E&I QC Inspector/ Exxon Mobil -CRISP Project
SINOPCC Pte ltd
01.2024 - Current
Responsible for quality functions and to the QA/QC activities at the site for the project
QA/QC PLAN: Prepare quality procedure, inspection and test plan checklist and documentation
Raise (RFI) Request for Inspection for Instrument activities whenever these are Hold point or Witness point
Field inspection of installed equipment/materials, documentation of field report, punch list for complete works
Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry standards and drawings
Ensure that measuring & testing equipment’s is calibrated properly prior to use on test activity
Maintain all the equipment maintenance and service report for audit purpose
Calibration, loop Stimulation of field instruments like Pressure, Flow, Level, Temperature transmitters, and Pressure switches
Calibration, testing and erection of all pneumatic & smart instruments
Good knowledge about Motor Operated Valve (MOV) several types of ROTORK, LIMITORQUE and AUMA, also limit settings trouble shootings installation and calibration & maintenance
Inspecting all in time instruments as per the data- sheet and verifying at site
The operation of the same to meet the technical requirement
Trouble shooting of variable types of (Pressure, Flow, Level) Transmitters-Analogue & Digital like Yokogawa, Fisher Rosemount, ABB, Honeywell, Melanesian Displacer Type 3200, etc.
Maintenance of Pneumatic and Hydraulic equipment and Control valves (Diaphragm & Piston), Calibration of various types of valves etc.
Temperature Sensor like RTD & Thermocouple
For calibration source operations like DRUCK & FLUKE (loop calibrators), and HART COMMUNICATOR 275,375, 475 & TREX
SMART FIELD COMMUNICATOR 103S (HONEY WELL)
Electrical Wiring, Piping, Cable Laying & Panels
Control Panels Wiring and Maintenance Work of Effluent Treatment Plants, Reverse Osmosis/Desalination, Water and Waste Water Treatment Plants
Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities
Field Erection of Panels, Cable Trays, Instrument Junction Box, Power Distribution Board, Canopies Switches, Motor Operated Valve, Emergency Shut Valve, Flow Control Valve, Flow Element, Flow Orifice, Pressure Indicator, PT, FT, and LT
Interpret technical documentation like data sheet, vendor manual & trouble shoot flowchart and understand the preventive and predictive maintains principle of analyzer
Through Knowledge in Calibration of Field Mounted instrument like PT, LT, FT etc
Pressure transmitter, Flow transmitter and Temperature transmitter, Level transmitter and control valves
Troubleshoot wide range of process analyzer and water analyzer equipment using proper test equipment and diagnostics and provide documentation
Witnessing of Final Acceptance Test (FAT) for Control Valves (Make: IL, Siemens, ABB, Fisher, Mansolin, and Flowserve)
Various transmitters (Pressure, Level, Temperature and Flow) control valves, Switches, Gas Detectors and analyzer
Coordinate with Quality Control Department for Handing over all Site Related Documents submit to owner for Approval
Oversee all inspection and testing work activities
Final Checking of all Field mounted instruments against P & ID Drawings
Supervision for the installation and testing of fire alarm systems as per standard requirements
Inspection of installed electrical equipment’s as motor controllers, power & lighting panel
Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry standards and drawings
Erection, calibration, Function test and commissioning of Fire and Gas Instrument's
Familiar with Alarm PLC panels, Gas Detector's and Flame Detector's & PAGA, CCTV and ACS system Commissioning and Function test
Plant control system that is covered: Distributed Control System (DCS), Programmable Logic Controllers (PLC) for plant equipment safeguarding, Fire Detection System (FDIC), and various field instruments
Vibration Sensor
Worked on Vibration Monitoring System of Bentley Nevada 3300, 3500 series
I have good Experience of Vibration probe Installation, Probe Health Checking and Probe Characteristics checking by using TK3-2E calibrator
Instrumentation Field: Calibration, Erection, Testing & Commissioning of complete C&I works in Oil & Gas, interconnection diagram & Signal flow diagram, Analog & Digital communication
Worked on Vibration Monitoring System of Bentley Nevada 3300, 3500 series
I have good Experience of Vibration probe Installation, Probe Health Checking and Probe Characteristics checking by using TK3-2E calibrator
HART communicators (EMERSON 475, AMS TREX)
FLUKE 707 Process meter
FLUKE 754 Documenting process calibrator
Experience in shutdown valve calibration
Experience in YOKOGAWA, EMERSON DCS & SIEMENS PLC System
Conducted final inspections on completed products prior to shipment, ensuring customer satisfaction with delivered goods.
E&I QC Inspector/Linde Gas Singapore Pte.Ltd
SINOTCC (SINGAPORE) Pte Ltd
09.2021 - 09.2023
Ø Preparation of Work plan and attend daily Coordination meeting with client
Ø Coordinate with external contractors, vendors for corrective work.
Ø Responsible for quality functions and to the QA/QC activities at the site for the project.
Ø QA/QC PLAN: Prepare quality procedure, inspection and test plan checklist and documentation.
Ø Raise (RFI) Request for Inspection for Instrument activities whenever these are Hold point or Witness point.
Ø Field inspection of installed equipment/materials, documentation of field report, punch list for complete works.
Ø Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry standards and drawings.
Ø Ensure that measuring & testing equipment’s is calibrated properly prior to use on test activity.
Ø Monitor and Track Equipment breakdown history, parts replacement history.
Ø Maintain all the equipment maintenance and service report for audit purpose.
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
Ø Final Checking of all Field mounted instruments against P & ID Drawings.
Ø Witnessing of Final Acceptance Test (FAT) for Control Valves (Make: IL, Siemens, ABB, Fisher, Mansolin, and Flow Serve).
Ø Coordinate with Quality Control Department for Handing over all Site Related Documents submit to owner for Approval.
Ø Liaise with the Client Representative at site for all the quality and inspection matters.
Ø Provide continuous QC oversight or Inspections at the construction work site to verify the work is compliant with the technical requirement and general practice standards including safe execution.
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
Ø Final Checking of all Field mounted instruments against P & ID Drawings.
Ø Supervision for the installation and testing of fire alarm systems as per standard requirements
Ø Inspection of installed electrical equipment’s as motor controllers, power & lighting panels
Ø In charge in all construction work specified in the approved plan
Ø Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry standards and drawings.
Ø Ensure that measuring and testing equipment’s is calibrated properly prior to use on test activity. Supervises installation test and commissioning of power distribution s ystem MV/LV transformer, switches, standby generators and other electrical equipment.
Ø Submit daily activity reports, field clarification for any deviation and conflicts of designed andissued for construction drawings.
Ø Field Erection of Panels, Cable Trays, Instrument Junction Box, Power Distribution Board, Canopies Switches, Motor Operated Valve, Emergency Shut Valve, Flow Control Valve, Flow Element, Flow Orifice, Pressure Indicator, PT, FT, and LT.
Ø Coordinate with Quality Control Department for Handing over all Site Related Documents submit to owner for Approval.
Ø Oversee all inspection and testing work activities.
Ø Liaise with the Client Representative at site for all the quality and inspection matters.
Ø Provide continuous QC oversight or Inspections at the construction work site to verify the work is compliant with the technical requirement and general practice standards including safe execution.
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
E&I Engineer
ONYO Engineering Pte Ltd
10.2019 - 08.2021
Ø Coordinate with external contractors, vendors for corrective work.
Ø Responsible for quality functions and to the QA/QC activities at the site for the project.
Ø QA/QC PLAN: Prepare quality procedure, inspection and test plan checklist and documentation.
Ø Raise (RFI) Request for Inspection for Instrument activities whenever these are Hold point or Witness point.
Ø Field inspection of installed equipment/materials, documentation of field report, punch list for complete works.
Ø Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry standards and drawings.
Ø Ensure that measuring & testing equipment’s is calibrated properly prior to use on test activity.
Ø Monitor and Track Equipment breakdown history, parts replacement history.
Ø Maintain all the equipment maintenance and service report for audit purpose.
Ø Calibration, loop Stimulation of field instruments like Pressure, Flow, Level, Temperature transmitters, and Pressure switches.
Ø Calibration, testing and erection of all pneumatic & smart instruments
Ø Good knowledge about Motor Operated Valve (MOV) several types of ROTORK, LIMITORQUE and AUMA, also limit settings trouble shootings installation and calibration& maintenance.
Ø Inspecting all in time instruments as per the data- sheet and verifying at site. The operation of the same to meet the technical requirement
Ø Trouble shooting of variable types of (Pressure, Flow, Level) Transmitters-Analogue & Digital like Yokogawa, Fisher Rosemount, ABB, Honeywell, Mansoneilan Displacer Type 3200, etc.
Ø Maintenance of Pneumatic and Hydraulic equipment and Control valves (Diaphragm & Piston), Calibration of various types of valves etc. Temperature Sensor like RTD & Thermocouple (Labom, Altop)
Ø For calibration source operations like DRUCK & FLUKE (loop calibrators), and HART COMMUNICATOR 275,375, 475 & TREX. SMART FIELD COMMUNICATOR 103S (HONEY WELL)
Ø Excavation Works for Erection and Installation of Electrical Cables
Ø Control Panels Wiring and Maintenance Work of Effluent Treatment Plants, Reverse Osmosis/Desalination, Demineralization, Water and Waste Water Treatment Plants
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
Ø Field Erection of Panels, Cable Trays, Instrument Junction Box, Power Distribution Board, Canopies Switches, Motor Operated Valve, Emergency Shut Valve, Flow Control Valve, Flow Element, Flow Orifice, Pressure Indicator, PT, FT, and LT.
Ø Final Checking of all Field mounted instruments against P & ID Drawings.
Ø Through Knowledge in Calibration of Field Mounted instrument like PT, LT, FT etc.
Ø Experience in cable segregation and carrying out the cabling and tubing work in the field as well.
Ø Perform Instrument & Control activities as per drawings, specifications and project documents in accordance with the project field procedures.
Ø Witnessing of Final Acceptance Test (FAT) for Control Valves (Make: IL, Siemens, ABB, Fisher, Mansolin, and Flow Serve).
Ø Coordinate with Quality Control Department for Handing over all Site Related Documents submit to owner for Approval.
Ø Liaise with the Client Representative at site for all the quality and inspection matters.
Ø Provide continuous QC oversight or Inspections at the construction work site to verify the work is compliant with the technical requirement and general practice standards including safe execution.
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
Ø Final Checking of all Field mounted instruments against P & ID Drawings.
Ø Supervision for the installation and testing of fire alarm systems as per standard requirements
Ø Inspection of installed electrical equipment’s as motor controllers, power & lighting panels
Ø In charge in all construction work specified in the approved plan
Ø Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry standards and drawings.
Ø Ensure that measuring and testing equipment’s is calibrated properly prior to use on test activity. Supervises installation test and commissioning of power distribution system MV/LV transformer, switches, standby generators and other electrical equipment.
Ø Submit daily activity reports, field clarification for any deviation and conflicts of designed and issued for construction drawings.
Ø Field Erection of Panels, Cable Trays, Instrument Junction Box, Power Distribution Board, Canopies Switches, Motor Operated Valve, Emergency Shut Valve, Flow Control Valve, Flow Element, Flow Orifice, Pressure Indicator, PT, FT, and LT.
Ø Coordinate with Quality Control Department for Handing over all Site Related Documents submit to owner for Approval.
Ø Oversee all inspection and testing work activities.
E&I QC Supervisor/KNPC - AGRP Project
GULF SPIC General Trading & Contracting W.L.L
05.2018 - 09.2019
Ø Responsible for quality functions and to the QA/QC activities at the site for the project.
Ø QA/QC PLAN: Prepare quality procedure, inspection and test plan checklist and documentation.
Ø Raise (RFI) Request for Inspection for Instrument activities whenever these are Hold point or Witness point.
Ø Field inspection of installed equipment/materials, documentation of field report, punch list for complete works.
Ø Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry standards and drawings.
Ø Ensure that measuring & testing equipment’s is calibrated properly prior to use on test activity.
Ø Maintain all the equipment maintenance and service report for audit purpose.
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
Ø Witnessing of Final Acceptance Test (FAT) for Control Valves (Make: IL, Siemens, ABB, Fisher, Mansolin, and FlowServe).Various transmitters (Pressure, Level, Temperature and Flow) control valves, Switches, Gas Detectors and analyzer.
Ø Coordinate with Quality Control Department for Handing over all Site Related Documents submit to owner for Approval.Oversee all inspection and testing work activities.
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
Ø Final Checking of all Field mounted instruments against P & ID Drawings.
Ø Supervision for the installation and testing of fire alarm systems as per standard requirements
Ø Inspection of installed electrical equipment’s as motor controllers, power & lighting panel
Ø Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry
standards and drawings. Erection, calibration, Function test and commissioning of Fire and Gas Instrument's,
E&I QC Inspector/ BLNG COGEN II Project
McCONNEL DOWELL SDN BHD
01.2016 - 03.2018
Ø Preparation of Work plan and attend daily Coordination meeting with client
Ø Coordinate with external contractors, vendors for corrective work.
Ø Responsible for quality functions and to the QA/QC activities at the site for the project.
Ø QA/QC PLAN: Prepare quality procedure, inspection and test plan checklist and documentation.
Ø Raise (RFI) Request for Inspection for Instrument activities whenever these are Hold point or Witness point.
Ø Field inspection of installed equipment/materials, documentation of field report, punch list for complete works.
Ø Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry standards and drawings.
Ø Ensure that measuring & testing equipment’s is calibrated properly prior to use on test activity.
Ø Monitor and Track Equipment breakdown history, parts replacement history.
Ø Maintain all the equipment maintenance and service report for audit purpose.
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
Ø Final Checking of all Field mounted instruments against P & ID Drawings.
Ø Witnessing of Final Acceptance Test (FAT) for Control Valves (Make: IL, Siemens, ABB, Fisher, Mansolin, and Flow Serve).
Ø Coordinate with Quality Control Department for Handing over all Site Related Documents submit to owner for Approval.
Ø Liaise with the Client Representative at site for all the quality and inspection matters.
Ø Provide continuous QC oversight or Inspections at the construction work site to verify the work is compliant with the technical requirement and general practice standards including safe execution.
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
Ø Final Checking of all Field mounted instruments against P & ID Drawings.
Ø Supervision for the installation and testing of fire alarm systems as per standard requirements
Ø Inspection of installed electrical equipment’s as motor controllers, power & lighting panels
Ø In charge in all construction work specified in the approved plan
Ø Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry standards and drawings.
Ø Ensure that measuring and testing equipment’s is calibrated properly prior to use on test activity. Supervises installation test and commissioning of power distribution s ystem MV/LV transformer, switches, standby generators and other electrical equipment.
Ø Submit daily activity reports, field clarification for any deviation and conflicts of designed andissued for construction drawings.
Ø Field Erection of Panels, Cable Trays, Instrument Junction Box, Power Distribution Board, Canopies Switches, Motor Operated Valve, Emergency Shut Valve, Flow Control Valve, Flow Element, Flow Orifice, Pressure Indicator, PT, FT, and LT.
Ø Coordinate with Quality Control Department for Handing over all Site Related Documents submit to owner for Approval.
Ø Oversee all inspection and testing work activities.
Ø Liaise with the Client Representative at site for all the quality and inspection matters.
Ø Provide continuous QC oversight or Inspections at the construction work site to verify the work is compliant with the technical requirement and general practice standards including safe execution.
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
Conducted final inspections on completed products prior to shipment, ensuring customer satisfaction with delivered goods.
E&I Engineer
Nasser Alhajri Corporation (N.S.H)
10.2013 - 11.2015
Ø Coordinate with Quality Control Department for Handing over all Site Related Documents submit to owner for Approval.
Ø Oversee all inspection and testing work activities.
Ø Liaise with the Client Representative at site for all the quality and inspection matters.
Ø Provide continuous QC oversight or Inspections at the construction work site to verify the work is compliant with the technical requirement and general practice standards including safe execution.
Ø Coordination with Senior Engineer and Preparation of QAP, Quality Control Procedures, ITP for all Electrical and Instrumentation Activities.
Ø Final Checking of all Field mounted instruments against P & ID Drawings.
Ø Supervision for the installation and testing of fire alarm systems as per standard requirements
Ø Inspection of installed electrical equipment’s as motor controllers, power & lighting panels
Ø In charge in all construction work specified in the approved plan
Ø Site activity inspection and monitoring to ensure compliance with approved procedures, specifications, industry standards and drawings.
Ø Ensure that measuring and testing equipment’s is calibrated properly prior to use on test activity.
Ø Submit daily activity reports, field clarification for any deviation and conflicts of designed andissued for construction drawings.
Ø Bus-bar with 415V power supply to carry out the functional check ofthe modules.
Ø Relay setting and parameterization. Secondary current injection for relay functional test (for ACBpanels)
Ø Trouble shooting of the modules and cubicles, loop-checking for the interfacing cables.
Ø Testing of Lighting Transformers, lighting distribution boards [Emergency & Normal].
Ø Preparation of pre commissioning check lists, test reports, as built drawings, preparing and maintaining the records of commissioning details.
Ø Testing &commissioning over current, over voltage, earth fault relays, motor management relays, transformer protection relays, under voltage relays, over voltage relays use secondary injection set
Ø Testing for primary injection test for CT, bus bar conduct resistance, bus bar hipot, 6.6kv HT, LT,panel testing, and cable hi-pot.
Ø Commissioning for panel function check, troubleshooting, panel wiring modification.
Ø Testing for transformer buchholz relay, pressure alarm, temperature alarm, & function, VFD, MCC, UPS, 24&110vdc Battery charger, Switchgear, PHF, Capacitor Bank and penstock testing with SCADA, PLC.
Ø Preparation of pre commissioning check lists, test reports, as built drawings, preparing and maintaining the records of commissioning details.
Ø Testing of MV switchgear and MCC panels - insulation resistance test for main bus bar, ductor test of main bus (end to end) (contact resistance test).
E&I Technician/ Saudi Aramco Offshore Hookup ECD
Zamil Offshore Services Co
09.2012 - 09.2013
Ø Field Erection of Panels, Cable Trays, Instrument Junction Box, Power Distribution Board, Canopies Switches, Motor Operated Valve, Emergency Shut Valve, Flow Control Valve, Flow Element, Flow Orifice, Pressure Indicator, PT, FT, and LT.
Ø Final Checking of all Field mounted instruments against P & ID Drawings.
Ø Through Knowledge in Calibration of Field Mounted instrument like PT, LT, FT etc.
Ø Experience in cable segregation and carrying out the cabling and tubing work in the field as well.
Ø Bus-bar with 415V power supply to carry out the functional check of the modules.
Ø Relay setting and parameterization. Secondary current injection for relay functional test (for ACB panels)
Ø Trouble shooting of the modules and cubicles, loop-checking for the interfacing cables.
Ø Preparation of pre commissioning check lists, test reports, as built drawings, preparing and maintaining the records of commissioning details.
Ø Testing &commissioning over current, over voltage, earth fault relays, motor management relays, transformer protection relays, under voltage relays, over voltage relays use secondary injection set
Education
Bachelor of Engineering B.E - Electronics & Communication Engineering
Anna University
Tamilnadu-India
01.2008
Diploma Electrical and Electronics Engineering (DEEE) -
State Board of Technical Education
Tamil Nadu-India
01.2005
Skills
ANSI
NFPA70NEC
NEMA
IEEE
IEC
Inspections
Compliance
Technical Troubleshooting
Control Systems
Process Instrument Interface Loop Checks
ATEX
Ex-Inspection
Languages
English
Tamil
Hindi
Disclaimer
I hereby declare that all statements made above are true and correct to the best of my knowledge and belief.
Personal Information
Passport Number: R9011801
Date of Birth: 06/15/85
Gender: Male
Nationality: Indian
Marital Status: Married
Certification
Ex Inspection Awareness Course
Principles of Explosion-Protection
Hazardous Area Classification
Standards, Certification & Marking
Protection Method - Increased Safety Ex 'e'
Protection Method - Increased Safety Ex 'i'
Protection Method - Increased Safety Ex 'd'
Timeline
E&I QC Inspector/ Exxon Mobil -CRISP Project
SINOPCC Pte ltd
01.2024 - Current
E&I QC Inspector/Linde Gas Singapore Pte.Ltd
SINOTCC (SINGAPORE) Pte Ltd
09.2021 - 09.2023
E&I Engineer
ONYO Engineering Pte Ltd
10.2019 - 08.2021
E&I QC Supervisor/KNPC - AGRP Project
GULF SPIC General Trading & Contracting W.L.L
05.2018 - 09.2019
E&I QC Inspector/ BLNG COGEN II Project
McCONNEL DOWELL SDN BHD
01.2016 - 03.2018
E&I Engineer
Nasser Alhajri Corporation (N.S.H)
10.2013 - 11.2015
E&I Technician/ Saudi Aramco Offshore Hookup ECD
Zamil Offshore Services Co
09.2012 - 09.2013
Bachelor of Engineering B.E - Electronics & Communication Engineering
Anna University
Diploma Electrical and Electronics Engineering (DEEE) -
State Board of Technical Education
Similar Profiles
Pankaj Sunny RaiPankaj Sunny Rai
Sales Director at Quality Air Solutions Pte Ltd / Yihui Metals Pte LtdSales Director at Quality Air Solutions Pte Ltd / Yihui Metals Pte Ltd
ACCOUNTS EXECUTIVE at SRS Integrated System Pte Ltd, and YNY Design + Construction Pte LtdACCOUNTS EXECUTIVE at SRS Integrated System Pte Ltd, and YNY Design + Construction Pte Ltd