Summary
Overview
Work History
Education
Skills
Personal Information
Certification
Timeline
Generic

Masita Dewi

Technical Project Manager

Summary

Passionate about the construction industry with a problem-solving mindset and a detail-oriented team player. Strong organizational skills and ability to handle multiple projects simultaneously. Knowledge across various trades. Eager to improve and learn, constantly seeking new opportunities for growth and development.

Overview

12
12
years of professional experience
22
22
years of post-secondary education
8
8
Certifications
3
3
Languages

Work History

Technical Project Manager

Vector Foiltec Pte Ltd
10.2024 - Current
  • Company Overview: Vector Foiltec is the first designer, manufacturer and installer of the ETFE (Ethylene tetrafluoroethylene) cladding system with eighteen offices around the world. Our Singapore office have a headcount of about 10 people and we are trained to be multi taskers to complete a project. The project undertaken by us not only focuses on ETFE but also involves steel structure and M&E item such as Jet Fans, lightings, AV System, etc.
  • With years of on-field and dealing directly with on-site issues, I have vast knowledge with the required details during the design stage and able to give technical solutions and suggestion to the site team.
  • Vector Foiltec is the first designer, manufacturer and installer of the ETFE (Ethylene tetrafluoroethylene) cladding system with eighteen offices around the world. Our Singapore office have a headcount of about 10 people and we are trained to be multi taskers to complete a project. The project undertaken by us not only focuses on ETFE but also involves steel structure and M&E item such as Jet Fans, lightings, AV System, etc.

Junior Project Manager

Vector Foiltec Pte Ltd
08.2021 - 09.2024
  • Company Overview: Vector Foiltec is the first designer, manufacturer and installer of the ETFE (Ethylene tetrafluoroethylene) cladding system with eighteen offices around the world. Our Singapore office have a headcount of about 10 people and we are trained to be multi taskers to complete a project. The project undertaken by us not only focuses on ETFE but also involves steel structure and M&E item such as Jet Fans, lightings, AV System, etc.
  • Took up the challenge to manage a project from start to finish.
  • Projects:
  • Resorts World Sentosa Refurbishment – Replacement of existing ETFE Canopy with a new darker shade ETFE to improve the thermal comfort of the space. Involves as-built surveys of the existing structure to improve the water drainage and additional supports for Work-at height anchor points.
  • CQ @ Clarke Quay Taxi Stand – An A&A project with a new built structure with ETFE. Involves design, supply & installation of new taxi stand steel structure and ETFE cushion. Challenging aspect of the project includes planning the steel erection works with space constraints.
  • One Holland Village – Involves erection of long span structure with a 500 ton crane. It was a fast-track project awarded to vector Foiltec a few months before the TOP. Delivered the project within the timeline.
  • McDonalds at Choa Chu Kang Park – Supply and Install ETFE Façade on a standalone McDonalds outlet. Supported the client’s steel contractor to install the steel subframe within the allowable tolerances even though it was not part of the scope of work.
  • Surbana Jurong Campus – Design, supply install ETFE canopy on cable structures. Project commenced during the covid period, and the steel cable specialist was unable to come to Singapore to assist on the erection of the structure. I lead the local team to install the cable structure as per the method statement. The project requires attention to details and sensitive to tolerances. The team installed the structure and ETFE without major issues.
  • Ten Square Building- Involves installing long pieces of ETFE cushion along the building façade. The installation had to be vary mindful of the wind during installation and the gondola used to install need to be strategically placed to avoid any disruptions during the installation works.
  • Vector Foiltec is the first designer, manufacturer and installer of the ETFE (Ethylene tetrafluoroethylene) cladding system with eighteen offices around the world. Our Singapore office have a headcount of about 10 people and we are trained to be multi taskers to complete a project. The project undertaken by us not only focuses on ETFE but also involves steel structure and M&E item such as Jet Fans, lightings, AV System, etc.

Design Coordinator

Vector Foiltec Pte Ltd
11.2017 - 07.2021
  • Company Overview: Vector Foiltec is the first designer, manufacturer and installer of the ETFE (Ethylene tetrafluoroethylene) cladding system with eighteen offices around the world. Our Singapore office have a headcount of about 10 people and we are trained to be multi taskers to complete a project. The project undertaken by us not only focuses on ETFE but also involves steel structure and M&E item such as Jet Fans, lightings, AV System, etc.
  • Coordinate design works between the different trades including steel works, M&E and architectural finishes.
  • Projects:
  • Bukit Jalil Mall Mega Canopy – Includes steelwork, ETFE, lighting, AV System, ventilation fans.
  • Penang Aspen High Street Canopy – Includes steelwork and ETFE.
  • Hong Kong Ocean Park Canopy – Includes ETFE and smoke Vents.
  • Jewel Eyebrow, Trolley & Lift Canopy – Includes Steelwork and ETFE.
  • Vector Foiltec is the first designer, manufacturer and installer of the ETFE (Ethylene tetrafluoroethylene) cladding system with eighteen offices around the world. Our Singapore office have a headcount of about 10 people and we are trained to be multi taskers to complete a project. The project undertaken by us not only focuses on ETFE but also involves steel structure and M&E item such as Jet Fans, lightings, AV System, etc.

Draftsman

Prime Structures Engineering Pte Ltd
10.2015 - 10.2017
  • Projects:
  • Micron Building
  • SP Powers North-South Transmission Cable Tunnel
  • Marina Bay Sands Digital Rink

Draftsman

ACE PLP
07.2013 - 09.2015
  • Projects:
  • Singapore Sports Hub
  • National Centre for Infectious Diseases
  • The Pines Hotel

Education

Bachelor of Building and Project Management -

Singapore University of Social Sciences
04.2001 - 10.2023

Diploma in Business Process and Quality Engineering - undefined

Ngee Ann Polytechnic

Diploma Plus in Decision Management - Quality

Ngee Ann Polytechnic

Skills

Microsoft Office

Autodesk Autocad 2D/3D

undefined

Personal Information

  • Date of Birth: 05/15/89
  • Gender: Female
  • Nationality: Singaporean

Certification

Autocad 2D/3D

Timeline

Technical Project Manager

Vector Foiltec Pte Ltd
10.2024 - Current

Junior Project Manager

Vector Foiltec Pte Ltd
08.2021 - 09.2024

Design Coordinator

Vector Foiltec Pte Ltd
11.2017 - 07.2021

Draftsman

Prime Structures Engineering Pte Ltd
10.2015 - 10.2017

Draftsman

ACE PLP
07.2013 - 09.2015

Bachelor of Building and Project Management -

Singapore University of Social Sciences
04.2001 - 10.2023

Diploma in Business Process and Quality Engineering - undefined

Ngee Ann Polytechnic

Diploma Plus in Decision Management - Quality

Ngee Ann Polytechnic
Masita DewiTechnical Project Manager