Summary

I am an experienced Electrical Engineer with nearly 6 years of experience in Singapore Rail Industry electrical projects and over 11 years of experience in M&E (Mechanical & Electrical) projects. I have possessed a strong understanding of electrical drawings, project planning, and site execution for complex infrastructure works.

Overview

19
19
years of professional experience
1
1
Certification

Work History

Site Engineer

Concord Corporation Pvt Ltd
Singapore
03.2024 - Current
  • Responsible for monitoring and executing electrical works under Power Supply Contract 153, covering stations and TCDD depot across various migration stages for the Jurong Region Line project.
  • Execute electrical equipment installations for Track and Stinger Track systems, including: Stinger Panels Installation, PNL Panel Installation, FVME Panel Installation, OVP Panel Installation, LV/AC, LVDC Control Cabling, 750VDC cabling, High-voltage systems, Testing & Commissioning (SAT) for LV/AC & LV/DC systems, 66kV Load Centers.
  • Manage installation of station and traction power supply equipment, including: 22kV Switchgears, 22kV Transformers, 750VDC Switchgears, 750VDC Negative Panels, Double converter feeder, Double Converter Traction Transformers, Load Break Switches (LBS) panels, ACDBs, DCDBs, isolators, SCCBs, ODF panels, battery chargers with batteries, Traction power cable laying and termination.
  • Conduct structural infringement surveys and develop designs for J-hooks, brackets, and clamps for both track and station areas.
  • Planned and executed Loop Main cable works for stations and tracks, including wagon-based and manual cable laying activities.
  • Coordinated with LTA for track access arrangements and acted as LPIC, attending: Works Train coordinate meetings, Track access and area allocation meetings.
  • Liaised with SWC, clients, subcontractors, and internal teams to resolve technical issues and ensure smooth project execution.
  • Attended project coordination meetings with the client to collect, clarify, and disseminate project information.
  • Assisted in preparation and review of design, construction, and as-built drawings to ensure accuracy and compliance.

Project Supervisor

Concord Corporation Pvt Ltd
Singapore
10.2020 - 03.2024
  • Supervised and managed manpower, materials, and site activities to achieve timely and quality delivery.
  • Installation of 22kV AC Cable & 750V DC Cable.
  • Install and maintain lighting systems and Distribution Boards (DBs).
  • Install new switchboards, generators, and UPS Panels.
  • Carry out equipment location marking at stations and supervise installation works.
  • Manage Testing and Commissioning (T&C) activities for railway electrical projects.
  • Perform 22kV XLPE cable insulation resistance (Megger) testing for cable joints and terminations to switchgear.
  • Attend inspection and testing of electrical equipment with relevant stakeholders.
  • Ensure compliance with approved procedures and safety standards.
  • Supervise workers and installation activities to ensure adequate manpower and materials for timely project completion.
  • Conduct toolbox meetings and explain work scope to workers.
  • Brief workers on installation method and safety instructions.

Electric & Site Supervisor

CH Engineering & Services Pte Ltd
Singapore
05.2017 - 10.2020
  • Read, review, and analyze electrical blueprints, drawings, and schematics.
  • Diagnose electrical system malfunctions and failures and recommend corrective actions.
  • Perform electrical risk assessments to assess electrical processes and procedures.
  • Support continuous improvement by keeping up to date with evolving technologies and industry practices.
  • Assist in preparation and updating of construction and as-built drawings.
  • Supervise workers and installation activities to ensure adequate manpower, materials, and timely project completion.
  • Conduct toolbox meetings to explain work scope and safety requirements to workers.
  • Brief workers on installation method and work instructions.
  • Carry out equipment location marking at stations and supervise installation works.
  • Ensure daily housekeeping is maintained at site.
  • Attend site inspections and close out final punch list items and support handover activities.
  • Attend inspection and testing of electrical equipment with relevant parties.
  • Ensure works are executed in accordance with approved drawings, procedures, and quality standards.
  • Prepare and submit daily work progress reports to management.

Electric & Site Supervisor

Indeco Engineers Pte Ltd
Singapore
05.2015 - 05.2017
  • Ensure all daily site works and site personnel adhere to the Company/Project construction schedule and Quality Systems.
  • Conduct physical inspections of work zones to monitor work activity and compliance with standards.
  • Maintain site record book and daily documentation at the end of each day.
  • Monitor and manage the performance of sub-contractors, ensuring work quality and timely completion.
  • Enforce quality standards across all site activities.
  • Support the Project Engineer and Project Manager in overall project management and coordination.
  • Assist with planning electrical works and plant maintenance activities.
  • Collaborate with the production team to ensure projects are completed within scheduled timelines.
  • Ensure effective utilization of site resources, including labour, machinery, materials, and subcontractors.
  • Report project status regularly to management.
  • Perform electrical and electronic instrument maintenance and checking.
  • Oversee panel board and distribution box installation, including inspection and verification.
  • Assist in troubleshooting, preventive maintenance, and ensuring operational readiness of electrical systems.

M&E Technician

Kim Yew Integrated Pte Ltd
Singapore
07.2011 - 05.2015
  • Inspect wiring systems and electrical fixtures to ensure compliance with company specifications and local electrical codes.
  • Perform and support hands-on electrical installation activities when required.
  • Review production schedules and estimate man-hour requirements for timely completion of assigned work.
  • Estimate, requisition, and inspect material and tools to ensure availability and suitability.
  • Maintain time, manpower, and production records.
  • Coordinate with other supervisors to align activities across departments.
  • Interpret specifications, drawings, blueprints, and job orders to workers and assign duties accordingly.
  • Communicate company policies to workers and ensure strict enforcement of safety regulations.
  • Analyze and resolve work-related issues or assist workers in troubleshooting problems.
  • Initiate and recommend motivational and productivity improvement measures for work teams.
  • Provide safety supervision for all types of electrical installation works.
  • Recommend improvements in production methods, equipment performance, and work quality.
  • Suggest changes to working conditions and equipment usage to improve efficiency and productivity.

M&E Technician

M-Tech Air-con Security Engineering Pte Ltd
Singapore
10.2007 - 07.2011
  • Carry out electrical installation works for building and M&E systems.
  • Install and commission Distribution Boards (DB panels).
  • Perform power cable laying termination and addressing.
  • Install trunking, cable ladders, and cable trays as per drawings.
  • Install and maintain CCTV systems, including cameras, cabling, and accessories.
  • Perform data cable installation, routing, termination, and testing.
  • Install, service, and maintain Air Handling Units (AHU).
  • Install and service Fan Coil Units (FCU).
  • Carry out Cooling Tower servicing.
  • Install and service cassette-type air-conditioning units.
  • Ensure installations comply with approved drawings, specifications, and safety requirements.

Education

Diploma - Electrical

Ngee Ann Polytechnic
Singapore

NITEC - Technology, Electrical Power & Control

ITE College
Singapore
01-2020

Skills

  • Electrical Power Distribution Systems
  • High Voltage & Low Voltage Systems
  • Electrical Drawings & Schematics
  • Cable Routing & Installation
  • Site Coordination & Supervision
  • Microsoft Office
  • Safety Procedures & Permit Systems
  • Railway Electrical Infrastructure
  • Strong leadership skills
  • Excellent communication abilities
  • Ability to work under pressure
  • Good coordination and planning skills
  • Strong problem-solving mindset
  • Safety-focused and detail-oriented

Certification

  • BCSS Building Construction Supervisor Safety Course (Singapore)
  • WHS Work at height supervisor Course (Singapore)
  • Supervisor for Confined space (Singapore)
  • Safe Management Office Course
  • Microsoft Excel Basic to Advance Training (Bangladesh)
  • Skills Evaluation Certificate 4 (Bangladesh)

Other language(s)

English: Listening B2, Reading B2, Spoken interaction B2, Spoken production B2, Writing B2
Hindi: Listening C2, Reading C1, Spoken interaction C2, Spoken production C2, Writing C1
Malay: Listening C1, Reading C1, Spoken interaction C1, Spoken production C1, Writing C1
Bengali: Listening A, Reading A, Spoken interaction A, Spoken production A, Writing A

Timeline

Site Engineer

Concord Corporation Pvt Ltd
03.2024 - Current

Project Supervisor

Concord Corporation Pvt Ltd
10.2020 - 03.2024

Electric & Site Supervisor

CH Engineering & Services Pte Ltd
05.2017 - 10.2020

Electric & Site Supervisor

Indeco Engineers Pte Ltd
05.2015 - 05.2017

M&E Technician

Kim Yew Integrated Pte Ltd
07.2011 - 05.2015

M&E Technician

M-Tech Air-con Security Engineering Pte Ltd
10.2007 - 07.2011

NITEC - Technology, Electrical Power & Control

ITE College

Diploma - Electrical

Ngee Ann Polytechnic

Core Competencies

  • Rail Electrification & Power Supply Systems
  • HV/MV/LV Cable Installation and Termination

Social skills and competences

  • Problem solving attitude & Problem-Solving Skills
  • Creative & Critical Thinking Skills
  • Basic Circuit Knowledge
  • Organization Skills
  • Communication Skills
  • Ability to establish & maintain good working relationships with people of different national & cultural background
  • End-oriented work capacity

Organisational skills and competences

  • Project Management
  • Project planning and control
  • Strong teamwork and communication skills
  • Good technical knowledge in electrical works
  • Safety-conscious and reliable
  • Able to work under pressure and meet deadlines
  • Fast learner and adaptable

Computer skills and competences

Proficient in Microsoft Office - Excel, Word, PowerPoint

Declaration

I assure certify that the above in sequence is true and correct to the best of my knowledge. Shai Md Imran Date: 2026-01-26
Shaik Md Imran