Summary
Overview
Work History
Education
Skills
Timeline
Generic

Myo Min Htun

Summary

Dynamic Operation Executive with a proven track record at Yellow Ribbon Industries, enhancing machine efficiency and safety. Skilled in project management and industrial automation, I successfully implemented process improvements that boosted team productivity. A dedicated team player, I excel in mentoring and fostering professional growth while driving operational excellence.

Overview

24
24
years of professional experience

Work History

Operation Executive ( Maintenance )

Yellow Ribbon Industries
06.2019 - Current

Job scope.


  • Maintain laundry machine, LT switch room, water recycle plant, kitchen equipment, and bakery equipment.
  • Improve machine efficiency, safety, and output quality.
  • Purchase materials.
  • Directed strategic initiatives to enhance operational efficiency across multiple departments.
  • Implemented process improvements that streamlined workflows and reduced redundancies.
  • Mentored junior staff, fostering professional growth and increasing team productivity.
  • Developed training programs to elevate employee performance and engagement levels.

Assistant Engineer

CNA Group Ltd/ CNA Development Pte Ltd/ PrimusTech Pte Ltd
08.2014 - 06.2019

Projects

1. HTA

2. Changi Prison Cluster A.

3. Changi Prison, Cluster B.

4. ISTINA

5. Down Town Line

  • Monitoring BMS
  • Maintain the BMS system.
  • Purchase materials.
  • Inspection/Coordination with the main contractor/consultant.
  • Installation, testing, and commissioning.
  • Supported engineering teams in project design and implementation, ensuring compliance with industry standards.
  • Mentored junior engineers, fostering skill development and promoting knowledge sharing among team members.
  • Assisted in the development of technical specifications for engineering projects, ensuring accuracy and adherence to established guidelines.
  • Collaborated on technical documentation, enhancing clarity and accuracy for project stakeholders.
  • Assisted in performing site inspections, identifying potential issues, and recommending solutions to improve safety.
  • Implemented process improvements that streamlined workflow and increased team efficiency.

Project Coordinator

Asiatic Engineering Pte Ltd
09.2009 - 08.2014

Projects

1. KTPH (Yishun Hospital) Solar System.

2. TREELODGE (Pungol) Solar System.

3. Livia Condominium Solar System.

4. Waterfront Solar BIPV System at Breeze Shelters and Visitor Center.

5. Super Tree Lion Grove & Arrival Cluster Solar System.

6. Kranji Camp Solar System.

7. Harrison Road Solar System.

8. Hua Chong Institution: Solar System.

9. Bukit Merah (HDB) Solar System.

10. Kallang Bahru (HDB) Solar System.

11. Bishan Street 12 (HDB), Solar System.

12. Ang Mo Kio Ave 10 (HDB) Solar System.

13. Simei Street 1 (HDB) Solar System.

14. ITE MAK Solar System.

15. LTA Solar System.

16. Serangoon North Ave 3 (HDB), Solar System.

17. Wellington Circle (HDB) Solar System.

18. SMRT DEPORT Solar System.


Job Scope

  • Coordinated project timelines and deliverables across multiple teams to ensure smooth execution.
  • Facilitated communication between stakeholders, enhancing collaboration and project transparency.
  • Developed project documentation including scopes, schedules, and reports to track progress effectively.
  • Managed resource allocation and scheduling to optimize team productivity and project outcomes.
  • Installation, testing and commissioning of the various solar PV system
  • Various electrical panel installations.
  • Monitored budget expenditures and identified cost-saving opportunities throughout project lifecycle.
  • Kept projects on schedule by managing deadlines and adjusting workflows.
  • Supervised multiple projects from project start through delivery by prioritizing needs and delegating assignments.
  • Created job files for each project and maintained current data in each file.
  • Maintained accurate documentation of all projects, facilitating efficient audits and future reference.
  • Responded to requests for information on materials to inquiring parties.
  • Various inverter installations and testing.
  • Installation, testing, and commissioning of the solar PV monitoring system.

Electrical and Instrument Technician

Rotary Electrical Company Pte Ltd
09.2004 - 11.2009

Projects

1. Nigeria Deep Water Exploration Project: ERHA FPSO under Sembawang Marine and Offshore Engineering, Singapore.

2. Crude and petroleum storage and its related facilities, Universal Terminal, Singapore.

3. Sinopec Sichuan to East Pipeline Project, Singapore.

4. Phase, Biodiesel Storage and Its Related Facilities, Singapore.


Job Scope

  • Pre-commissioning of instruments, process control, ESD, fire, and gas system.
  • Electrical panel installation for various substations.
  • Construction and installation of instruments, process control, ESD, and fire and gas systems for various modules.
  • Rectification of class, owner comments and punch list.
  • Provided technical support to team members during complex troubleshooting efforts, sharing expertise when necessary to resolve issues quickly and efficiently.
  • Liaised with engineering staff on special projects to assist with configuration, installation and interoperation of system equipment.
  • Analyzed engineering designs and suggested improvements and modifications.

Electrical and Air-con Technician

MICT ( Myanmar Information and Communication Technology )
01.2002 - 08.2004

Job scope


  • Diagnosed and repaired various air conditioning systems to ensure optimal performance.
  • Conducted routine maintenance and inspections to prevent system failures and extend equipment lifespan.
  • Assisted in the installation of new HVAC units, ensuring compliance with industry standards.
  • Collaborated with team members to troubleshoot complex technical issues efficiently.
  • Provided training and support to junior technicians on safety protocols and repair techniques.
  • Maintained accurate records of service performed and parts used for inventory management.
  • Enhanced customer satisfaction through effective communication and timely service delivery.
  • Boosted customer satisfaction by providing timely and professional air conditioning maintenance services.
  • Maintained a safe working environment by adhering to safety protocols while performing tasks such as electrical wiring, refrigerant handling, and equipment installation.
  • Troubleshot complex mechanical issues using diagnostic tools, resulting in faster resolution times for customers experiencing system failures.
  • Collaborated with team members to complete complex installations and repairs efficiently and effectively.
  • Established a reputation for excellent problem-solving abilities contributing to high customer referral rates.
  • Assisted in project planning for commercial installations ensuring all necessary permits were obtained.

Education

No Degree - Electrical Engineering

ITE
08-2008

No Degree - Rigging & Material Handling

ITE
01-2005

High School Diploma -

No. 2 Basic Education High School Thanlyin
Myanmar
03-2001

Skills

  • Team player
  • Project management
  • Purchasing
  • Industrial Automation and Control Systems

Timeline

Operation Executive ( Maintenance )

Yellow Ribbon Industries
06.2019 - Current

Assistant Engineer

CNA Group Ltd/ CNA Development Pte Ltd/ PrimusTech Pte Ltd
08.2014 - 06.2019

Project Coordinator

Asiatic Engineering Pte Ltd
09.2009 - 08.2014

Electrical and Instrument Technician

Rotary Electrical Company Pte Ltd
09.2004 - 11.2009

Electrical and Air-con Technician

MICT ( Myanmar Information and Communication Technology )
01.2002 - 08.2004

No Degree - Electrical Engineering

ITE

No Degree - Rigging & Material Handling

ITE

High School Diploma -

No. 2 Basic Education High School Thanlyin
Myo Min Htun