Summary
Overview
Work History
Education
Skills
Certification
Current Status
Present Address
Personal Information
Countries Travelled
Languages
Timeline
Generic

R. G. Anil Kumar

Singapore

Summary

With 20+ years of experience in process, project management, and estimation, I have held roles such as Estimation Engineer, Manufacturing Engineer, Business Development Manager, and currently serve as the Operation Director. Throughout my career, I have consistently been recognized for my commitment to performance excellence and contributions to the success of organizations in the oil & gas and other industries. My strengths lie in leadership and time management, leading to my current company assigning me the additional responsibility of serving as the Management Representative (MR) for ISO Audits.

Overview

26
26
years of professional experience
1
1
Certification

Work History

Operation Director / Management Representative

Meisei International Pte Ltd
04.2012 - Current
  • Evaluation of insulation and refractory requirements for piping and equipment, including the material take-off (MTO) based on the supplied piping isometric and tanks/vessels/equipment drawings, in conjunction with project planning, budgeting, and execution
  • Based on the client's Instruction to Bidder (ITB) documents, conduct a thorough review of the project specifications and the relevant piping and equipment drawings
  • Prepare the Bill of Quantity (BOQ), which should include details such as type, insulation class, pipe size, necessary insulation thickness, specified insulation materials (Hot/Cold/Acoustic), weatherproofing materials, and any required ancillary materials
  • Identify the volume of Hot/Cold/Acoustic Insulation materials needed, the quantity of weatherproofing materials required (including both Metallic and Non-Metallic options), and the quantity of ancillary materials that will support the project
  • Request quotations from the vendors providing the materials
  • Compile a quotation for the supply, installation, and supervision of insulation and refractory materials, accompanied by relevant documentation
  • Submit the quotation, along with all relevant supporting documents to client on or before the requested date, following a thorough review and approval by the Management team
  • Review any Engineering Change Order (ECO) issued by the client, which include updates to drawings or specifications
  • Prepare the comprehensive project budget, including the supplementary cost intended for contingency measures
  • Attend the Project meeting and discuss about all the backlogs if any, improvements, schedules etc
  • Supervising and managing staff from different departments to ensure seamless collaboration and coordination
  • Reviewing the efficiency of current business practices and applying changes to enhance productivity levels
  • Coordinating the procurement process and making certain that services and products are delivered without delay
  • Analyzing financial data to facilitate informed decision-making and improve profitability
  • Conduct internal ISO audits (9001 and 45001) and submit audit reports to external auditors
  • Clients: Shell, Exxon Mobil, Chevron, Foster Wheeler, JGC, MES, Chiyoda, SRC, PCS etc..
  • Software/tools used: MS Office (Mainly Excel), Auto Desk (AutoCAD)

Senior Engineer

FSM Technologies
04.2011 - 01.2012
  • Worked as Senior Engineer, Operations/Process related to the sheet metal manufacturing, Precision Machining & Clean room products
  • Improve machine setup and running cycle time
  • Support for preparation of necessary Jigs & Fixtures for Assembly, Machining, and Welding etc
  • Support Operations & Planning
  • Implemented 5S concept and its importance
  • Conduct “Awareness Meeting” once in a week
  • Adequate job allocation in every department to ensure the optimal use of the full capacity of the Laser and CNC machines
  • Chair the operations meeting with all department supervisors
  • Preparing the job scope for upcoming months and submit the report to Managing Director
  • Supporting FSM overseas facility
  • Support customer audits
  • Achievements: A clean and a proper disciplined working environment by implementing 5S concepts in all operations areas
  • Improved cycle time in all departments
  • Changed the current planning method by implementing new, which helps to increase productivity
  • The existing factory layout has been modified to a better one
  • Implement a system to calculate the actual usage and hence minimized the wastage of paint and powder

Senior Engineer

Encus International Pte Ltd
04.2008 - 12.2010
  • Worked as Senior Engineer, NPI/Process related to the sheet metal manufacturing of ATM, Vending Machines, and Medical products
  • Study the drawings from our customer for new projects
  • Prepare Design for manufacturing (DFM); focusing on the cost saving by doing Design for costing (DFC) in different process levels
  • Send the DFM to client for approval and finalize the product design
  • Prepare the Bill of Materials (BOM) for the project
  • Prepare the time line for the First Article (FA) submission including the CAD/CAM readiness, planning etc
  • Of the new project using Gantt Chart
  • Activate the new project and pass the relevant information to the people related to it
  • Commit the date for FA submission to customer
  • Follow up the progress of the proto type until finished good level
  • Submit the internal FA for approval
  • Discuss with the team, if there are any discrepancies in the report and discuss with the team to resolve it
  • Get the complete FA report and the sample and submit to customer on the planned date
  • Follow up with customer for the FA approval
  • Discuss with customer for any changes in the prototype
  • Get the FA approval report from customer and log in to the system through the document control
  • Activate the special build as per customer request and send to customer
  • Hand over the project to operation department including all the supporting documents
  • Activate the meet for Engineering Change Order (ECO), if there is anything from customer for the current or new projects and update the BOM accordingly
  • Clients: Wincor Nixdorf (ATM, Kiosk etc.), Venture (medical products), Red back (Electronics components), D&K (Printers) etc

Project Engineer

Altum Precision SDN BHD
02.2006 - 04.2008
  • Worked as Project Engineer, NPI in the hard disk base plate manufacturing industry
  • Study the base plate drawings and conduct the Process Planning along with Design for Manufacturing (DFM)
  • Identify the inaccuracies in the new casted product and discuss in the daily project meet
  • 100% follow up of the components
  • Understanding the Machine process flow in casting, machining (FANUC) etc
  • Failure Modes Effects & Analysis (FMEA), Design FMEA etc
  • Conference call with clients to discuss the design features of components (WD & Seagate)
  • Prepare the quotation for the NPI molds and base plates and submit to client
  • Initiate the project internally by logging in the completed base prints and establishing a schedule for the submission of the First Article and Small Built Request (SBR) lot
  • Plan and prepare the schedules for the delivery of base plates and send to customer
  • Prepare the improvement plan in daily basis and report to clients
  • Attend the Quarterly Business Review (QBR) meeting at the client's site and provide presentations that cover all relevant reports related to New Product Introductions (NPI), including quotations for parts and molds

Project Coordinator

Diethelm Keller Engineering Pte Ltd
03.2001 - 11.2005
  • Worked as CNC Programmer /Project coordinator in an Architecture and Aviation industry
  • Generating CNC Programs using Master Cam and Part programs for NC machines
  • Prepare the process sheet and the program schedule for the new project and discuss with the customers including the process flow in the machining, assembly etc
  • Finalize the drawings by engaging with the intermediary, ensuring that this section reaches a state of design stability
  • Process Planning, Preparing the Job sheets for the set of drawings
  • Software used: Auto CAD, Master Cam

Engineering Assistant

Vikram Sarabhai Space Center [Indian Space Research Organization]
07.1999 - 07.2000
  • Worked as Engineering Assistant at Rocket & Payload Fabrication Facility (RPFF), VSSC, ISRO
  • Participated in the Process planning of rocket and launch vehicle components
  • CNC Milling Setting/Programming fault diagnosis
  • Process improvements
  • Engaged in the Secondary Injection Thrust Vector Control (SITVC) project. SITVC is positioned in the first stage (S125 Stage) of the combustion chambers and is initiated by Strap-On Motors. The main purpose of this system is to improve the rocket's pitch and yaw control

Education

Diploma - Mechanical Engineering

Sree Narayana Polytechnic
Kerala
10-1998

Data Preparation & Computer Software -

School Of Engineering
Kerala
07-1994

Pre-University -

Sree Narayana College, Kerala University
Kerala
08-1992

Skills

  • Team leadership
  • Business development and planning
  • Sales and marketing
  • Operations
  • Process improvement
  • Sales tracking
  • Cost management

Certification

(1) ISO9001:2015 (IA-2346)


(2) ISO45001:2018 (LM/IA/5081)

Current Status

Singapore Permanent Residence (S7569271D), since June 2009

Present Address

Block 322, 08-220,

Jurong East Street 31,

Singapore 600322

Personal Information

  • Date of Birth: 03/29/75
  • Gender: Male
  • Nationality: Indian

Countries Travelled

  • Malaysia
  • USA
  • Canada
  • Hong Kong
  • Thailand
  • Indonesia
  • China

Languages

English
Advanced (C1)
Malayalam
Upper intermediate (B2)
Hindi
Intermediate (B1)
Tamil
Intermediate (B1)

Timeline

Operation Director / Management Representative

Meisei International Pte Ltd
04.2012 - Current

Senior Engineer

FSM Technologies
04.2011 - 01.2012

Senior Engineer

Encus International Pte Ltd
04.2008 - 12.2010

Project Engineer

Altum Precision SDN BHD
02.2006 - 04.2008

Project Coordinator

Diethelm Keller Engineering Pte Ltd
03.2001 - 11.2005

Engineering Assistant

Vikram Sarabhai Space Center [Indian Space Research Organization]
07.1999 - 07.2000

Diploma - Mechanical Engineering

Sree Narayana Polytechnic

Data Preparation & Computer Software -

School Of Engineering

Pre-University -

Sree Narayana College, Kerala University
R. G. Anil Kumar