BusinessDevelopmentManager
S.A. Dinesh Raja

S.A. Dinesh Raja

Project Engineer /BIM Modellor /Drafter
Bulim square

Summary

A Civil Engineer having nearly ten years of experience in building modelling, Site execution, drafting and consulting Services. Looking for challenging position to employee engineering concepts, critical thinking, techniques and knowledge to succeed which can directly contribute to the organization growth, profit and to personal growth.

Overview

10
10
years of professional experience
6
6
years of post-secondary education
3
3
Certifications

Work History

Project Engineer

China State Construction Engineering Corporation LTD
05.2023 - Current
  • Project engineer for Jurong Innovation District located in the west of Singapore
  • Provided technical expertise throughout all phases of the project, ensuring accurate execution of designs and specifications.
  • Maintained records for each project and engineering discipline.
  • Monitored installation of materials and equipment for compliance with drawings and specifications.
  • Completed construction tasks while providing safe working conditions, staying on budget and meeting project deadlines.
  • Reduced project timelines with proactive planning and close monitoring of progress.
  • Identified technical risks within managed projects.
  • Ensured quality control for all aspects of the project, reducing defects and rework.
  • Coordinated cross-functional teams, fostering collaboration to achieve project goals.
  • Determined and scheduled priorities as required to progress engineering work.
  • Developed detailed project plans to ensure timely completion and deliverables were met.
  • Recommended improvements for design, construction means and materials based on field or changing conditions.
  • Facilitated training sessions for project team members, boosting their skills and performance.

Site Engineer

SDK Consortium Singapore
06.2019 - 05.2023
  • Site engineer for Woodlands Health Campus (WHC) project in Woodlands Avenue 1
  • Checked technical designs and drawings for adherence to standards.
  • Coordinated with subcontractors ensuring their work met project specifications as well as monitored their progress towards completion deadlines.
  • Managed on-site resources effectively, including personnel allocation, equipment utilization, and material storage to ensure smooth project progression with minimal downtime.
  • Created work schedules and adjusted as needed to meet project deadlines and keep shifts properly staffed.
  • Reduced material waste through accurate estimation, procurement, and usage tracking of required resources.
  • Recorded daily events and activities in site diary to evaluate process and improve productivity.
  • Delivered projects on time and within budget constraints by effectively managing resources, schedules, and risks.
  • Oversaw quality control and health and safety matters for construction teams.
  • Improved client satisfaction by providing regular updates and swiftly addressing any concerns or issues.

BIM Modeler/AutoCAD Drafter

RAMO Industries Singapore
09.2018 - 06.2019
  • Site engineer for Expansion of COIM Industrial Plant project in Juroung Island, Kalang football Hub, JTC 81, Exon Mobile, Tampanies HDB project site execution and modelling
  • Facilitated efficient coordination meetings with project teams using live BIM models as visual aid, enabling real-time issue resolution and decision making.
  • Elevated overall project quality through rigorous quality control measures, identifying discrepancies in model information and coordinating revisions with relevant stakeholders.
  • Enhanced project efficiency by streamlining BIM processes and workflows to improve collaboration among team members.
  • Increased cost savings for clients by conducting clash detection analysis and resolving conflicts before construction commenced.
  • Reduced errors in construction documents by meticulously reviewing and coordinating BIM models with architectural, structural, and MEP disciplines.

Education

B.E Civil Engineering - Civil Engineering

Einstein College of Engineering (Anna University Chennai)
Tirunelveli Tamil Nadu
09.2010 - 06.2014

Higher secondary -

Pushpalatha Hr.sec School
Tirunelveli Tamil Nadu
05.2009 - 05.2010

SSLC -

Everwin Hr.sec School
Chennai
06.2007 - 05.2008

Skills

AutoCAD

undefined

Certification

Autodesk certified User for REVIT 2016 and AUTOCAD 2016

Roles And Responsibilities

  • Details and types of structural works supervised and degree of responsibilities in each project
  • 1) SDK Consortium (11-09-2019 to 14-05-2023)
  • Proposed development of 6 blocks of 7-storey Health Campus comprising acute hospital, Specialist Outpatient Clinics, Community hospital, nursing home and 4 basement levels with 2 levels for car parking at Woodlands drive 17 Singapore.
  • Excavation, backfilling
  • Solely in charge of backfilling of more than 10,000 m3 of LSS and G20 concrete.
  • Monitoring excavation and slope stability as Woodlands Health Campus is a top-down construction project.
  • Raft foundation work sequence
  • Preparing ground for lean concrete dewatering ground surface. Subsequent laying lean concrete-based surveyor level.
  • Supervision for hacking of SB piles for starter bars after laying of lean concrete.
  • Supervise application of waterproofing membrane and arranging inspections with RTO.
  • Grouting of pile head for raft foundation.
  • Adhering to rebar details for raft foundation. After completion of bottom rebar installation, arranging for RTO inspection.
  • Welding of rebar to kingpost followed by MPI test inspected by RTO.
  • Connecting bottom rebar with SBP pile. For any missing starter bar, arrange for drilling of rebar by chipping of 50mm of SBP top surface so that rebar is exposed.
  • Planting of rebar based on rebar depth specification highlighted in design requirement. Checking of planting depth with RTO before using approved material for rebar planting.
  • Arranging for pullout test under RTO supervision.
  • Rectifying RTO comments before top rebar inspection.
  • Installation of additional rebar, starter bars for column, beam, core wall, staircase, ramp, plinth, skin wall and retaining wall.
  • Arranging for Carpentry works for drops and sump pit.
  • Arranging cleaning of rebar using water and air compressor.
  • Ensuring documentations such as COS, M&E clearance and other necessary documents are available prior to casting.
  • Arrange final inspection prior to casting. Casting is based on concrete grade specified in drawing.
  • Waterproofing high-grade concrete is used for raft foundation. Slump consistency and concrete quality are essential and are monitored and reported to on a regular basis during casting.
  • Concrete is cast based on approved CJ. Poker vibrator is used to vibrate concrete to obtain smooth finish, avoid honey combs and to get high strength for structure.
  • After completion of casting, curing compound application is necessary to facilitate curing.
  • Vertical Elements Construction
  • For vertical elements such as column, core wall and staircase wall, CJ is roughened. Surveyor marking is essential for accuracy and then inspected by RTO.
  • Rebar works are carried out for vertical elements in accordance to approved drawing. Trimmer bars are installed for openings. For columns, center line is marked and rebar are tied based on surveyor marking.
  • After rebar inspection, the vertical structure formwork is permitted to close.
  • After formwork is closed, cover and vertical accuracy are checked by RTO. COS, checklist and M&E clearance are attached as part of the documentation.
  • Casting is then carried out to approved level with specified high-grade concrete.
  • Slab Construction
  • Casting of slab includes marking of CJ level. Column and structural wall CJ are roughened.
  • Slab form work is based on approved CJ plan. Bottom bars are laid based on CJ location. M&E openings and floor openings are marked and trimmer bars are allowed for. Pipe sleeves are checked against Concrete Body Plan (CBP).
  • Once bottom bar lying is completed, RTO inspection is arranged. Once completed and all comments are rectified, top bar is laid.
  • After laying of top bars, additional bars, starter bars for column walls, plinth are provided. Levelling pegs are installed based on surveyor level marking.
  • Arranging final inspection and ensuring all documents such as M&E clearance, Architecture clearance, checklist and COS are available prior to casting.
  • Construction of nonstructural wall, plinth is supervised
  • Circular ramp, linear ramp construction is supervised.
  • Precast elements
  • Installation of Precast elements like column wall beam is proceeded with checking of survey level, CJ roughening, checking of shop drawing of precast element. Starter bar of precast element should be verified. The starter bar from the slab should be cleaned before installation.
  • After installation grouting tubes are grouted with Non-Shrink Grouting Cement as per approved MOS. Grouting is monitored by RTO and all are recorded for documents
  • Grouting of column head wall head are supervised.
  • Post tension
  • Post tensioned beams, Slabs are monitored and followed in site as per approved drawing.
  • Tendons are laid based on approved shop drawing measurements. Tendon heads are checked additional rebar are laid. Then proceeded for casting with high grade concrete.
  • After obtaining calculated concrete grade strength stressing is proceeded. Stressing of tendons are based on calculation and thickness of tendons. After verifying elongation tendons are permitted by RTO for grouting.
  • Grouting is carried out after flushing of air in grouting tubes.
  • Coring hacking, Slab cutting, manual hacking and trimming
  • Coring for M&E and Archie opening is marked and cored
  • Cutting of temporary slab, hacking of temporary slab, trimming of slab edges are supervised.
  • Temporary King post cutting is supervised
  • Temporary struts removal is monitored and supervised.
  • Hacking of Retaining wall is monitored.
  • Rock Blasting and Rock splitting
  • Supervised more than thirty rock blasting in safe manner.
  • Rock splitting for excavation of trench in basement.
  • Architectural works
  • Setting out dry wall, ALC wall, Thermal wall
  • Installation of metal door frames and door panels
  • Screeding, plastering, skim coat works are checked onsite
  • Coordinating with client, consultant and contractor for progress.
  • Installation of K4 Bollards
  • Installation of window, Cavity wall door frame and panel
  • Tile setting out, Tile works are monitored and executed.
  • Tile works for cluster toilet single toilet works are coordinated
  • False ceiling setting out coordination and managing works were carried out.
  • 2). CSCEC China State Construction Engineering Corporation Limited (15/05/2023 to current)
  • Jurong Innovation District factory 4 blocks with 7 storey and two basements.
  • Pile monitoring
  • Monitoring precast driven concrete pile, monitoring level and coordinates of pile
  • Hacking of pile head for starter bar connection with raft foundation
  • Surface preparation for lean concreting and application of waterproofing membrane for raft foundation
  • Preparing and monitoring bottom rebar connection with driven pile main rebar for RTO inspection.
  • Provision of starter bars for column, beams, core walls and sump pit.
  • Preparing and monitoring top bars additional bars for RTO inspection.
  • Preparing and monitoring level pegs and drop levels for sump pit formwork with required cover.
  • Checking and adding (if missing) trimmer bars for M&E and pipe openings for clearance application.
  • Cleaning and washing of rebar by air compressor and water prior to casting.
  • Ensuring Certificate of Supervision (COS) for formwork prior to casting.
  • Casting of slab
  • Ensuring concrete grade complies with design specification for casting. Monitoring slump and consistency of concrete.
  • Supervision for casting via pump car, concrete bucket and crane depending on access, construction joint location and concrete quantity.
  • Ensure work is carried out safety at all times. Checking of necessary permits of equipment and workforce documents.
  • Vertical elements
  • Checking verticality of elements such as CIS & precast Column and Wall. Inspecting main rebar, starter rebar & M&E services together with RTO.
  • Supervised construction of Staircase, Ramp, nonstructural wall and core wall.
  • Construction of slab in accordance with approved drawing.
  • Checking of shaft openings and installing starter bars in accordance to drawing.
  • Structural clearance
  • Clearing and removing of formworks for structural clearance application.
  • Hacking and trimming of edges for smooth finishes.
  • Handing over to M&E team for pipe conduit and other services to proceed.
  • Excavation and soil stability
  • Excavating of trench for M&E pipe services.
  • Following ERSS system drawing to maintain slope stability. Laying of lean concrete on slope surfaces.
  • Application of water proofing membrane for trench.
  • Marking of trench level and gradient.
  • Supervision of rebar works for trench based on approved drawing. Carrying out rebar inspection with RTO to adhere to BCA standards.
  • Preparing formwork for trench, checking level and verticality of formwork. Obtaining COS and M&E clearance prior to casting.

Personal Qualifications

  • B.E Civil Engineering, Einstein college of Engineering (Anna University Chennai), 2014, 6.9 CGPA
  • Higher secondary, Pushpalatha Hr.sec School, 2010, 75%
  • SSLC, Everwin Hr.sec School, 2008, 75%

Currentcompany

China State Construction Engineering Corporation LTD Singapore

Currentlocation

Bulim square, Singapore

Highestdegree

UG (B.E- Civil Engineering)

Dateofjoining

1-month notice period

Personal Information

  • Total Experience: 10 years
  • Passport Number: T6710480
  • Date of Birth: 06/19/1993
  • Gender: Male
  • Marital Status: Married

Reasonforleaving

Looking for career growth and challenging work

Projects

Expansion of COIM industrial plant, Juroung Island, Singapore, AutoCAD, Revit Architecture, 18.5 million SGD, 13 Months, To obtain drawings from consultant, prepare construction drawing and execute in site, attend consultant meetings, coordinating with Sub-Contractor. Earthwork at Tampanies North phase 3B HDB Street 61 & Street 62, Tampanies, Singapore, AutoCAD, Revit Architecture, 8 million SGD, 12 Months, To prepare and estimate the total volume of soil excavated and to be refilled in site. Levelling the site as per HDB drawings. Exon Mobile Crude Storage Expansion, Exon mobile, Juroung Island, Singapore, AutoCAD, Revit Architecture, 11 million SGD, 6 Months, To prepare and estimate the total volume of soil excavated and to be refilled in site. Levelling the site as per HDB drawings. Preparing documents for claim. Kallang Football Stadium, Kallang, Singapore, AutoCAD, Revit Architecture, 16 million SGD, 11 Months, To prepare shop drawings and execute in site as per BCA regulation. Preparing shop drawings and as-built drawings for client submission. Woodlands Health Campus Project (Top- down construction method), Woodlands, Singapore, AutoCAD, Revit, Finalcad, BIM 360, 1 billion SGD, Till 2023 Nov, To execute in site as per BCA regulation. Preparing for inspection forms, making inspection and managing works structural and architecture works, Coordinating works with Sub-contractor and contract team. Maintain time line with project schedule. China State Construction Engineering Corporation LTD Singapore, Bulim square, Singapore, AutoCAD, Revit, BIM 360, 570 million SGD, current, To execute in site as per BCA regulation. Preparing for inspection forms, making inspection and managing works structural and architecture works, Coordinating works with Sub-contractor and contract team. Maintain time line with project schedule.

Software

REVIT ARCHITECTURE

REVIT STRUCTURE

AUTOCAD

Staad Pro

Languages

English
Upper intermediate (B2)
Tamil
Advanced (C1)

Timeline

Project Engineer

China State Construction Engineering Corporation LTD
05.2023 - Current

Site Engineer

SDK Consortium Singapore
06.2019 - 05.2023

BIM Modeler/AutoCAD Drafter

RAMO Industries Singapore
09.2018 - 06.2019

B.E Civil Engineering - Civil Engineering

Einstein College of Engineering (Anna University Chennai)
09.2010 - 06.2014

Higher secondary -

Pushpalatha Hr.sec School
05.2009 - 05.2010

SSLC -

Everwin Hr.sec School
06.2007 - 05.2008
Autodesk certified User for REVIT 2016 and AUTOCAD 2016
WSQ – Supervise construction work for WSH (BCSS)
WSQ-Manage work at height

Disclaimer

I hereby declare that the above information is true to my knowledge and brief.
S.A. Dinesh RajaProject Engineer /BIM Modellor /Drafter