Perform incoming test/intial test before overhaul and identify which part need to repair or replaces
Perform static test ,measure the vibration ,monitor the temparature when perform solo run after motor overhaul
Perform witness test with customer before motor delivery
Prepare intial and final report
Troubleshoot any issues at site regarding motor such as vibration.
Service Engineer /Testing Engineer
ABB Pte Ltd
08.2023 - 10.2024
Perform incoming test/intial test before overhaul and identify which part need to repair or replaces
Perform static test ,measure the vibration ,monitor the temparature when perform solo run after motor overhaul
Perform witness test with customer before motor delivery
Prepare intial and final report
Troubleshoot any issues at site regarding motor such as vibration.
Commisioning and Testing Engineer
Siemens (M) Sdn Bhd
12.2018 - 07.2023
Perform commissioning new motor at customer site and troubleshoot any issues that related such as lube oil piping
Cable termination,coupling issues and base termination issues
Perform witness test with customer and ensure the motor in good condition before delivery
Troubleshoot any issues at customer site such for motor ,transformer and generator
Project Engineer
Elektro Serve (M) Sdn Bhd
01.2012 - 12.2018
Electrical and maintenance
Responsible for updating work schedule, planning and monitor of the standard
Preparing and submit the proposal with estimated cost and schedule for electrical such as Service & maintenance of LV Motor,Transformer ,Alternator and other job
Manpower Arrangment, budgetary cost ,tools and equipment for many Major Shutdown at Sarawak and Terangganu
Technical Development in Electric Motor Testing
Back-up for Sales Department for LV Motor and HV Motor
Education
DIPLOMA OF TECHNOLOGY ELECTRICAL - CGPA 2.80
UTHM
BACHELOR OF ELECTRICAL ENGINEERING WITH HONORS - CGPA 2.88
UTHM
Skills
Technical support
Custom
Motor servicing & overhaul during KR1 and KR2 shutdown, 10/01/14, PPTSB
Servicing HT Cooler Water Pump, 11/01/14, PCFKSB
Axial Centery for Extruder Motor, 01/01/15, PM-2-AM-8400-PCPMSB
Repairing and overhaul Portable Diesel Generator, 01/01/15, EMEPMI
Repairing and overhaul of Solar Generator 7Mwatt, 01/01/15, EMEPMI
Repairing and rewinding of Electrical Motor, 02/01/15, EMEPMI
Service and commissioning of Alternator at Tiong A Platform, 03/01/15, PCSB(PMO)
Load Bank Test for Generator, 03/01/15, PCEMSB
LV motor overhaul during Turnaround, 04/01/15, PCPMSB
SWLP pump servicing, 06/01/15, PCSB(PMO)
HT and LV motor servicing & testing at MTBE/PS PLANT, 05/01/15
Provision of services electrical motor, alternator and transformer HT & LV, 01/01/16, SKO PCSB
Involve major and pit stop MLNG Turnaround from module 1 until Train 9 plant, 01/01/17
Commissioning 2 unit 10MW Sychronous motor at Train 9 MLNG Petronas Bintulu Sarawak, 03/01/23
Commissioning 18MW induction motor at FPSO LIZA Destiny Keppel Shipyard Singapore, 12/01/19, (Exxon)
Troubleshoot 25MW Sychronous motor at Famosa Vietnam, 10/01/22
Certification
Certificate of Assessment, The Association of Electrical & Mechanical Trades, Mohamad Syahir Bokari, Online Ex Repair Refresher, 10/21/24, 10/21/27
Custom
850602-01-6095
Personal Information
Age: 39
Timeline
Service Engineer /Testing Engineer
CSM Marine Pte Ltd
10.2024 - Current
Service Engineer /Testing Engineer
ABB Pte Ltd
08.2023 - 10.2024
Commisioning and Testing Engineer
Siemens (M) Sdn Bhd
12.2018 - 07.2023
Project Engineer
Elektro Serve (M) Sdn Bhd
01.2012 - 12.2018
BACHELOR OF ELECTRICAL ENGINEERING WITH HONORS - CGPA 2.88