Summary
Overview
Work History
Education
Skills
Languages
Personal Information
Certification
Timeline
Generic
MURALI DASS

MURALI DASS

Singapore

Summary

A registered member of IES and a Civil Engineer with 10 years of experience. Capable of working independently with minimal supervision and committed to providing high-quality service to every project, with a focus on health, safety, environmental issues, and human resource development, while staying up to date with new work standards. A professional, capable, and motivated individual who consistently performs in challenging environments. Currently seeking to transition into a Resident Engineer position to leverage expertise in project management, site supervision, and regulatory compliance.

Overview

12
12
years of professional experience
1
1
Certification

Work History

PROJECT ENGINEER CUM QAQC ENGINEER

Hwa Seng Builder Pte Ltd
08.2022 - Current
  • Consist of PUB potable water pipe diversion (4 nos
  • Of water pipe sizes ranging form 1200mm to 1600mm diameter) at the upcoming JW4 station area
  • Involves diverting 22kV power cable at the JW4 station area
  • Involves in traffic diversion works to facilitate the diversion of existing utilities
  • Comprises site clearing and preparing work zones as per the site utilization plan
  • Consist of 12nos of bored pile (1500mm dia.) for viaduct
  • Consist of 70 nos
  • Of bored pile (1200mm & 1500mm dia.) for JW4 station
  • Consist of 64 nos. contiguous bored pile (CBP) retaining wall
  • Consist of 3 nos. contiguous bored pile (CBP) retaining wall
  • Of columns for the viaduct
  • Consist of 3 nos of crosshead (including one movement joint crosshead)
  • Production of Segmental Box Girder (SBG) for both J113 & J115a of Jurong Region Line.
  • Comprises site clearing and preparing work zones as per the site utilization plan
  • Prepare all construction method statements for QPS & LTA approval
  • Prepare submissions such as shop drawings, formwork design, and proposals for QPS, LTA, and relevant parties such as NTU and NIE for approval
  • Prepare Permit-to-dig (PTD) and Annex C & D for excavation works
  • Prepare Earth Control Measure (ECM) Plan
  • Prepare monthly project concrete test cube summary report submission
  • Responsible for handling Non-conformance notices (NCN) and non-conformance reports (NCR)
  • Attend coordination meetings with management, clients, authorities, and subcontractors
  • Monitor site activity and stand-in replacement when required
  • Procure material and machinery for site work
  • Monitor contractor for QHSE conformance

SENIOR PROJECT ENGINEER

WZS Binaraya Sdn Bhd
01.2019 - 07.2022
  • Consist of a total of 10 River Bridges (BRV) & 6 Road Over Bridges (ROB)
  • Consist of one (2 span) temporary steel bridge
  • Consist of one Vehicular Box Culvert (VBC)
  • Consist of 80nos of post-tensioning T-Beam
  • Consist of 90nos of pre-tensioned TM-Beam
  • Consist of 48nos of pre-tensioned U-Beam
  • Construction of related infrastructure works for the all 6 ROBs
  • Consist total of 146nos of 1200 & 1000mm dia bored pile
  • Consist of 480nos of R.C Pile
  • Construction of retaining wall (Nehemiah) for 6nos of ROBs & 1 BRV

PROJECT ENGINEER

Pesona Metro Holdings Berhad
07.2016 - 12.2018
  • Consist of cut & fill earthworks
  • Blasting works for approx 60000m3 of rock & hard material
  • Consist of approx 1 million linear meter installation of Prefabricated Vertical Drain (PVD)
  • Consist of 3 Vehicular Box Culvert (VBC)
  • Consist of 8 Box Culverts
  • Prepare all related method statements
  • Coordinate between client, consultant & subcontractor
  • Attend coordination meeting with management, client, authorities and subcontractors
  • Submit technical queries to consultant
  • Prepare as-built submission
  • Site Inspection with Consultants
  • Monitor contractor for QHSE conformance

PRODUCTION ENGINEER

HL- Manufacturing Industries Sdn Bhd
04.2015 - 06.2017
  • Production of precast R.C components for HDB apartment
  • Production of pre-tensioned slap for HDB carpark building

PROJECT ENGINEER

Acre Works Sdn Bhd
03.2013 - 03.2015
  • Production of Segmental Box Girder (SBG) for LRT Expansion Package B
  • Production of Segmental Box Girder (SBG) for MRT Package V3
  • Prepare all related method statements
  • Prepare Casting Schedule
  • Prepare Delivery Schedule
  • Prepare Material & Manpower for production
  • Coordinate between client, consultant & in-house workers
  • Progress reporting
  • Attend coordination meeting with management & team on site
  • Site Inspection with Consultants
  • Monitor workers for QHSE conformance

Education

Bachelor of Civil Engineering (Hons) -

Infrastructure University of Kuala Lumpur (IUKL)
Kuala Lumpur
03.2015

Diploma in Civil Engineering -

Infrastructure University of Kuala Lumpur (IUKL)
Kuala Lumpur
01.2011

Sijil Pelajaran Malaysia (SPM) - O Levels -

SMK Kepong , FRIM
12.2006

Skills

  • Microsoft Office
  • Autodesk AutoCAD
  • Oracle Aconex

Languages

English
Malay

Personal Information

  • Place of Birth: Kuala Lumpur
  • Date of Birth: 01/04/89
  • Nationality: Malaysian
  • Driving License: D,B2 (Malaysia Driving Licence)

Certification

  • Resident Engineer Certificate - RE4960
  • WSH Management in Construction Industry
  • KTMB 038 - Personal Track Safety
  • KTMB 039 - Person In-charge of works (PICOW)
  • Oil & Gas Safety Passport (OGSP) - Petronas
  • Basic Rigging and Slinging Training
  • Launching Safe Operation Training

Timeline

PROJECT ENGINEER CUM QAQC ENGINEER

Hwa Seng Builder Pte Ltd
08.2022 - Current

SENIOR PROJECT ENGINEER

WZS Binaraya Sdn Bhd
01.2019 - 07.2022

PROJECT ENGINEER

Pesona Metro Holdings Berhad
07.2016 - 12.2018

PRODUCTION ENGINEER

HL- Manufacturing Industries Sdn Bhd
04.2015 - 06.2017

PROJECT ENGINEER

Acre Works Sdn Bhd
03.2013 - 03.2015

Bachelor of Civil Engineering (Hons) -

Infrastructure University of Kuala Lumpur (IUKL)

Diploma in Civil Engineering -

Infrastructure University of Kuala Lumpur (IUKL)

Sijil Pelajaran Malaysia (SPM) - O Levels -

SMK Kepong , FRIM
MURALI DASS