Summary
Overview
Work History
Education
Skills
Personal Information
Apprenticeship
Date Of Availability
Hobby
Languages
Timeline
Generic
Santos Erwin Manurung

Santos Erwin Manurung

Samarinda

Summary

Focused Commissioning Engineer offering 2-year background overseeing installation of plants, systems and equipment. Expertise in creating and carrying out test procedures and investigating problems and troubleshooting issues. Focused leader dedicated to motivating teams to achieve higher levels of performance excellence.

Overview

18
18
years of professional experience

Work History

Plant Service & Commissioning Engineer

Ammann Singapore
10.2024 - Current
  • Company Overview: Plant Service & Commissioning Engineer for the Southeast Asia region.
  • Erection and commissioning of plants
  • Providing direct technical support to plant owners, operators and crew
  • Regular visits to existing plants for sales opportunities on parts, service and retrofits
  • Reviewing Documentation: Examining technical documentation, contractual requirements, and design specifications.
  • Developing Commissioning Plans: Creating work packages and procedures with input from discipline engineers.
  • Supervising Field Activities: Overseeing and coordinating commissioning activities on-site.
  • Testing and Verification: Conducting tests to ensure that individual components or subsystems operate as intended.
  • Troubleshooting and Problem Solving: Identifying (Mechanical, Electrical, Instrument or pneumatic) and resolving issues during the commissioning process.
  • Ensuring Safety: Implementing and enforcing safety protocols and procedures during commissioning activities.
  • Preparing Documentation: Creating and maintaining commissioning dossiers and test reports.
  • Coordinating with Stakeholders: Liaising with vendors, contractors, and other team members.
  • System Walk-downs: Performing detailed inspections of equipment and systems.
  • Maintaining System Efficiency: Ensuring that systems operate at optimal capacity.
  • Plant Service & Commissioning Engineer for the Southeast Asia region.

Electrical Supervisor & Central Control Room Supervisor

PT.Ganda Alam Makmur Coal Mining
06.2017 - 10.2024
  • Company Overview: Coal mining company.
  • Assisted in distributed system voltage performance analysis
  • Troubleshooting in all electrical at coal mining system
  • Proficiency in AC/DC motor drives (VFD) 400 V, transformer & switchgear 20kV, PLC, SCADA and Generator (Caterpillar, Cummins)
  • Ensure reliability and safety of all electrical systems and modification / maintenance
  • Handled for operation in control room conveyor area
  • Participated in all development process activities
  • Evaluate electrical systems in the field, recommend modification and repair plans coordination with electrical engineering
  • Coal mining company.

Technical Supervisor (Steam Turbine Generator)

PT.OKI Pulp & Paper
Palembang,Indonesia
12.2014 - 02.2017
  • Company Overview: Pulp and paper mills (Sinarmas).
  • Operation and maintenance for all Diesel Generator (DG plant) + Condensate Polisher Plant + Cooling tower Plant
  • Support power generating operations (power distribution 33 kv -150 kv) to manage reliable power delivery in the mill
  • Provide operational support for Turbine generator operation
  • Coordinate work with electric and instrument department
  • Support maintenance efforts Diesel Generator, electrical motor
  • Support project for CPP and CT plant (technical review), construction reviews with EPC contractor, pre commissioning and commissioning for all equipment at CPP, CT plant
  • Pulp and paper mills (Sinarmas).

Electrical Power Generating Engineer

PT.Oki Pulp and Paper mills/SinarMas
01.2014 - 01.2015
  • Company Overview: Electrical Instrument at generator Plant.
  • Responsibility for project (construction), maintenance and commissioning using a brand YCSR 3x 1.5 MW (7 unit) with using auto synchronizing /PLC & fuel separator (Alfa Laval) is done and still progress with a Generator Mitsubishi 2x 1.8MW (2 unit) with using auto synchronizing /PLC and YCSR 7 x 3 MW (7 unit) + 2 x 800 (2 unit) kva is still progress and continue to Power Plant 4 x 125 Mw using a Mitsubishi Electric
  • Maintenance a electric ACB and switchgear (SIEMENS, ABB)
  • Electrical Instrument at generator Plant.

Electrical Supervisor

PT.Kertas Nusantara
Berau, East Borneo
11.2010 - 11.2014
  • Company Overview: Pulp Craft mill.
  • Troubleshooting in electrical
  • AC Drive motor inverter
  • DC Drive motor inverter
  • Schedule and maintenance for electrical equipment, Switchgear at Power Plant (Siemens), Harmonic Filter transformers, Allen Bradley PDC System + electrical protection + MCC, ABB PDC system + electrical protection
  • Performed Fault troubleshooting, operating and controlling a generator
  • Schedule and maintenance for transformer, switchgear, UPS and electrical motor, ESP system, PLC (Allen Bradley), commissioning, GE multilin
  • Schedule for start-up and harmonic filter
  • Start up and maintenance at power plant
  • Troubleshooting at compressor (Ingersoll Rand), ESP at power plant and recovery, ID fan & FD fan
  • Pulp Craft mill.
  • Training: Basic Safety Awareness, Safety & Health in Work Place, Power cable Training, AC & DC drive motor inverter, AK3 Listrik Certified, Turbine and UPS backup, Transformer maintenance training

Instrument Technician

PT.DEN
01.2014 - 03.2014
  • Company Overview: Shutdown maintenance.
  • Maintenance for instrumentation and fabrication at workshop
  • Shutdown maintenance.

Electrical Technician

PT.Kiani Kertas
Berau, East Borneo
05.2007 - 05.2010
  • Company Overview: Paper manufacturing company.
  • Responsibility electrician maintenance shift mill wide include:
  • Power Plant maintenance with synchronize (start up) a genset MAN (800 Kw) x 6 unit and genset wabash/General Electric/General Motor (2,5 Mw) x 6 unit, ESP system same with a Recovery Boiler
  • Chemical Plant/Petro chemical start up with Chlorine Dioxide (ClO2) Rectifier 2 x 10850 KVA, 3 – 6 phases with HV 11000 Volt-567 A and Chlor Alkali (Cl2) Rectifier 2 x 3120 KVA, 3 – 6 phases with 11000 Volt-164 A plus the Generator Set Onan 1000 KVA (800 Kw), 50 Hz as Emergency Power and Air Separation Plant (ASP) with Siemens Electric Motor 3300 volt
  • Pulp Machine/Machinery Plant with Reliance Electric Motor controlled by Frequency/Variable Speed Drive from Reliance Electric Control (PLC) and Reliance Electric plus Toshiba Electric Motor Medium Voltage (MV) 3300 Volt with Allen Bradley Electric Panel MCC
  • Fiber Line Area with Toshiba Electric Motor 3300 Volt controlled by Frequency /Variable Speed Drive AC 3300 volt by Toshiba
  • Line Klin – Recaustizing/Cement Plant with Toshiba Electric Motor Drive controlled by Variable Speed Drive AC 3300 volt and DC 600 volt and ESP system
  • Wood Yard and Preparation with Toshiba Motor Electric 3300 Volt controlled by Allen Bradley panel control and PLC plus Electric Motor DC, Portal Crane by P&H
  • Water Intake and Water Treatment with Toshiba Electric Motor 3300 Volt controlled by Allen Bradley panel control + PLC
  • Together DCS, Instrumentation and Mechanical persons working on troubleshooting at MCC and DCS rack room
  • Project for new genset Man (800 Kw) x 6 at power plant area
  • Project for new compressor (Cameroon) at chemical plant area
  • Project for new grizzly/mini chipper at woodyard area with a WIKA contractor (ABB)
  • Paper manufacturing company.

Education

Elementary -

Bethlehem
01.1999

S1 - Electro

University of Darul Ulum Jombang
07-2011

Senior High School - undefined

SMK N1
01.2005

Junior High School - undefined

Bethlehem
01.2003

Skills

  • Microsoft Word
  • Excel
  • Autocad
  • SCADA
  • TURBINE
  • PLC
  • Reliance Electric
  • DCS
  • Lotus Note
  • MIMS
  • SAP
  • Client communication
  • Functional testing
  • Documentation review
  • Team development
  • Scheduling
  • Quality control
  • Equipment testing
  • Program implementation
  • Vendor coordination
  • Control systems
  • Instrumentation calibration
  • Electrical engineering
  • Site acceptance testing
  • Project controls
  • Safety review
  • Pre-commissioning activities
  • Commissioning procedures
  • Teamwork and collaboration
  • Adaptability and flexibility
  • Technical troubleshooting

Personal Information

  • Age: 38
  • Availability: November 01, 2023
  • Religion: Christian Protestant
  • Date of Birth: 1987-01-24
  • Gender: Male
  • Marital Status: Married

Apprenticeship

2004, Training Skill at PDAM, Bontang

Date Of Availability

2023-11-01

Hobby

  • Reading
  • Basketball
  • Music
  • Swimming

Languages

English
Intermediate (B1)

Timeline

Plant Service & Commissioning Engineer

Ammann Singapore
10.2024 - Current

Electrical Supervisor & Central Control Room Supervisor

PT.Ganda Alam Makmur Coal Mining
06.2017 - 10.2024

Technical Supervisor (Steam Turbine Generator)

PT.OKI Pulp & Paper
12.2014 - 02.2017

Electrical Power Generating Engineer

PT.Oki Pulp and Paper mills/SinarMas
01.2014 - 01.2015

Instrument Technician

PT.DEN
01.2014 - 03.2014

Electrical Supervisor

PT.Kertas Nusantara
11.2010 - 11.2014

Electrical Technician

PT.Kiani Kertas
05.2007 - 05.2010

Senior High School - undefined

SMK N1

Junior High School - undefined

Bethlehem

Elementary -

Bethlehem

S1 - Electro

University of Darul Ulum Jombang
Santos Erwin Manurung