ProjectManager
Senthilnathan  Kandhan

Senthilnathan Kandhan

Project Manager

Summary

Project Management Professional (PMP)® with 30 years of experience in Project Management, Designing, Site Progress monitoring, Quantity Surveying, Tender proposals, Bill of Materials and Scheduling using MS Project and MS Excel etc., for various systems like Fabrication of boiler accessories system, Water & Waste Water Treatment System, Fire alarm & fire protection system, Weighbridge & traffic management with security system expertise extends to Data Center setup and installation of various Mechanical & Electrical equipments for automation and construction projects which involves co-ordination with Clients & Sub-contractors, QA/QC Inspections, report writing, documentation such as material take-off, man-hours and cost estimation, contract negotiation, preparing and assessing variation claims, progress claims preparation of drawings using AutoCAD, Revit MEP & MicroStation and submission of documents to Government Authorities.

Completed the Construction Safety Course (2016) for Project Managers, Singapore, and the Certificate course in AutoCAD (1995) & Revit MEP (2016).

Overview

20
20
years of professional experience

Work History

Project Manager

L&D Engineering and Logistics Pte Ltd
Singapore
12.2025 - Current
  • CapitaLand Buildings and Warehouses – A&A works
  • Developed project plans, timelines, and resource allocation strategies for optimal execution.
  • Developed comprehensive risk management plans, minimizing project delays and unexpected challenges.

Project Manager

K.B.C. Engineering Pte Ltd
Singapore
05.2025 - 12.2025
  • SPH – PC3 Warehouse – Pre-action Control System - Completed
    DSTA – MDT (Jurong and Pulau Tekong camps)
    DSTA – R&R (Jurong, Kranji, Maju, Rifles Range, and Pulau Tekong camps)
  • Developed project plans, timelines, and resource allocation strategies for optimal execution.
  • Implemented risk management processes to identify and mitigate project challenges effectively.
  • Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.

Senior Project Engineer / Project Manager

GIB Automation Pte Ltd
Singapore
05.2022 - 03.2025
  • Projects - LTA Projects (R178A, N178B & TR243), Changi Terminal 2 Maintenance (IBMS), and SingTel Exchange Data Center (CGS)
  • To prepare Tender Documents as per the contract.
  • To attend/conduct project meetings as required and manage task forces/resources.
  • To communicate with the client and subcontractors throughout the project and coordinate the efforts of all the internal departments to ensure that the Products and Services are delivered on time and of assured quality.
  • To liaise with field staff, junior engineers, and sub-contractors on matters related to day-to-day Installations and Testing & Commissioning activities at the project site.
  • To prepare theOperation & Maintenance manuals and hand over documents.

Engineering Manager

SAC (PTE) LTD
Singapore
01.2008 - 04.2022

Projects handled - Security-enabled Automatic Weighbridge system at Exxon Mobil, Jurong Island with Katoen Natie Singapore Pte Ltd & Mitsubishi Engineering & Shipbuilding Co., Ltd
Static Weighbridge system and Data Center at Construction Industries Park (BCA), Pulau Punggol Timor, under CPG consultants
A. Automatic weighbridge system at Air Liquide (Soxal), Jurong Island, under Simon Carves (Sembawangenc) consultants
B. Weighbridge system at Doha Sewerage Plant, Doha, under Keppel Seghers
C. Weighbridge system at JTC, Jurong Port, Jurong Island under PSA, Singapore
D. Electronic Transportation Recording System (ETRS), Electronic Integrated Management System (EIMS) & Weighing Control and Data Management Systems (WCDMS) with Data Center setup at various LTA & DSTA sites.
E. Proof of Concept – Weighing in Motion System (WIM) at PSA, PPT Gate 4.
Variable Sign Boards – LTA Projects (RP137, MCE465, TT185 & TT188) with main contractors ST Electronics (Info-Comm Systems) Pte Ltd and Tyco – Preparation of documents, Site survey & Structure Installation of Cantilevers & Gantries

  • To prepare Tender proposals, Bill of Materials, Design, Shop drawings, and Process & Instrumentation Diagram as per the contract.
  • To plan, execute & and monitor site activities involving Installations, T&C activities, Quantity Surveying, Safety, and ensure QA/QC inspections with theConsultant’s Clerk of Works are carried out as per site requirements.
  • To attend/conduct project meetings as required and manage task forces/resources.
  • To communicate with the client and subcontractors throughout the project and coordinate the efforts of all the internal departments to ensure that the Products and Services are delivered on time and with assured quality.
  • To liaise with field staff, junior engineers, and subcontractors on matters related to day-to-day Installations and Testing & Commissioning activities at the project site.
  • To prepare Progress claims, As Built drawings, Operation & Maintenance manuals, and hand over documents.
  • To assist the Professional Engineer and submit the Structural Plan, Work Permit application, and TOP/CSC (Completion Certificates) to BCA, PUB etc.

Project Engineer

GIB Automation Pte Ltd
Singapore
10.2005 - 12.2007
  • Design & manage conceptual development per CP 10 & 25, and draft proposals and plans.
  • Analyze theclient’s needs/requirements and propose appropriate automation solutions to the client’s satisfaction.
  • Responsible for Tender proposals, Bill of Materials, Design, Shop drawings, Schematic Diagram, and Mimic drawings as per contract.
  • Demonstrate careful & thorough thought processes and follow through with execution of deliverables.
  • Plan, execute & monitor site activities involving Installations, T&C activities, safety, and ensure QA/QC inspections with the Consultant’s Clerk of Works are carried out as per site requirements.
  • Prepare Progress claims, Combined Services drawings, As-built drawings, Operation & Maintenance manuals, and hand over documents.
  • Assisted in project planning and scheduling to ensure the timely completion of engineering tasks.
  • Supported documentation efforts by organizing project files and reports for team access.
  • Reduced project timelines with proactive planning and close monitoring of progress.

Education

Marketing & System

Madurai Kamaraj University
India
05-2002

Bachelor of Engineering - Mechanical Engineering

Ratnavel Subramaniam College of Engg. & Tech.
India
05-1993

Skills

Project management

Project planning and development

Project scheduling

Cost control

M&E Systems installation, configuration, and upgrading

Task prioritization

Timeline

Project Manager

L&D Engineering and Logistics Pte Ltd
12.2025 - Current

Project Manager

K.B.C. Engineering Pte Ltd
05.2025 - 12.2025

Senior Project Engineer / Project Manager

GIB Automation Pte Ltd
05.2022 - 03.2025

Engineering Manager

SAC (PTE) LTD
01.2008 - 04.2022

Project Engineer

GIB Automation Pte Ltd
10.2005 - 12.2007

Marketing & System

Madurai Kamaraj University

Bachelor of Engineering - Mechanical Engineering

Ratnavel Subramaniam College of Engg. & Tech.
Senthilnathan KandhanProject Manager