Summary
Overview
Work History
Education
Skills
Timeline
Generic
M ARIVAZHAGAN  ARI

M ARIVAZHAGAN ARI

Summary


I. As a Drafter

» Draw the submission drawing to the client and shop drawing for project teams

» Coordinate with senior design engineer for latest up-to-date changes of design drawing

» Coordinate & corporate with counterparts (Architecture, Electrical Engineer )

» Check on site with drawings and coordinate with Site Engineers

» Prepare M&E Services Drawings using Auto CAD

» Drafting Presentation such as Layout, Schematic, Details

» Draft for Plan, Schematic, Detail of Design concepts » Checking and preparing for Submission Drawings


II.As a Quantity Surveyor Cum Document Controller


» Send quotation to equipment suppliers for tender submission.

» Assist QS in taking tender and claim money

» Preparing and computing detail estimate and bill of quantities for project cost and actual quantities for material control

» Preparing documents and managing payment to sub contractor

» Inquiring the latest price of materials to obtain the best and reasonable price

» Ordering to get materials to meet the requirements of working procedures

» Comparing the quotations, selecting competitive prices and summarizing sub-contracts, materials and equipment

» Checking the bill from site and making summary of all bills and comparing actual cost & estimated cost

» Compile and collect all information and documents for claim and prepare weekly and monthly reports to project manager

Overview

4
4
years of professional experience

Work History

Electrical Engineer

KMY ELECTRICAL ENGINEERING PTE LTD.
10.2021 - Current
  • Prepared material and quantity takeoff of structural, architectural, and external work quantities.
  • Prepared costs control and budget allocation, monthly progress claims, and variations/change orders, Comparative Analysis.
  • Prepared bill of quantities for tender purposes; tender preparation and unit cost build-up.
  • Evaluated sub-contractors' claims and preparation of interim certificates of payments.
  • Prepared variation order documents and analysis, final payments, and final accounts settlement with sub-contractor.
  • Composed written communications to update main contractors/administrators/end-users of project status.
  • Printed, assembled, and send bid documents for copying for distribution to prospective bidders Prepare building appraisals for residential and commercial buildings.
  • Created CAD models and drawings for 2D designs.

Fiber Optic Installer

3CELL PTE LTD.
05.2019 - 08.2020
  • Adhered to safety policies and procedures to install or remove IP set-top devices, optical network terminals and wireless access points.
  • Performed troubleshooting and equipment testing to identify and correct problems end to end and network-wide.
  • Conducted site surveys to validate customer's infrastructure deliverables.
  • Planned layouts and ran cable into buildings and through walls, attics, and crawl spaces.
  • Self-motivated, with a strong sense of personal responsibility.

Education

Bachelor of Engineering - Electrical And Electronics Engineering

MOOKAMBIGAI COLLEGE OF ENGINEERING
TAMILNADU,INDIA
04.2016

Skills

  • Extensive AutoCAD Knowledge
  • Microsoft Excel & Word
  • Microsoft PowerPoint
  • Highly Skilled in 2D CAD
  • Class 3 driving license singapore
  • BCSS

Timeline

Electrical Engineer

KMY ELECTRICAL ENGINEERING PTE LTD.
10.2021 - Current

Fiber Optic Installer

3CELL PTE LTD.
05.2019 - 08.2020

Bachelor of Engineering - Electrical And Electronics Engineering

MOOKAMBIGAI COLLEGE OF ENGINEERING
M ARIVAZHAGAN ARI