Summary
Overview
Work History
Education
Skills
Timeline
Generic

Satheesh Kumar

Engineer

Summary

Dynamic engineer with extensive experience at Micron Semiconductor Asia, excelling in project management and system design. Proven track record in leading quality improvement initiatives, enhancing efficiency, and managing complex tool installations. Skilled in time management and construction oversight, delivering projects that meet stringent semiconductor industry standards.

Overview

21
21
years of professional experience

Work History

Engineer

Micron Semiconductor Asia Pte Ltd
04.2022 - Current
  • Tool installation and deinstallation with the scope PCW, UPW, Drain, HIVAC, Structural, Electrical, Gas, Chemical, foundation, Exhaust, LSS, Networking.
  • Manage all aspects of tool install day to day operations including dynamic schedule, quality control, manpower resource planning, material inventories, work procedure, document compliance, cost management and contractor management.
  • Manage all outside contracted tool install engineering work using professional experience.
  • Tool install utilities design for fist of a kind tool, material spec alignment, drive BKM alignment, standardize documentation for all modules tool type.
  • Leads quality improvement initiatives to reduce Tool install delays and fab impacts and improve efficiency.
  • Incorporate safety controls in every aspect of the design, enhancement and modification process in accordance with design standards and specifications.

Site Engineer

COSMIC Engineers Pte Ltd
12.2019 - 03.2022
  • PCW lateral replacement from PVC to SS 304.
  • Slurry drains submain installation for CMP tools.
  • PHE capacity expansion.
  • Support maintenance of mechanical systems such as scrubbers, Diesel generators, Air Handling units, pumps etc.
  • Repair work of utility piping.


Business Development Manager

CSQUARE ENGINEERING
01.2018 - 11.2019
  • Generated new business with marketing initiatives and strategic plans.
  • Reached out to potential customers via telephone, email, and in-person inquiries.
  • Negotiated and closed long-term agreements with new clients in assigned territory.
  • As a Project Engineer responsible for Fabrication, Installation and Commissioning of HVAC systems both high and low side for VRF system. Responsible for Ducting Installation, piping fabrication and installation (Copper and Chilled water piping).

Senior Project Engineer

LEAD MANAGEMENT ENGINEERING AND CONS PTE LTD
12.2007 - 10.2014
  • Prepare costing for Tendering / bidding.
  • Coordinate with the design engineer for the design of equipment bases and piping (HIVAC, DRAIN, PCW and chemical sysytems).
  • Coordinate, inspect and follow up with the subcontractors and suppliers continuously for the timely delivery of the materials.
  • Plan day to day activities at site.
  • Train the workers continuously and monitor in regards to Safety and Quality of work.
  • Ensure the job completed quality meets the standard for semiconductor industries
  • Control the cost by effective use of manpower and job planning.

Project Engineer

Hindustan Unilever
03.2006 - 11.2007
  • Daily work planning for mechanical, electrical and civil contractors.
  • Jobs like fabrication of MS, SS and IBR pipe lines including weld testing by use of NDT method.
  • Erected 12 TPH oil fired fire tube boiler, chillers, compressors, Dehumidifiers and pumps.
  • Operation of Spray drier and handled machineries like Roasters, Boilers, Air compressors, Dehumidifier, Chillers and pumps etc.

Project Trainee

Exide Industries Ltd
01.2004 - 04.2005
  • Co-ordinating in all aspects (layout finalization, arranging materials, following up the contractors for the work to be done, erection and commissioning.).
  • 4-nos. grid casting machines, Erected & commissioned new assembly line (Taiwan machines) within 2 days, Alloy Blending plant which reduces overall plant scrap more than 50%,Grid casting Single feed line project in progress.
  • Responsible for all kinds of fabrication works.

Education

Bachelor of Mechanical Engineering - Mechanical Engineering

Mohammed Sathak Engineering College
Kilakarai, Tamilnadu
04.2001 -

Skills

Time management

Project management

System design

Construction oversight

Timeline

Engineer

Micron Semiconductor Asia Pte Ltd
04.2022 - Current

Site Engineer

COSMIC Engineers Pte Ltd
12.2019 - 03.2022

Business Development Manager

CSQUARE ENGINEERING
01.2018 - 11.2019

Senior Project Engineer

LEAD MANAGEMENT ENGINEERING AND CONS PTE LTD
12.2007 - 10.2014

Project Engineer

Hindustan Unilever
03.2006 - 11.2007

Project Trainee

Exide Industries Ltd
01.2004 - 04.2005

Bachelor of Mechanical Engineering - Mechanical Engineering

Mohammed Sathak Engineering College
04.2001 -
Satheesh KumarEngineer