Summary
Overview
Work History
Education
Skills
Personal Information
Hobbies and Interests
Timeline
Generic

Perumal Sakthivel

Tirupattur

Summary

Intend to build a career with leading corporate of hi-tech environment with committed & dedicated people, which will help me to explore myself fully and realize my potential. Willing to work as a key player in challenging & creative environment

Overview

11
11
years of professional experience

Work History

Assistant Project Engineer

SANLI M&E Pte Ltd
01.2019
  • Clients: Public Utility Board Singapore (PUB)
  • Project Name: PUB (Kranji Water Reclamation plant)
  • Assists in planning and developing engineering design projects
  • Prepares engineering plans, follows specifications troubleshoots design problems; may assist with environmental reviews for projects
  • Preparing reports as required
  • Levelling and surveying the site
  • Attending regular meetings to keep them informed of progress
  • Inspection of site work activities at construction
  • Ensure work progress are in accordance with the schedule
  • Ensure achievement of high safety and quality standards for site construction activities
  • Monitor and coordinate works for foreman and subcontractors
  • Monitor equipment, material activity and manpower progress on site
  • Assist to manage to coordinate with sub-contractors and suppliers
  • Coordinate with RTO, RE & consultant PM for site inspection
  • Monitoring all activity as per MOM safety regulations

Utility coordinator

Lucky Joint Construction Pte Ltd
06.2021 - Current
  • Clients: LTA MRT Project North-South corridor N101 to N115, Jurong J109 & J112
  • T302 to T312 [Island-wide SPTEL Diversion], CR106, CR107 to CR117
  • Project Name: SPTEL Term contract (LTA Major Diversion Projects) & SPTel Symphony & BAU Projects
  • When we received diversion request from developer or contractor arrange site meeting to identify the affected section and confirm the services
  • Responsible for planning and technical co-ordination of SPTEL services installation work
  • Planning, scheduling, and managing of all aspect of utilities coordination works for MRT station and tunnel
  • Prepare a quotation for the entire SPTEL diversion cost in accordance with the proposed diversion corridor
  • Coordinate with authorities, consultants, and project site operation team to facilitate installation
  • Ensure work progress are in accordance with the schedule
  • Ensure achievement of high safety and quality standards for site construction activities
  • Chair and lead coordination meeting with relevant agency to get approval NCE to do trial trench works for locating existing utility and submit it for final approval
  • Manage & Monitor progress, quality of workmanship and compliance with authority requirements
  • To get an approval for water, drainage, and other major utilities diversion
  • Able to propose circuit and line utility agency (SPTEL telecom)

Utility coordinator

Lucky Joint Construction Pte Ltd
01.2021 - Current
  • Clients: LTA MRT Projects - Jurong J112 & C821 (Hougang Ave 3)
  • Project Name: M1 & XIG Projects (LTA Major Diversion Projects)
  • When we received diversion request from developer or contractor arrange site meeting to identify the affected section and confirm the services
  • Responsible for planning and technical co-ordination of M1 & XIG services installation work
  • Planning, scheduling, and managing of all aspect of utilities coordination works for MRT station and tunnel
  • Prepare a quotation for the entire M1 & XIG diversion cost in accordance with the proposed diversion corridor
  • Coordinate with authorities, consultants, and project site operation team to facilitate installation
  • Ensure work progress are in accordance with the schedule
  • Ensure achievement of high safety and quality standards for site construction activities
  • Chair and lead coordination meeting with relevant agency to get approval NCE to do trial trench works for locating existing utility and submit it for final approval
  • Manage & Monitor progress, quality of workmanship and compliance with authority requirements
  • To get an approval for water, drainage, and other major utilities diversion

Utility coordinator

MO GUAN CONSTRUCTION ENGINEERING Pte Ltd
10.2020 - 06.2021
  • Project Name: SPPG Power Grid works
  • When we received the scheme from SPPG officer arrange site meeting to identify the affected section and confirm the services
  • Responsible for planning and technical co-ordination of SPPG services installation work
  • Planning, scheduling, and managing of all aspect of utilities coordination works for MRT station and tunnel
  • Coordinate with authorities, consultants, and project site operation team to facilitate installation
  • Ensure work progress are in accordance with the schedule
  • Ensure achievement of high safety and quality standards for site construction activities
  • Chair and lead coordination meeting with relevant agency to get approval NCE to do trial trench works for locating existing utility and submit it for final approval
  • Manage & Monitor progress, quality of workmanship and compliance with authority requirements
  • To get an approval for water, drainage, and other major utilities diversion
  • Planning the cable draw pits for SPPG cable pulling
  • To prepare the Join pit for SPPG cable jointing

Utility coordinator

MO GUAN CONSTRUCTION ENGINEERING Pte Ltd
10.2019 - 06.2021
  • Project Name: STARHUB Term contract
  • Assist with coordinating the Technical review and approval for telecom project plans prior to implementation is accomplished prior to starting jobs
  • When we received the scheme request from developer or contractor arrange site meeting to identify the affected section and confirm the services
  • Responsible for planning and technical co-ordination of Starhub services installation work
  • Planning, scheduling, and managing of all aspect of utilities coordination works for MRT station and tunnel
  • Prepare a quotation for the entire Starhub diversion cost in accordance with the proposed corridor
  • Coordinate with authorities, consultants, and project site operation team to facilitate installation
  • Monitor and coordinate the work in progress on site
  • Prepare a quotation for the entire Starhub projects cost in accordance with the proposed route
  • Coordinate with authorities, consultants, and project site operation team to facilitate installation
  • Ensure work progress are in accordance with the schedule
  • Ensure achievement of high safety and quality standards for site construction activities
  • Chair and lead coordination meeting with relevant agency to get approval NCE to do trial trench works for locating existing utility and submit it for final approval
  • Manage & Monitor progress, quality of workmanship and compliance with authority requirements
  • To get an approval for water, drainage, and other major utilities diversion

Project Site Engineer

SANLI M&E Pte Ltd
01.2018 - 01.2019
  • Clients: Public Utility Board Singapore (PUB)
  • Project Name: PUB (Ulu Pandan Water Reclamation plant)
  • Inspection of site work activities at construction
  • Ensure work progress are in accordance with the schedule
  • Report defects or non-conformances to construction or project management
  • Monitor equipment, material activity and manpower progress on site
  • Assist to manage to coordinate with sub-contractors and suppliers
  • Coordinate with RTO, RE & consultant PM for site inspection
  • Monitoring all activity as per MOM safety regulations

Site Engineer

SOON HENG SPRINKLER SERVICE Pte Ltd
05.2013 - 04.2014
  • Clients: Active Fire Protection Systems Pte Ltd
  • Project Name: Jurong Westgate
  • Inspection of site work activities at construction
  • Ensure work progress are in accordance with the schedule
  • Report defects or non-conformances to construction or project management
  • Monitor equipment, material activity and manpower progress on site
  • Assist to manage to coordinate with sub-contractors and suppliers
  • Coordinate with RTO, RE & consultant PM for site inspection
  • Monitoring all activity as per MOM safety regulations

Education

MBA - May 2012

Annamalai University

M.Com - April 2010

Sacred Heart College

B.Com - April 2008

Sacred Heart College

HSC (Higher Secondary School) - March 2004

Government Higher Secondary School

SSLC - March 2002

Government Higher Secondary School

RES - Registered Earth Work Supervisor

SCAL Academy Pte Ltd
Singapore

PCM Course - Certificate In Pavement Construction & Maintenance

BCA Academy
Singapore
08.2023

TCDW Course - Telecommunication Cable Detection Work Course

Cambrian Academy
Singapore
08.2021

PSM Course - Project Safety Management

Singapore Institute of Power & Gas
09.2020

WSH Coordinator - WSQ Advance certificate (LEVEL-B) - Advance Certificate In Workplace Safety And Health

Green safe International PTE.LTD
01.2019

MWAHC Course - Managing Work-At-Height-Course

Avanta Global Pte Ltd
Singapore
06.2018

BCSS Course - Building Construction Supervisor Safety Course

AA International Consultancy Pte Ltd
Singapore
08.2013

Skills

  • Microsoft Office (Word, Excel, PowerPoint)
  • Open Office
  • Auto Cad 2010
  • Tally 72
  • Comprehensive problem-solving abilities
  • Willingness to learn new challenges
  • Determination in work to succeed and achieve goals
  • Ability to react to emergencies with calm and efficiency
  • Ability to endure work pressure and maintain self-confidence
  • Positive thinking and open communication
  • Fast learning
  • Commitment and ability to work under pressure
  • Good team player

Personal Information

  • Passport Number: V6142804
  • Date of Birth: 30/05/1986
  • Gender: Male
  • Nationality: Indian
  • Marital Status: Married

Hobbies and Interests

  • Reading books
  • Playing cricket
  • Listening to music
  • Learning about new

Timeline

Utility coordinator

Lucky Joint Construction Pte Ltd
06.2021 - Current

Utility coordinator

Lucky Joint Construction Pte Ltd
01.2021 - Current

Utility coordinator

MO GUAN CONSTRUCTION ENGINEERING Pte Ltd
10.2020 - 06.2021

Utility coordinator

MO GUAN CONSTRUCTION ENGINEERING Pte Ltd
10.2019 - 06.2021

Assistant Project Engineer

SANLI M&E Pte Ltd
01.2019

Project Site Engineer

SANLI M&E Pte Ltd
01.2018 - 01.2019

Site Engineer

SOON HENG SPRINKLER SERVICE Pte Ltd
05.2013 - 04.2014

MBA - May 2012

Annamalai University

M.Com - April 2010

Sacred Heart College

B.Com - April 2008

Sacred Heart College

HSC (Higher Secondary School) - March 2004

Government Higher Secondary School

SSLC - March 2002

Government Higher Secondary School

RES - Registered Earth Work Supervisor

SCAL Academy Pte Ltd

PCM Course - Certificate In Pavement Construction & Maintenance

BCA Academy

TCDW Course - Telecommunication Cable Detection Work Course

Cambrian Academy

PSM Course - Project Safety Management

Singapore Institute of Power & Gas

WSH Coordinator - WSQ Advance certificate (LEVEL-B) - Advance Certificate In Workplace Safety And Health

Green safe International PTE.LTD

MWAHC Course - Managing Work-At-Height-Course

Avanta Global Pte Ltd

BCSS Course - Building Construction Supervisor Safety Course

AA International Consultancy Pte Ltd
Perumal Sakthivel