Pursuing full-time role that presents professional challenges and leverages interpersonal skills, effective time management, and problem-solving expertise.
Overview
15
15
years of professional experience
1
1
Certification
Work History
Lab Quality Engineer
Fugro Marine Singapore
03.2025 - Current
Enhanced product quality by implementing rigorous testing protocols that addressed previously undetected issues.
Initiated preventive maintenance schedule for equipment, reducing downtime and maintaining consistent production quality.
Documented and developed engineering procedures and processes.
Guided transition to new quality management system, minimizing disruption and aligning with best practices in industry.
Lab Engineer
SA Geolab International Pte Ltd
07.2018 - 02.2025
Streamlined laboratory processes by strategically designing a testing regime, ensuring consistent quality test results were delivered on time, enhancing overall project outcomes
Conducted a wide variety of soil investigative tests ranging from simple unconsolidated undrained test to advanced tests such as Resonant Column, Bender Element and Cyclic triaxial tests using GDS testing systems
Familiar with the verification and calibration of precision instruments such as the pore pressure transducer and the load measuring device
Regularly mainted a inventory list of laboratory equipment which became very useful during the annual ISO accreditation
Reduced error rates through regular calibration and maintenance of laboratory instruments.
Consistently provided reliable findings through rigorous attention to detail while conducting tests.
Troubleshot technical issues efficiently to minimize disruptions to ongoing projects and maintain tight deadlines.
Assistant Engineer
Daifuku Mechatronics S Pte Ltd
12.2016 - 06.2018
Responsible for building of Automated Storage & Retrieval Systems (ASRS) from the ground up, at project sites in different parts of Singapore
Plan the flow of work through different stages of the project, from installation to testing & commissioning, product training and the handover to client
Contributed to successful project completion by assisting with on-site inspections, testing, and quality control measures.
Provided technical assistance to staff when needed.
Collaborated closely with clients to define requirements, address concerns, and provide updates on project status throughout each phase of work.
Improved communication between team members by creating clear project documentation and updating progress reports regularly.
Work at height experienced
Mechanical Engineering Intern
Pratt & Whitney Component Solutions
01.2015 - 05.2015
Industrial Attachment during third year of degree programme
Worked on the Shrouds for the PW4000 Turbofan engine
Assisted Repair Process Engineers in developing repair capabilities of the engine components