ltd
06.2012 - 03.2013
  • Company Overview: (Chennai, India)
  • Client - Musashi Auto Parts India Pvt
  • Ltd
  • Factory, Office & Utilities, 25,058m2
  • Supervising all building works in accordance with the drawings, technical specifications, and bills of quantities
  • Checking of BOQ and fabrication drawing
  • Ensuring the correct implementation of the works according to technical specifications, to designs and quality of materials
  • Contacting of lab tests for Concrete & Steel works
  • Planning, drawing, supervising, and control monitoring the quality of work
  • Preparation of Plan Drawing using AUTO CAD
  • Preparation of check list for individual works and inspection of work as per the checklist
  • Preparing weekly labor bill as per the quantity of work executed by Individual subcontractor
  • Manage teamwork and project goals
  • (Chennai, India)

Asst. Site Engineer

GK Shetty Builders Pte Ltd
05.2010 - 06.2012
  • Company Overview: (Chennai, India)
  • Monitoring the material consumption and the inward material to stores for its quantity
  • Surveying use auto level instrument
  • Preparing the daily site progress report DPR
  • Monitoring and implement quality plans and procedures at the work site as per the standard
  • Checking of BOQ and fabrication drawing
  • Manage teamwork and project goals
  • (Chennai, India)

Education

Diploma - Civil Engineer

Dhana Lakshmi Srinivasan Polytechnic College
01.2010

Skills

  • Workplace Safety and Health Management
  • Basic Construction Safety Supervision
  • Confined Space Operation Supervision
  • Work at Height Management
  • MS-Office
  • Auto CAD
  • Autodesk Revit
  • Subcontracting management
  • Project regulations
  • Corrective action planning
  • Material logistics
  • Client relations
  • Safety-minded
  • Quality assurance

Countryofresidence

Singapore

Availability

1 month

Disclaimer

I hereby declare that the information mentioned above is true & correct to my knowledge.

Education

Diploma (Civil Engineer), 2007 – 2010, Dhana Lakshmi Srinivasan Polytechnic College.

 skils

· Manage workplace safety and Health in construction sites-4 WSH (CSCPM Singapore)

· Basic Construction Safety Supervisor BCSS (Singapore)

· Supervise Work in Confined Space Operation SWCSO (Singapore)

· Manage Work at Height (MWAH)

Language spoken: English (US), Tamil, Hindi

Computer and technical skills:

· MS-Office (Word, Excel, and Power Point),

· Auto CAD

· Autodesk Revit (BIM basic )

Personal Information

  • Age: 32
  • Date of Birth: 04/12/92
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married

Timeline

Project Engineer , Senior Site Engineer

Qing Jian International (South Pacific) Group Development Co., Pte. Ltd.
01.2023 - Current

Senior Site Engineer

China State Construction development .Co. Ltd.
05.2022 - 08.2022

Site Engineer

Penta Ocean Construction. Co. Ltd.
08.2015 - 02.2022

Site Engineer

SsangYong Engineer & Construction. Co. Ltd.
07.2014 - 07.2015

Site Engineer

GRM Builders Pte Ltd
04.2013 - 06.2014

Site Engineer

NAPC Pte Ltd
06.2012 - 03.2013

Asst. Site Engineer

GK Shetty Builders Pte Ltd
05.2010 - 06.2012

Diploma - Civil Engineer

Dhana Lakshmi Srinivasan Polytechnic College
SHANMUGAM RAMESH