Summary
Overview
Work History
Education
Skills
Certification
LANGUAGE SKILLS
Timeline
Generic
Pyae Phyo Zaw

Pyae Phyo Zaw

Singapore

Summary

Dedicated and results-driven engineer with a Diploma in Construction Engineering and over 10 years of experience in Quality Assurance and Quality Control. Proven ability to leverage technical knowledge and practical skills to enhance project outcomes and ensure compliance with industry standards. Committed to continuous improvement and delivering high-quality results that align with organizational goals. Eager to contribute expertise to drive success and innovation within a forward-thinking company.

Overview

14
14
years of professional experience
1
1
Certification

Work History

Supervisor

Siong Construction & Engineering Pte Ltd
Singapore
12.2024 - Current
  • Oversaw daily operations, ensuring adherence to safety protocols and project timelines.
  • Coordinated workflow among teams to maximize efficiency and productivity on-site.
  • Mentored junior staff, providing training in construction best practices and safety measures.
  • Implemented process improvements that enhanced project delivery and reduced delays.
  • Coordinate subcontractors to achieve effective production as per rolling schedule.
  • Prepare for pre-commencement site walk with clients and consultants.
  • Managed resource allocation, optimizing labor and materials for cost-effective project execution.
  • Conducted regular site inspections to ensure compliance with industry regulations and quality standards.
  • Resolved conflicts among team members promptly, maintaining a harmonious working environment conducive to productivity.
  • Planned, created, tested and deployed system life cycle methodology to produce high quality systems to meet and exceed customer expectations.

Project Manager Position

Myanmar Innovators 7 Co., Ltd
Yangon, Myanmar
05.2022 - 09.2024
  • Site survey & cost estimation
  • Preparation of quotation
  • Preparation of schedule
  • Preparation of Method Statement & ITP
  • Liaise with sub-contractors, clients and authorities
  • Materials arrangement
  • Subcontractors arrangement
  • Coordination among contractors
  • Design coordination
  • Materials submission
  • Cost control
  • Quality control
  • Handing over of work
  • Maintenance of respective trade as per contract

Senior Trade Engineer Position

Bouygues Construction Myanmar
Yangon, Myanmar
10.2020 - 02.2021
  • Assist document submission for method statements of architectural trades
  • Prepare for architectural trade demonstration / mock up inspections
  • Coordinate sub-contractors and main-contractors ‘teams for architectural work
  • Coordinate installation of AAC and CMU2 Block Walls
  • Coordinate waterproofing works
  • Coordinate epoxy floor installation
  • Monitor and prepare weekly report, monthly report
  • Leadership of a team including 5 engineers
  • Liaise with clients’ QC engineers to solve the site problems to achieve the target schedule and quality

QA / QC Manager

KST Group of Companies
Yangon, Myanmar
05.2018 - 10.2020
  • Upgrade the Project Quality Plan (PQP)
  • Implement Inspection Test Plan (ITP)
  • Implement checklists for civil and structural works
  • Review and upgrade Method Statements (MS)
  • Establish document control system for inspection records and test reports
  • Implement Quality Assurance for concrete
  • Implement Quality Assurance for reinforcement steel bars
  • Assist Project Manager for project coordination
  • Analyze the materials and specification
  • Negotiation with consultants and clients
  • Preparation of monthly report (Project wide)
  • Training of junior QA/QC team members
  • Project Achievement
  • Structural NCR - 90% cleared
  • Architectural Materials Submission – 70% completed
  • Method Statement Submission – 64% completed
  • Achieved clients’ quality standard by training and improving sub-contractors

QA / QC Engineer

Greatearth Construction Pte Ltd
Singapore
10.2014 - 10.2017
  • Structural
  • Concrete cube test report and analysis.
  • Rebar tensile test inspection and analysis.
  • Precast elements (void slabs, precast walls) inspection i.e. dowel bars and splice sleeves setting out, choke clearance and finishing quality.
  • Slab casting level control and rebar tie inspection followed by screed less floor inspection (structural ponding test and +/-3 mm level control).
  • Installation of precast walls inspection i.e. setting out, verticality and grout volume compliance.
  • Lift walls and staircase shelters rebar inspection and finishing concrete quality control.
  • Structural non-compliance defects rectification and conduct third party solutions to meet consultants satisfactory.
  • Architectural
  • JOE green panels installation i.e. setting out and dowel bars inspection including verticality and alignment.
  • Brick wall construction quality control.
  • Waterproofing ponding tests and leakage rectification.
  • Marble dry-lay inspection including tiles, granites, compressed marbles and terracotta sorting. Materials quality inspection including adhesives and workmanship setting up and implementation including documentation for submission to clients.
  • Timber floor materials quality control and workmanship control.
  • Door sub frame and main installation, submission to clients.
  • Preparation for BCA CONQUAS inspections and handing over to clients.
  • Inspection and monitoring for Quality of Concrete casting

QA/QC Engineer

Hyundai Construction & Engineering Pte Ltd
Singapore
04.2014 - 10.2014
  • Developed and implemented quality assurance protocols for construction projects.
  • Conducted thorough inspections to ensure compliance with industry standards and specifications.
  • Collaborated with cross-functional teams to identify and resolve quality issues effectively.
  • Led training sessions for junior engineers on QA/QC methodologies and best practices.
  • Monitor and control concrete cube test, rebar tensile test, rebar bend and re-bend test, coupler tensile test
  • Windsor probe test, UPV test for concrete cube failure
  • Structural NCR closure
  • Architectural NCR closure

Project Engineer

Protag Tetra Group
Singapore
12.2012 - 04.2014

o Project: Proposed A & A projects (December 2012 - June 2013)

o Office renovation projects (April 2013 – April 2014)

o Interior Fitting (May 2013 – February 2014)

o Calvin Klein Glass House Show (April 2014)

Assistant Engineer

HSL Constructor Pte Ltd
Singapore
02.2012 - 10.2012

o Samsung GMR Project as logistic engineer, Jurong Island (February 2012 – October 2012)

Education

Diploma - Construction Engineering

BCA Academy
Singapore

Skills

  • Microsoft Office (Excel, Word, Power Point, Project)
  • Auto CAD 2D
  • Digital Marketing
  • Microsoft Media (Photoshop, Flash)

Certification

  • ISO 9000 Internal Quality Audit
  • CONQUAS Training for Builders
  • Building Construction Supervisors Safety Course (BCSS)
  • Formwork Safety Course for Supervisors
  • Work-At-Height Course for Supervisors

LANGUAGE SKILLS

English (Fluent)
Myanmar (Native)

Timeline

Supervisor

Siong Construction & Engineering Pte Ltd
12.2024 - Current

Project Manager Position

Myanmar Innovators 7 Co., Ltd
05.2022 - 09.2024

Senior Trade Engineer Position

Bouygues Construction Myanmar
10.2020 - 02.2021

QA / QC Manager

KST Group of Companies
05.2018 - 10.2020

QA / QC Engineer

Greatearth Construction Pte Ltd
10.2014 - 10.2017

QA/QC Engineer

Hyundai Construction & Engineering Pte Ltd
04.2014 - 10.2014

Project Engineer

Protag Tetra Group
12.2012 - 04.2014

Assistant Engineer

HSL Constructor Pte Ltd
02.2012 - 10.2012

Diploma - Construction Engineering

BCA Academy
Pyae Phyo Zaw