IT professional with +10 years of experience specializing in IT Department management for international companies, can implement effective IT strategies. The greatest strength is business awareness. It enables to permanent streamlining of infrastructure and applications. Professional Summary Able to develop detailed project work as per required work scope, Maintaining application & system software at a supported version. Ability to perform both manual testing and automation testing, Functional and Non-Functional testing Excellent leadership skills and intelligence to influence key decisions, Proactive team player with excellent analytical and planning skills. Meet project deadlines, identify project obstacles, proactively mitigate risks and escalate and resolve issues effectively. Regular status monitoring to identify project risks and work closely with team members to mitigate the risks and resolve project issues, monitor project performance, and actively take preventive actions.
Overview
11
11
years of professional experience
Work History
Test Manager
CPF BOARD
06.2022 - Current
RA Project
Duties & Responsibilities:
Preparing Test plans, Analyzing test case coverage, Test data preparation, Reviewing test report
Handled SIT, UAT, Application testing, Performance testing, and Regression testing.
Software QA Engineer
Hitachi Pte Ltd
02.2020 - Current
Project Handling: R&D Project
Trained in Requirement Analysis, Test Strategy preparation, Test Plan preparation, Test Scenario Review, Test cases Review, RTVM Preparation, Test cases Execution Review, Defect Reporting & Tracking, and Test Cycle Closure
Handling Agile Method
Automation Script Development, Maintenance and Testing
Automating Regression suite and complete End to End flow; developing automation scripts for entire user on every sprit on agile process for regression testing
Executed scripts in multiple browsers (IE, Firefox, and Chrome)
Using Selenium UAT and Production Support.
Test Engineer Officer
LTA
01.2020 - Current
Responsibilities:
Analyzing requirements as per test plan, Application testing, Performance testing, Equipment testing, and Regression testing strategy preparation
Testing on illegal execution of software (Integrity check)
The audit log is collected by ERP2 for each log type for verification – WWAN communication log and Event log
Preparing and Verifying RP analysis report
Preparing and Verifying the ENF report
Preparing and verifying the TDCID report
Verifying and preparing reports for SST and SRT test cases.
Application Test Engineer
Mitsubishi Heavy Industries Asia Pacific Pte Ltd
02.2019 - 12.2019
Project Handling: LTA TR 150(ERP2) Project
Duties & Responsibilities
Analyzing requirements as per test plan, Application testing, Performance testing, Equipment testing, and Regression testing strategy preparation
Check from the console of Laptop PC console of the Laptop PC the process of the SC and AC application
Executing Test cases on the Operation mode of MSC in Actual mode, Start state, and Suspend state
Testing on illegal execution of software (Integrity check)
The audit log is collected by ERP2 for each log type – Error log, WWAN communication log, and Event log
Periodical Health check status report captured at regular interval of time
Test cases prepared for performance time synchronization at time intervals based on the signal in suspend state and start state– Event log
Checking LAN cable connected to HUB equipped in BS and BCS, test report submitted based on a visual check
Ability to understand organizational needs.
EIS Application
01.2013 - 01.2017
SAFRAN Planning
01.2013 - 01.2017
Qmetry Testing Tool
01.2013 - 01.2017
Worked in Qmetry testing tool, both manual and automation testing. Running all test cases and generating reports on each test case
Test Planning & Documentation
Ability to carry out end-to-end testing cycle independent
Testing life cycle, BDD, TDD
Tested applications like Engineering Information System, Planning tool, Poarch, PDMS, completed project setup, generated project interface, and updated progress
High-level traceability, reusability, and visible linkages for test cases
Setting interface with other systems and checking the data transformation
Assigning and testing, test cases based on client requirement
Creating new DB View as per project requirement and reporting