Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Nicole Huong

Summary

More than 14 years experiences in oil and gas industry. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.


Experienced Wells professional with core drilling competency as FLBM offshore (Semi-Submersible, TAD, Drillships).

Held frontend and operations engineer for deepwater campaign (Gumusut Kakap campaigns). Previously held a role as regional HSSE advisor and Senior Wells Engineer (HSSE).



Overview

15
15
years of professional experience
1
1
Certification

Work History

Lead Wells Engineer

Shell
10.2023 - Current
  • Functions as the wells project manager in assigned wells projects, leveraging engineering support from Franchise and Detailed design teams, to drive project schedule and steward projects through Well Delivery Process.
  • Will provide a consistent approach to asset facing issues and ensure value drivers, technical risk and strategy are understood, and agreed with asset leadership team.
  • Developed positive working relationships with internal and external stakeholders (Upstream and Wells value chain, direct interactions with senior leaders, such as DRB members, GMs and VPs in Shell, Regulator and JV partners) to effectively coordinate work activities
  • Led cross-functional teams to successfully complete projects on time and within budget constraints.

Senior Wells Engineer (HSSE)

Shell
04.2021 - 10.2023
  • Ensures proper S&E improvement strategies, systems, policies, standards, and tools are in place and functioning to assist the drive to Goal Zero.
  • Leverages and promote best practice sharing and LFI (learning from incident) across all Wells IG operations and sites.
  • Support or participate in accident investigation and verify implementation of recommendations by line management and analyze, interpret and implement data for improved HSSE performance.
  • Led Malaysia Wells Teams to win the Honourable Mention for achieving zero HPI, more than 0.5mlm manhours and 100% Fail safe in Wells Leadership Team Q4 2022 Focus Award Winner.
  • Led Malaysia Wells Teams to win the Safety Award for Best Demonstrated Strength of Controls in Working Safety 2023.
  • Committee member for IADC Asia Pacific HSSE


Integrated Gas HSSE Wells Engineer

Shell
07.2020 - 07.2021
  • In support of Vice President’s goal to improve staff engagement and knowledge sharing, edit the weekly bulletins for IG (Qatar, Malaysia, China, Sakhalin, Australia and Brunei)
  • Coordinate the roll-out and implementation of initiatives on S&E road maps.
  • Contribute to relevant regional and global Common Interest Networks.
  • Maintain the accuracy and quality of HSSE Reporting. Analyse data and leading indicators from A&A, DROPS, Line of Fire, to identify key focus areas and improvement areas.
  • Actively facilitate learning through LFE.
  • Support the implementation of audit LOD1 and LOD2 in IG.

Staff Wells Engineer for Gumusut Kakap Phase 3

Shell
06.2019 - 04.2021
  • Led cross-functional teams to successfully complete projects on time and within budget constraints.
  • Led the well designs for 1x oil producer and 1x water injector deepwater wells.
  • Led the relief well design and report for the campaign.
  • Focal point for SIMOPS Site Specific Plan and BOP hopping path ensuring safe delivery of the campaign.
  • Focal point for campaign Performance Improvement Plan.

Operations Engineer for Gumusut Kakap Phase 2

Shell
12.2018 - 06.2019
  • Wells Owner for 1x Oil Producer and 1x Water Injector wells leading to the one of the Lowest Deepwater Wells in Shell Malaysia.
  • Led the Logistic Workshop and HAZID for ASOG SIMOPS (2x PSVs alongside rig at the same time) for the drilling campaign.
  • Focal point for drilling campaign logistic management for vessels (Managed up to 6 vessels at 1 point)
  • Focal point for SIMOPS Site Specific Plan - liaise with asset, project, seismic team and Wells during the drilling campaign.
  • Organized After Action Review (AAR) Workshop for the drilling campaign and Integrated AAR with Subsurface team.

Night Drilling Supervisor

Shell
09.2017 - 12.2018
  • Enhanced drilling efficiency by implementing advanced drilling techniques and equipment.
  • Reduced safety incidents by conducting regular safety audits and enforcing strict adherence to safety protocols.
  • Optimized drilling operations for maximum productivity with thorough planning and coordination of resources.
  • Managed rig personnel effectively, ensuring proper training and skill development for optimal performance.
  • Close out the rig start up assurance timely.


Note:

1. West Capella rig for Gemilang-1 Deepwater Exploration wells

2. Sapura Esperanza rig for Malikai Phase 1 drilling campaign

- Drilled 11 development wells (including 2x wells drilled with MPD + 1 Near Field Exploration Well.

- Focus on ECD management where injector wells are long horizontal wells and narrow drilling margins (fields heavily fractured and some blocks with fast depletion).

- SIMOPS to maximize offline activities, production up-time and long duration of simultaneous drilling/ commissioning/ production

- Completed the campaign with 448 Goal Zero days and lower execution cost vs plan.

Performance Drilling Supervisor

Shell
03.2017 - 08.2017
  • Optimized the offline and online operations/ activities including equipment/ tool readiness for upcoming operation.
  • Captured the after-action review for upcoming operations learning (both drilling and completion), tracking non-productive time and known loss time, costing and micro-KPI for operations.
  • Led Value Stream Mapping for the operations performance improvement.
  • Engagement with contractors for upcoming operations requirement such as mud, pit management, platform crane requirement etc (planning ahead to avoid downtime/ waiting time).
  • Issued Drilling Operations Instruction (DOIs) for day to day drilling operations and conducted mini DWOP at the offshore prior to operations


Note: Sapura Esperanza rig for Malikai Phase 1 drilling campaign

Assist and Assure Engineer (Wells Engineer)

Shell
07.2016 - 02.2017
  • Part of the team members in Global Rig Start-up (GRST) and assisted in the closure of GRST action items during the rig tow.
  • Led the closure verification of Fire & Gas detection, loose lifting gear register, temporary register, and verification on Fire & Gas detection on both tender and DES package.
  • Introduced and implemented barrier ownership sheet and prompt cards to all crew onboard and provided the coaching session ensuring their understanding of the individual barrier.
  • Successfully implemented 100% observation/ STOP cards participation onboard SKD Esperanza.
  • D&I focal point on the rig- prepared the poster and slides for the rig and chopper briefing slides.
  • Led the emergency response training for using FROG at the rig floor.


Double hatting in supervising the day-to day operations:

  • Retrieval of the corrosion caps with both ROV and guidewire to surface and modification of the corrosion cap to trash cap.
  • Retrieval and installation of guideposts with guidewire in the preparations for next operations.
  • Wellhead cleaning to the installation of trash caps.
  • Running 9-5/8” casing.
  • Set and pressure test seal assembly.

Well Site Operations Engineer

Shell
04.2014 - 07.2016

For:

1. Noble Bully II

(i) Jagus East 2 well: Deepwater exploration well located offshore Brunei in block CA1, 400m from the Malaysian border.
(ii) Tuntong-1: Deepwater exploration well drilled in North Luconia Deepwater Province, an area characterized by large scale pre-MMU fault blocks and comprises a carbonate pinnacle.
(iii) Marjoram-2: Deepwater appraisal well- drilled with PMCD through carbonate reservoir.
(iv) Malikai Top Hole (First DP vessel to drill top hole): Used the “Mud Return without Riser” system.
(v) Lalawak-1: Deepwater exploration well with “High Temperature” well to explore the Deepwater parts of Northern Luconia


2. Ensco 8504

(i) Marjoram-1
• First Deepwater BTR-S PMCD deployment on dynamic position rig for Shell & Ensco globally.
(ii) 2x Gumusut Kakap Gas Injector Wells (GK-G103E and GK-G302E)
• Narrow margin drilling well with single zone gas injector wells and completed as an open hole gravel pack.

Wells Contract Engineer

Shell
06.2013 - 04.2014
  • Reduced contract negotiation time by proactively addressing potential roadblocks and collaborating with stakeholders.
  • Enhanced team productivity through effective communication and coordination of contractual requirements.

Operations Engineer (Cementing Operations)

Baker Hughes
10.2011 - 05.2013
  • Independently handled the cementing operations of Petronas Carigali, Newfield, Exxon Mobil and Shell which includes simulations on cementing, cement slurry and spacer design, proposed centralization, logistic for chemicals/ cement/ tools and personnel (HPHT wells, Gas Wells, Stage Cementing)
  • Prepared end of well reports and submit to client in a timely manner, complete with analysis, problem solving and lessons learned.

Field Engineer

Baker Hughes
01.2011 - 10.2011
  • Field engineer/ supervisor for pressure pumping services:
    ❖ Cementing operations includes bulk plant load out, cement head, cementing testing, cement pump, data acquisition set-up and monitoring, field bulk equipment, and treating iron rig up operations.
    ❖ Fracturing operations includes blender, hydration unit, iron rig-up, proppant moving equipment, frac pumps, and load out operations
    ❖ Coiled tubing operations includes coiled tubing units, N2 pumps and data acquisition.
    ❖ Acidizing operations includes acid pumps, iron rig-up, lab testing, data acquisition and acid transport operations.

Laboratory Engineer

Baker Hughes
12.2008 - 12.2010
  • Enhanced laboratory efficiency by streamlining workflows and implementing process improvements.
  • Optimized equipment utilization through effective scheduling and maintenance, reducing downtime.
  • Developed new procedures for sample preparation, leading to more accurate test results.
  • Collaborated with cross-functional teams to address complex research problems, contributing to successful project completion.

Education

Bachelor of Chemical Engineering - Chemical Engineering

Curtin University of Technology Australia
Malaysia
04.2008

Skills

  • Technical Reporting
  • Cost Estimates
  • Teamwork and Collaboration
  • Work Planning and Prioritization
  • Problem solving
  • Cost Analysis

Certification

1. Shell Round 1 and 2 Certificate Well Engineering Competency.

2. Mental Health Ambassador for Shell Malaysia Wells

3. Diversity, Equity, and Inclusion (DE&I) focal point for Shell Malaysia Wells.

4. Contract Holder for Subsea Wellhead Contracts

Timeline

Lead Wells Engineer

Shell
10.2023 - Current

Senior Wells Engineer (HSSE)

Shell
04.2021 - 10.2023

Integrated Gas HSSE Wells Engineer

Shell
07.2020 - 07.2021

Staff Wells Engineer for Gumusut Kakap Phase 3

Shell
06.2019 - 04.2021

Operations Engineer for Gumusut Kakap Phase 2

Shell
12.2018 - 06.2019

Night Drilling Supervisor

Shell
09.2017 - 12.2018

Performance Drilling Supervisor

Shell
03.2017 - 08.2017

Assist and Assure Engineer (Wells Engineer)

Shell
07.2016 - 02.2017

Well Site Operations Engineer

Shell
04.2014 - 07.2016

Wells Contract Engineer

Shell
06.2013 - 04.2014

Operations Engineer (Cementing Operations)

Baker Hughes
10.2011 - 05.2013

Field Engineer

Baker Hughes
01.2011 - 10.2011

Laboratory Engineer

Baker Hughes
12.2008 - 12.2010

Bachelor of Chemical Engineering - Chemical Engineering

Curtin University of Technology Australia
Nicole Huong