Summary
Overview
Work History
Education
Skills
Timeline
Generic
Nicole Chew

Nicole Chew

Quantity Surveyor

Summary

To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

5
5
years of professional experience
3
3
Languages

Work History

Quantity Surveyor

Finebuild Systems Pte Ltd
07.2023 - Current

Job Scope :

  • Analyze tender document and tender drawing measurements.
  • Request quotations from subcontractors and suppliers based on the Bill of Quantities (BQ). After receiving all quotations, analyze and compare them, then prepare unit rates for the tender.
  • Analyze construction drawings and perform take-offs. Place orders for required construction materials.
  • Ensure smooth progress of works and material delivery during the construction stage to avoid project delays.
  • Liaise and negotiate with subcontractors and suppliers regarding construction costs, progress claims, and final accounts.
  • Collaborate with the project manager to prepare monthly progress claims, including demarcation plans and relevant documents.
  • Prepare all supporting documents for variation orders.
  • Certify subcontractor work and prepare subcontractor progress certificates.
  • Prepare final accounts and engage in discussions with consultants and clients.


Project Participated :

Ongoing Projects:

  • Labrador BC2 Project (Proposed Integrated Development of Commercial office tower with basement Car park, A&A Works to Annex Building and a Linear Park at Labrador villa road / Pasir Panjang Road)
  • Proposed Integrated Development of 230KV Underground Substation, Operation Support Centre and Future Commercial Building at Labrador Villa Road / Pasir Panjang Road (BC1)
  • Design and Build of Proposed Additions and Alterations to the Existing Standard Factory, Including Extension of a 2-Storey Building, For Sealed Air (Singapore) Pte Ltd on Lot 02123A MK07 at No.2 Tuas Avenue 6 Singapore 639293
  • Proposed Additions and Alterations to the Existing Single-User Factory Building with Provision of New Temporary Ancillary Workers Dormitory (120 Pax) at the First and Mezzanine Storey on Lot 01286A at 33 Tuas Avenue 2 Singapore 639463 (Tuas Planning Area)


Completed Projects :

  • Proposed Addition and Alteration Works to Level 37 Fitness Centre and Lobby Stairs at Hilton Singapore Orchard

Planner

Jabil Circuit Sdn Bhd
06.2022 - 06.2023

Job Scope :

  • Monitor customer demand and check for material readiness
  • Analyze customer forecast and prepare weekly report
  • Based on the shortages report, prepare weekly report and meeting with customer to update on the material cleanliness for each model and production output
  • Prepare weekly system report to review critical material shortages and follow up with buyer
  • Based on the material readiness, schedule production accordingly and ensure delivery on-time to customer
  • Coordinate and checking daily production running process and output
  • Liaise with relevant team to ensure production run smoothly
  • Prepare excess exposure claim due to demand cancellation

Quantity Surveyor

BWC Construction Sdn Bhd
02.2019 - 06.2022

Job Scope :

  • Analyse tender document and taking off based on the tender drawing
  • Based on the BQ, request quotation needed from subcontractor and supplier. After receive all the quotation, prepare and fill in the tender documents.
  • After receive the LOA for project, purchase the materials required for the entire project and arrange delivery of materials to site
  • Analyse and taking off based on construction drawing
  • Review the construction drawing and report to contract manager if any difference in costing
  • Prepare and break down the costing estimation for the entire project.
  • Record the progress of work daily
  • Prepare weekly work done progress report to management
  • Prepare documents for any changes in design or specification of project
  • Assist in preparing monthly progress claim, final account and supporting documents for variation order
  • Liaise with subcontractor and issue work order or LOA for subcontractor. After the job is awarded, make arrangement for subcontractor to mobilize into the site.


Project Participated :

  • Earthwork, Road & Drainage Work for Solar Farm at Kerian, Perak - Year 2021
  • Slope stabilisation and Bridgework at Ijok, Perak - Year 2020
  • Earthwork, Road & Drainage Work for Toyo Tyre Factory (Phase 2), Kamunting Perak - Year 2019

Education

Bachelor's Degree in Quantity Survey -

Tunku Abdul Rahman College (TARC)
Kuala Lumpur Malaysia
04.2001 -

Skills

undefined

Timeline

Quantity Surveyor

Finebuild Systems Pte Ltd
07.2023 - Current

Planner

Jabil Circuit Sdn Bhd
06.2022 - 06.2023

Quantity Surveyor

BWC Construction Sdn Bhd
02.2019 - 06.2022

Bachelor's Degree in Quantity Survey -

Tunku Abdul Rahman College (TARC)
04.2001 -
Nicole ChewQuantity Surveyor