Summary
Overview
Work History
Education
Skills
References
Timeline
Generic
Mohd Ridzwan Bin Md Norahim

Mohd Ridzwan Bin Md Norahim

Senior Engineer SEAL Deterrence SDE
Petaling Jaya

Summary

Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

13
13
years of professional experience

Work History

Senior Engineer (SEAL Deterrence Selangor)

TNB
03.2021 - Current
  • Analyze load pattern and event to identify irregularities metering system or meter tempering.
  • Approve technical report on irregularities and tempering cases.
  • Carried out site investigation on irregularities ie. Voltage transformer High Risk Customer (HRC) cases.
  • Installation and maintenance of Feeder Meter and ensure all feeder meter reading are analyzed and discrepancies are investigated and action were taken.
  • Installation/Maintenance of PMU/PPU metering system on all incoming and outgoing MV feeders.
  • Implementing new secure metering panel with high security features to deter MIT cases on LV LPC.
  • Relocation metering system for LPC and creating backup metering system for the purpose of energy balancing audit and data for back billing.
  • Coordinate meeting with respective division/district/state/unit for feeder meter related work, CT accuracy verification, shifting of TTB and relocating metering system.
  • Approve inspection form and update system BCRM and analytic system.
  • Perform mandatory disconnection in order to deter repeated MIT cases.
  • Accountable to review Standard Operating Procedure for Metering.
  • Ensure all the staff under my supervision area comply to Health, Safety and Environment Law, regulation and internal procedure as well as ISO 9001 and ISO 55001.
  • Managing Purchase Order (PO) awarded to mandatory disconnection contractors under Kerja-kerja Bumiputera (KKB) and also evaluating contractors performance from time to time.

Senior Engineer (Metering MVHV - Selangor)

TNB
10.2016 - 03.2021
  • Responsible to provide analysis of load profile data and events.
  • Responsible for complete and correct installation, maintenance, verification and fault rectification of high voltage and medium voltage metering system and communication module at consumer premises, TNB Main Intake Substations, TNB power stations, Independent Power Producer power stations, renewable energy projects and border meters.
  • Responsible for complete and correct installation, maintenance, verification and fault rectification of high voltage and medium voltage metering system and communication module at consumer premises, TNB Main Intake Substations, TNB power stations, Independent Power Producer power stations, renewable energy projects and border meters.
  • Responsible to implement and comply to MS ISO / IEC 17025, MS ISO 9001 and MS ISO 55001.
  • Responsible for operation progress and performance reports.
  • Accountable for Service Order (SO) approval related to new installation, upgrading and meter changes.
  • Finalize metering system configuration at site
  • Monitor and investigate complaints including completion of related SO
  • Manage budget, staff and resources.
  • Implement latest technology in metering system.
  • Engage with local government authorities and local TNB management.

Engineer (Remote Meter Reading RMR & Smart Meter - Metro)

TNB
10.2014 - 10.2016
  • Perform on site RMR equipment troubleshooting.
  • Supervise/maintained previously completed RMR Phase 3 Project nearly 800 Ordinary Power Consumer (OPC) and 100,000 Low voltage consumers.
  • Continued RMR Phase 3A project for new appointed customer.
  • Migration of RMR Phase 3 equipment to latest GPRS Phase 3A RMR equipment.
  • Manage a total of 46 teams to install and maintain RMR equipment for Selangor and KL region.
  • To ensure all equipment installed are able to communicate with our Data Centre through Meter Software, Hyper Terminal Software and Itron EE Software.
  • Plan routine maintenance being done twice monthly to rectify problems at site such as meters failed to respond due to wrong communication password, simcard failed to recognize, modems operate under low gain antenna any damage equipment and also any breakdown happened at site.
  • Complete on-site testing for new modem before being evaluate to be use for TNB’s meter.
  • Pilot project of RMR Phase 3 Project which was to expand the RMR billing for Ordinary Power Consumer. Completed nearly 10,000 consumers.

Engineer (Device Operation - Pulau Pinang/Kedah/Perlis)

TNB
05.2013 - 10.2014
  • Responsible to ensure meters are installed or removed at / from consumer premise timely.
  • Manage and execute yearly 25% Conditional Based Maintenance as to comply the regulation which is all meters shall be operate within 3% of error.
  • Appointed of committee member in developing Aged Meter Replacement SOP for nationwide.
  • Generate Work Order (WO) and assigned to 10 teams reported under myself.
  • Accountable by checking and approved WO submitted from team.
  • Attending sites with team as to ensure all safety requirements are followed by each team.
  • Responsible for Daily Review Meeting and report to top management.
  • Ensuring all meters with RMR equipment are able to generate Load Profile.
  • Ensuring consumers, contractors and consultant follows Electrical Supply Application Handbook (ESAH) Version 2.0
  • Engagement with local government authorities and respective departments in TNB.
  • Ensure all equipment and resources to staff are sufficient, in good condition, safe and reliable.
  • Explore and adapt o TNB’s new consumer data system which is Billing and Customer Relationship Management (BCRM) system and being one of Subject Matter Expert regarding this system.
  • Accountable to review Standard Operating Procedure (SOP) for Metering.
  • Directly involved in TNB Metering “Value Unlocking Programme” restructuring initiative.
  • Give briefing and train Meter Readers to take correct reading accordingly.

Engineer (Remote Meter Reading RMR & Smart Meter - Metro)

TNB
07.2011 - 05.2013
  • Perform on site RMR equipment troubleshooting.
  • Supervise/maintained previously completed RMR Phase II Project nearly 18,000 Low voltage consumers.
  • Completed/continued RMR Phase 2B project for the remaining 10,000 Low Voltage Consumers.
  • Migration of RMR Phase II equipment to latest GPRS Phase 2B RMR equipment.
  • Manage a total of 23 teams to install and maintain RMR equipment for Selangor and KL region.
  • To ensure all equipment installed are able to communicate with our Data Centre through Meter Software, Hyper Terminal Software and Itron EE Software.
  • Plan routine maintenance being done twice monthly to rectify problems at site such as meters failed to respond due to wrong communication password, simcard failed to recognize, modems operate under low gain antenna any damage equipment and also any breakdown happened at site.
  • Complete on site testing for new modem before being evaluate to be use for TNB’s meter.
  • Pilot project of RMR Phase 3 Project which was to expand the RMR billing for Ordinary Power Consumer. Completed nearly 1,000 consumers.

Education

Bachelor of Engineering - Electrical Power

UNICERSITI TEKNOLOGI MALAYSIA
MALAYSIA
04.2001 -

Skills

  • Leadership - Expert
  • Agile & scrum - Advance
  • Business Process Improvement - Expert
  • Skill in Keynote, MS Office - Expert
  • Project scheduling - Advance
  • Strategic Planning - Intermediate
  • Communication skill - Expert

References

TNB Annex PJ, +6 03-7955 2121

Timeline

Senior Engineer (SEAL Deterrence Selangor)

TNB
03.2021 - Current

Senior Engineer (Metering MVHV - Selangor)

TNB
10.2016 - 03.2021

Engineer (Remote Meter Reading RMR & Smart Meter - Metro)

TNB
10.2014 - 10.2016

Engineer (Device Operation - Pulau Pinang/Kedah/Perlis)

TNB
05.2013 - 10.2014

Engineer (Remote Meter Reading RMR & Smart Meter - Metro)

TNB
07.2011 - 05.2013

Bachelor of Engineering - Electrical Power

UNICERSITI TEKNOLOGI MALAYSIA
04.2001 -
Mohd Ridzwan Bin Md NorahimSenior Engineer SEAL Deterrence SDE