Professional with proven track record in project support, skilled in coordinating tasks, managing schedules, and ensuring project milestones are met. Strong focus on team collaboration, adaptable to changing needs, and consistently reliable. Expertise in project management software, resource allocation, and stakeholder communication. Known for problem-solving abilities and keen eye for detail, driving projects to successful completion.
Project Clientele: Micron FAB 10X Expansion of Central Utility Building (CUP)- Singapore (06/2024 to Current)
Main Contractor : Exyte Singapore Pte Ltd
Project Scope : Underground utility Pipes Diversion, Installation of UG Sanitary Pipes, Installation of Wet Pipings (NPW, PW, PW-EMSH), Valve Insertion/ Hot tapping / Inflatable Line stop on Live lines for active diversion, Installation/Testing and Commissioning of Chilled water System Including Chillers/ Cooling tower/ Heat Exchangers.
Project Clientele: Micron FAB 10N Expansion -FGB- Singapore (08/2022 to 04/2024)
Project Scope : Installation of Chilled Water Piping for Makeup air unit and Fan coil unit, Installation of wet Piping systems including Potable and Non-Potable Water, Installation of Industrial Waste piping in Flammable Gas Building Project at Micron FAB 10N Singapore
Roles and Responsibilities:
Project Clientele: Micron FAB 10 N/X/A, Woodland, Singapore
Main Contractor : Exyte Singapore Pte Ltd
Projects Handled:
Project Scope: Diversion of Underground Services (PW, Natural Gas, Non-Potable Water, Diesel Line) for New Micron FAB 10A Construction (08/2018 to 02/2019)
Project Scope: NPW, PW, Fire Hydrant, and Sprinkler Ring Installation, Testing and Commissioning (03/2019 to 10/2019)
Project Scope: Installation of Chilled Water Piping and Cooling Tower for the HVAC system, Testing and commissioning Activities (10/2019 to 08/2020)
Project Scope: Installation of Sanitary sewer line by Pipe Jacking and Sewer Line Diversion work Project ( 09/2020 to 10/2021)
Project Scope: Installation Natural Gas UG Piping, MPRS Commissioning, Lateral Installation for Wafer Chip Tools (08/2021 to 06 /2022)
Adhoc Maintenance scope: Serving In house contractors in Micron Plant by attending PM, and CM work for all Pumps and Strainer cleaning work / Pump Alignment and bearing / Mechanical Seal Replacement work.
Roles and Responsibilities:
Project Clientele: MSD International GMBH -Tuas, Singapore
Project Handled : Installation of Process Vent, N2, Glycol Line for Narlaprevir tablet batch Project / Installation of BPE tubing for Equipment Wash tank Project
Roles and responsibilities:
Project Clientele: Coco Cola - Tuas, Singapore
Main Con: Exyte Singapore GMBH
Project Handled : Installation of Automated storage Retrieval System (ASRS)
Roles and Responsibilities:
Project Clientele: Honey Well Lab technology solution - Madurai, India.
Project Details : Installation, Testing, and Commissioning of Fire fighting System including Fire hydrant, Fire Sprinkler, Hose reel, Dry Riser, Smoke detectors, Fire alarm ( 05/2013 to 03/2014)
Project Clientele: Nittan Valves India Tech Pvt Ltd - Sri city, Andhra Pradesh, India.
Project Details : Installation, Testing and Commissioning of 30KL UG Diesel tank with high speed Diesel Line, C2H2, O2, N2 line including Pumps and Distribution Laterals to equipment (08/2014 to 03/2015)
Project Clientele: Britannia Industries Limited - Bidadi, Bangalore, India.
Project Details :Installation of air compressor having 600 CFM with air receiver tank air filter and Piping Accessories and Supply, Installation, Testing, and commissioning of Chilled Water System (06/2014 to 07/2015)
Project Clientele: CMRL- Chennai, India.
Project Details : Installation, Testing and Commissioning of Fire fighting System includes Fire hydrant, Fire Sprinkler, Hose reel, Dry Riser, Smoke detectors, Fire alarm for the Metro Rail stations in Chennai (07/201 to 02/2016)
Roles and Responsibilities :