Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

MUTHU SENTHILKUMAR

Manamelkudi

Summary

Proficient Project Engineer with 4 years of experience driving over 150 projects to completion. Skilled in overseeing technical staff and checking that projects are completed on schedule, within budget and according to specifications.

Overview

7
7
years of professional experience
1
1
Certification

Work History

Project Engineer (Telecom)

3Tel International PTE LTD
06.2022 - Current
  • Survey and Technical Proposal: Conduct site surveys to assess telecommunications infrastructure needs and gather relevant data.
  • Develop technical proposals outlining project objectives, scope, and deliverables.
  • Obtain necessary approvals from stakeholders for proposed solutions and project plans.
  • Installation and Handover: Coordinate the installation of telecommunications equipment and systems according to project specifications.
  • Ensure proper configuration, testing,Troubleshooting, and integration of equipment.
  • Facilitate the handover process to the customer, ensuring all requirements are met and systems are operational.
  • Electrical Installation Works (New & Replacement):Supervise the installation of electrical infrastructure, including new installations and replacements.
  • Collaborate with Building Licensed Electrical Workers (LEWs) to conduct testing and verification of electrical works.
  • Hand over completed electrical installations to the building owner, ensuring compliance with safety standards and regulations.
  • As-Built Documentation: Prepare accurate as-built documentation reflecting the final installed configuration of telecommunications and electrical systems.
  • Document any deviations from initial designs or plans during the installation process.
  • Provide comprehensive documentation to the customer for future reference and maintenance purposes.
  • Reporting: Compile and generate regular progress reports for project team leads and managers, detailing project milestones, accomplishments, and challenges.
  • Communicate project updates, issues, and risks to stakeholders in a clear and concise manner, facilitating informed decision-making and problem resolution.

Assistant Project Engineer (Telecom)

3Tel International PTE LTD
02.2021 - 05.2022
  • Site Survey, scheduling of installation, co-ordination with customers, sub-contractor, PE, LEW and vendors, seeking approval of installation from tenants of building
  • Assist in preparing technical proposals for telecommunication projects, outlining project objectives, scope, deliverables, and timelines.
  • Work closely with project engineers and managers to develop innovative solutions that meet client requirements while adhering to technical standards and best practices.
  • To be responsible for the Implementation activities such as preparation of proposal and submission of design,
  • Able to commission/integrate/troubleshoot/test Ericsson equipment
  • Compile and generate regular progress reports for project team leads and managers, detailing project milestones, accomplishments, and challenges.

Site Supervisor (Telecom)

TM HUB PTE LTD
02.2017 - 01.2021
  • Supervise the installation, configuration, and maintenance of telecommunications equipment (Ericsson equipment and radios)
  • Ensure adherence to installation standards, manufacturer guidelines, and safety protocols.
  • Coordinate electrical installation works as required for telecommunications equipment, such as power supply connections and grounding.
  • Collaborate with licensed electricians to ensure compliance with electrical codes and safety regulations.
  • Verify proper functioning of electrical components and systems.
  • Capture and submit comprehensive completion photos documenting the installed equipment, connections, and site conditions
  • Conduct site master VSWR (Voltage Standing Wave Ratio) measurements to assess the performance of RF feeders and antenna systems.
  • Generate detailed VSWR reports identifying any anomalies or deviations from optimal performance.
  • Recommend corrective actions to address VSWR issues and optimize system efficiency.
  • Ensured safety compliance on job sites by regularly conducting inspections and enforcing strict adherence to guidelines.
  • Maintained records and logs of work performed and materials and equipment used.


Education

Bachelor of Engineering - Electronics And Communication Engineering

Sudharsan Engineering College, ANNA UNIVERSITY
SATHIYAMANGALAM, TAMILNADU, INDIA
11.2011

Higher Secondary - Secondary Education

St. Arulanadar Higher Secondary School
ORIYUR, TAMILNADU, INDIA
07.2006

Skills

  • Project Management
  • Scheduling and Planning
  • Document Management
  • Root Cause Analysis
  • Safety-Minded
  • AutoCAD
  • MS Office

Certification

  • Skill evaluation certificate Test in Electrical & Wiring (BCA)
  • WSQ Supervise Construction Work for WSH
  • Apply Workplace Safety & Health in Process Plant
  • Managing Work at Heights

Languages

Tamil
Bilingual or Proficient (C2)
English
Bilingual or Proficient (C2)

Timeline

Project Engineer (Telecom)

3Tel International PTE LTD
06.2022 - Current

Assistant Project Engineer (Telecom)

3Tel International PTE LTD
02.2021 - 05.2022

Site Supervisor (Telecom)

TM HUB PTE LTD
02.2017 - 01.2021

Bachelor of Engineering - Electronics And Communication Engineering

Sudharsan Engineering College, ANNA UNIVERSITY

Higher Secondary - Secondary Education

St. Arulanadar Higher Secondary School
MUTHU SENTHILKUMAR