Summary
Overview
Work History
Education
Skills
Additional Information
Timeline
Technician 2 (ALD Pulsar Tester & RFK Department)

Rahmat Sofian Bin Abdul Rajak

ASM Manufacturing Front End
13
years of professional experience

Accomplished Senior Technician at ASM Manufacturing Front End, renowned for leadership development and troubleshooting skills. Spearheaded initiatives enhancing operational efficiency and quality standards. Promoted for exceptional technical proficiency, mastering assembly and testing tasks, ensuring 100% adherence to procedures. Proven track record in mentoring, resource allocation, and strategic planning.

Experienced technical professional prepared for senior-level responsibilities. Capable of diagnosing and resolving complex technical issues with precision. Strong focus on team collaboration, ensuring seamless operations and optimal results. Reliable, adaptable, and skilled in troubleshooting, maintenance, and system optimization.

Work History

Senior Technician (ALD Pulsar Assembly Department)

1 Year 7 Months
ASM Manufacturing Front End | 04.2025 - Current
  • Assume full supervisory responsibilities for daily operations, including task allocation and workflow management across Feeder, Assembly, Test, and DQL departments in the supervisor's absence.
  • Mentor and train new team members on complex assembly procedures, ensuring adherence to quality standards and reducing onboarding time.
  • Lead departmental initiatives to develop and implement new policies and procedures, enhancing operational efficiency and standardizing best practices.
  • Proactively liaise with Planner, Quality, and Engineering teams to manage material issues, preventing work stoppages and maintaining production schedules.

Technician 2 (ALD Pulsar Tester & RFK Department)

4 Years 10 Months
ASM Manufacturing Front End | 01.2022 - Current
  • Promoted within 3 years for demonstrating exceptional technical proficiency and leadership qualities.
  • Performed rigorous device failure analysis and acceptance testing, ensuring 100% adherence to engineering procedures and final product quality.
  • Spearheaded the installation, configuration, and upgrading of hardware/software for critical manufacturing systems, minimizing downtime.
  • Excelled as a hybrid technician, mastering both assembly and testing tasks, providing vital flexibility to the production team.

Temporary Inspection Officer (Audit & Inspection)

1 Year 2 Months
Building and Construction Authority (BCA) | 10.2020 - 12.2021
  • Conducted comprehensive site inspections to verify strict compliance with SMM plans and COVID-19 safety measures.
  • Analyzed inspection data and prepared detailed reports for BCA management, supporting enforcement actions and regulatory intelligence.
  • Advised site representatives on compliance requirements, effectively identifying and documenting areas of non-compliance for corrective action.

Senior Planner

3 Years 9 Months
Varl Office Systems | 12.2016 - 09.2020
  • Led project planning initiatives, aligning resources with organizational goals and timelines.
  • Developed comprehensive strategies for resource allocation and budget management.
  • Mentored junior planners, fostering professional growth and knowledge sharing within the team.
  • Analyzed market trends to inform strategic decisions and enhance operational efficiency.

Technician Cum Tech Support (Laser Department)

7 Months
Kodi Engineering Services | 04.2016 - 11.2016
  • Operated and maintained machinery to ensure optimal performance and safety compliance.
  • Diagnosed technical issues promptly, implementing effective solutions to minimize downtime.
  • Collaborated with team members to streamline workflows and improve process efficiency.
  • Conducted routine inspections and preventive maintenance on equipment to enhance reliability.

Junior Planner

1 Year 11 Months
Varl Office Systems | 04.2014 - 03.2016
  • Collaborated with cross-functional teams to identify resource needs and optimize workflow efficiency.
  • Assisted in preparing detailed reports and presentations for senior sales management, enhancing decision-making processes.
  • Coordinated planning activities, ensuring alignment with organizational goals and strategic initiatives.
  • Generated detailed 3D drawings, layout plans, and quotations for office systems projects, ensuring designs met all client specifications.

Assistant Technical Engineer (HVAC Department)

1 Year 5 Months
Jurong Shipyard | 10.2012 - 03.2014
  • Developed and implemented technical solutions to improve system performance and reliability.
  • Collaborated with cross-functional teams to troubleshoot complex technical issues efficiently.
  • Conducted regular system audits to ensure compliance with industry standards and regulations.
  • Created and updated 2D and 3D models for HVAC ducting, performing clash detection to pre-empts conflicts with electrical and piping systems.
  • Conducted on-site surveys to gather accurate measurements and data for design development.

Education

- Managing Work-At-Height (MWAH)

S-Curve Academy Pte Ltd | 10-2017

- WSQ Advanced Certificate in WSH (Construction)

NTUC Learning Hub Pte Ltd | 09-2016

- Supervise Work in Confined Space Operation

NTUC Learning Hub Pte Ltd | 04-2016

- Building Construction Supervisors Safety

NTUC Learning Hub Pte Ltd | 11-2015

- Diploma in Mechanical Technology

Singapore Polytechnic | 09-2015

• GPA: 2.333

• Engineering Mechanics & Materials

• Engineering Drafting & Design

• Machining Technology

• Thermofluids Engineering

• Automation Technology

- Higher NITEC in Mechanical & Electrical Engineerin

ITE College Central (Tampines Campus) | 03-2010

• GPA: 3.288

- NITEC in Building Drafting (Architectural)

ITE College Central (Bedok Campus) | 12-2007

• GPA: 3.369

Skills

Leadership development
Troubleshooting skills
Software installation
Multitasking and organization
Budgeting and cost control
Equipment calibration
Critical thinking
Problem-solving
Operation Monitoring
Assembly and production

Additional Information

  • Nationality: Singaporean
  • Driving License: Class 2B, 2A, 2, 3
  • Languages: English (Fluent), Malay (Fluent) - verbal and written.
  • Availability: 1 month notice period.

Timeline

Senior Technician (ALD Pulsar Assembly Department)

ASM Manufacturing Front End
04.2025 - CurrentRead More

Technician 2 (ALD Pulsar Tester & RFK Department)

ASM Manufacturing Front End
01.2022 - CurrentRead More

Temporary Inspection Officer (Audit & Inspection)

Building and Construction Authority (BCA)
10.2020 - 12.2021Read More

Senior Planner

Varl Office Systems
12.2016 - 09.2020Read More

Technician Cum Tech Support (Laser Department)

Kodi Engineering Services
04.2016 - 11.2016Read More

Junior Planner

Varl Office Systems
04.2014 - 03.2016Read More

Assistant Technical Engineer (HVAC Department)

Jurong Shipyard
10.2012 - 03.2014Read More

S-Curve Academy Pte Ltd

from Managing Work-At-Height (MWAH)
Read More

NTUC Learning Hub Pte Ltd

from WSQ Advanced Certificate in WSH (Construction)
Read More

NTUC Learning Hub Pte Ltd

from Supervise Work in Confined Space Operation
Read More

NTUC Learning Hub Pte Ltd

from Building Construction Supervisors Safety
Read More

Singapore Polytechnic

from Diploma in Mechanical Technology
Read More

ITE College Central (Tampines Campus)

from Higher NITEC in Mechanical & Electrical Engineerin
Read More

ITE College Central (Bedok Campus)

from NITEC in Building Drafting (Architectural)
Read More
Rahmat Sofian Bin Abdul Rajak