More than 14 years experiences in oil and gas industry. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Experienced Wells professional with core drilling competency as FLBM offshore (Semi-Submersible, TAD, Drillships).
Held frontend and operations engineer for deepwater campaign (Gumusut Kakap campaigns). Previously held a role as regional HSSE advisor and Senior Wells Engineer (HSSE).
Note:
1. West Capella rig for Gemilang-1 Deepwater Exploration wells
2. Sapura Esperanza rig for Malikai Phase 1 drilling campaign
- Drilled 11 development wells (including 2x wells drilled with MPD + 1 Near Field Exploration Well.
- Focus on ECD management where injector wells are long horizontal wells and narrow drilling margins (fields heavily fractured and some blocks with fast depletion).
- SIMOPS to maximize offline activities, production up-time and long duration of simultaneous drilling/ commissioning/ production
- Completed the campaign with 448 Goal Zero days and lower execution cost vs plan.
Note: Sapura Esperanza rig for Malikai Phase 1 drilling campaign
Double hatting in supervising the day-to day operations:
For:
1. Noble Bully II
(i) Jagus East 2 well: Deepwater exploration well located offshore Brunei in block CA1, 400m from the Malaysian border.
(ii) Tuntong-1: Deepwater exploration well drilled in North Luconia Deepwater Province, an area characterized by large scale pre-MMU fault blocks and comprises a carbonate pinnacle.
(iii) Marjoram-2: Deepwater appraisal well- drilled with PMCD through carbonate reservoir.
(iv) Malikai Top Hole (First DP vessel to drill top hole): Used the “Mud Return without Riser” system.
(v) Lalawak-1: Deepwater exploration well with “High Temperature” well to explore the Deepwater parts of Northern Luconia
2. Ensco 8504
(i) Marjoram-1
• First Deepwater BTR-S PMCD deployment on dynamic position rig for Shell & Ensco globally.
(ii) 2x Gumusut Kakap Gas Injector Wells (GK-G103E and GK-G302E)
• Narrow margin drilling well with single zone gas injector wells and completed as an open hole gravel pack.
1. Shell Round 1 and 2 Certificate Well Engineering Competency.
2. Mental Health Ambassador for Shell Malaysia Wells
3. Diversity, Equity, and Inclusion (DE&I) focal point for Shell Malaysia Wells.
4. Contract Holder for Subsea Wellhead Contracts