BusinessAnalyst
P Veeramanikandan

P Veeramanikandan

Electrical & Instrumentation Engineer

Summary

Dynamic E&I Maintenance, Project & Commissioning professionals with over 15 years of progressive work experience in large size organizations expertise in Maintenance and Project handling with excellent analytical, problem finding, problem solving, Testing, commissioning and management skills, possess track record of achievements; achieved on the base of total work commitment.

Overview

15
15

Electrical & Instrumentation Project and Maintenance Engineer

Work History

Electrical & Instrumentation Engineer

Airliquide Singapore Pte Ltd
07.2021 - Current
  • Preparing of the PM schedule for the plant electrical panel, Control panel, Motors, Preparation of the Calibration & verification Schedules for the plant instruments
  • Executing quarterly, half yearly, yearly PM for all equipment based on the schedule
  • Execute the instrument calibration with 3rd party and in-house verification based on the schedule
  • Attending corrective maintenance: finding problems, troubleshooting and reducing down time
  • Field Electrical panels and Motors daily monitoring and doing predictive maintenance Engaging contractors to execute the major installation and Equipment service contract
  • Preparing Preventive Maintenance, Predictive Maintenance, Corrective Maintenance testing documents and Keeping records for audit purpose
  • Siemens PLC troubleshooting and minor modification in the program PLC program Upload and downloading HMI graphics download into new HMI while replacing Inventory stock management (buying, storing, record keeping, withdrawal, replenish, maintaining records) Attending inventory stock auditing.

Electrical & Instrumentation Engineer

Solvay Specialty Chemicals Pte Ltd
07.2019 - 06.2021
  • Preparing and Execution of the PM schedule for E&I scopes: Managing and Executing annual/half yearly Servicing of Electrical panel, Transformers, VFD’s, Motor Starter Panel, Marshalling panel, PLC panel, Air compressor and LCS
  • Servicing / onsite checking of Motors, Field Heater’s Winding/cable insulation test
  • Cathodic Protection Panel condition checking (engaging vendors and testing with them based on the PM schedule)
  • Scheduled Calibration for all the plant instruments like Control Valves, Pressure Transmitters, Level Transmitters, Flow Transmitters, Temperature Transmitters, Pressure gauges
  • Arranging vendors to execute plant Gas detector calibration based on the PM Schedule for quarterly and working with them
  • Arranging vendor to execute Weighing scale calibration for quarterly and monitoring job
  • Arranging vendor to execute service for Chiller and Aircons for quarterly and monitor job Pressure test, Stroke test for on/off, Control valves after troubleshooting or installation
  • Testing and service of Diaphragm Pumps by using in-house workers
  • Preparing and Execution of Shutdown maintenance & Projects: Scope of documents, Markup P&ID, cable schedule, reference ISOMETRIC drawing with markup, Pipe schedule, valve specifications and call contractor for Site survey
  • Clearing doubts to contractors and revise the scopes if necessary
  • Getting quotes from different contractors and submitting to buyers to finalize after negotiation
  • Execute the projects with different contractors for E&I jobs like Cable laying, Instrument Hook-up, Support system, JB/Panel installation, Testing & Commissioning
  • Working with contractors to do documentation like P&ID update, Loop drawing, single line Drawing, Cable routing, Cable schedule
  • Corrective Maintenance during operation: Problem finding, Solving, reduce downtime
  • Predictive Maintenance during operation: Thermal scanning, Vibration checking Regular Maintenance Building and Plant: Facility lighting and services
  • Inventory management: Ordering materials, stock take and maintain inventory records
  • Documentation & Auditing: Record keeping and Attending internal and External IMS/ ISO audit for maintenance and Inventory.

Electrical & Instrumentation Engineer

Airliquide Singapore Pte Ltd
03.2016 - 06.2019
  • Preparing of the PM schedule for the plant electrical panel, Control panel, Motors, Preparation of the Calibration & verification Schedules for the plant instruments
  • Executing quarterly, half yearly, yearly PM for all equipment based on the schedule
  • Execute the instrument calibration with 3rd party and in-house verification based on the schedule
  • Attending corrective maintenance: finding problems, troubleshooting and reducing down time
  • Doing minor cabling work, installation of SS tubing
  • Field Electrical panels and Motors daily monitoring and doing predictive maintenance Engaging contractors to execute the major installation and Equipment service contract
  • Preparing Preventive Maintenance, Predictive Maintenance, Corrective Maintenance testing documents and Keeping records for audit purpose
  • Engaging Contractors to execute the major installation and Equipment service contract
  • Preparing Preventive Maintenance, Predictive Maintenance, Corrective Maintenance testing documents and Keeping records to attend audit.

Electrical & Instrumentation Engineer (Project)

Cyclect Electricals Pte Ltd
03.2013 - 02.2016
  • Attending different Site surveys with clients and preparing tender documents
  • Preparing BOQ from P&ID, Electrical Single line Diagram (SLD) and Equipment (instruments, Signal Cables, Control Cables, Network Cables, Tubing & fitting, JB & Cable Glands, Cable tray & Accessories
  • Power Cable, Power DB, Isolators, SSO & Earth Cables)
  • Material Enquiry with Suppliers
  • Getting quotations & discounts from different suppliers
  • Raising PR and issuing PO to Supplier
  • Preparing the Documents of Project schedule, Instrument schedule, Cable schedule, Termination details, Check list
  • Attending FAT and SAT(Factory and Site Acceptance Test)
  • Execute the installation of MCC panel, VFD, Lighting DB, HT and LT Panels, UPS panel, Marshalling Cabinet, Local Control Panel (LCP) and Remote I/O panel(RIO)
  • Execute the installation of Cable support,cable tray, Cable laying using Cable schedule
  • Field instruments mounting using P&ID, Hookup drawing
  • Cable termination using termination drawing
  • Calibration & Verification Of field instruments like PT,FT,LT,PDT,TT,DP Switch, DP gauge, Pressure gauge, Control valves, Temperature gauge, Temperature sensor-RTD & Thermocouple
  • QC testing (Cold and Hot Testing) of continuity check, insulation check, Loop check
  • Plant Testing & commissioning.

Instrumentation Maintenance Engineer

Sudanese Sugar & Power Co Ltd
08.2011 - 06.2012

Instrumentation Project Engineer

Hi-Tech System & Automation Pvt. Ltd
10.2008 - 03.2011

Instrumentation Trainee Engineer

Gem Sugars Pvt Ltd
08.2007 - 08.2008

Education

BE - Electronics & Instrumentation -

Annamalai University
Chidambaram, Tamilnadu

Skills

Plant E&I Maintenance

undefined

Accomplishments

  • Airliquide Certified E&I Local Expert-1 (received year 2023)
  • Received Special recognition Award for the year 2020 performance from SOLVAY for Acting as Maintenance manager role for 5 months

Personal Information

  • Gender: Male
  • Marital Status: Married

Languages

English
Arabic
Tamil

Timeline

Electrical & Instrumentation Engineer

Airliquide Singapore Pte Ltd
07.2021 - Current

Electrical & Instrumentation Engineer

Solvay Specialty Chemicals Pte Ltd
07.2019 - 06.2021

Electrical & Instrumentation Engineer

Airliquide Singapore Pte Ltd
03.2016 - 06.2019

Electrical & Instrumentation Engineer (Project)

Cyclect Electricals Pte Ltd
03.2013 - 02.2016

Instrumentation Maintenance Engineer

Sudanese Sugar & Power Co Ltd
08.2011 - 06.2012

Instrumentation Project Engineer

Hi-Tech System & Automation Pvt. Ltd
10.2008 - 03.2011

Instrumentation Trainee Engineer

Gem Sugars Pvt Ltd
08.2007 - 08.2008