Summary
Overview
Work History
Education
Skills
Languages known
Extracurricular activities:
Profile summary:
Roles and Responsibilities:
Timeline
Generic
M. BASKAR RAJ

M. BASKAR RAJ

Srivilliputtur

Summary

Seeking a challenging and dynamic role in a growing organization that offers ample opportunities to utilize professional skills and knowledge. Looking to embark on a fulfilling career that allows continuous enhancement of expertise and achievement of personal growth through hard work and dedication.

Overview

21
21
years of professional experience

Work History

Chief Mechanical Engineer

Jurong Engineering Pte Ltd
08.2024 - Current
  • Working as a Chief Mechanical Engineer in Jurong Engineering Pte Ltd Keppel Sakra Cogen600MW advanced gas turbine cogeneration combined cycle power plant project Singapore from Aug '2024

Construction Manager

Jurong Engineering Ltd
09.2021 - 07.2024
  • Handling BOP piping package, Aux
  • Equipment’s and pumps, Boiler piping- Erection& installation, testing& pre commissioning) (coal mills and fans)
  • Project: Matarbari2 x600 Ultra super critical thermal power plant
  • Client: M/s IHI corporation ltd
  • Owner: M/s CGPL

Chief Mechanical Engineer

Jurong Engineering Ltd
04.2017 - 10.2020
  • Handling BOP piping package, Aux
  • Equipment’s and pumps, Steam turbine piping- Erection& installation, testing& pre commissioning
  • Project: Duyen Hai3 Extension Thermal power project, Vietnam
  • Client: M/s Sumitomo corporation
  • Owner: M/s EVNTPPMB3 Vietnam

Chief Mechanical Engineer

Jurong Engineering Overseas Ltd
08.2014 - 12.2016
  • Handling GTG &STG package, HRSH & BOP piping package, Aux
  • Equipment’s and pumps, GT GEN &ST interconnecting piping
  • Project:1X335 MW-9FA Siddhirganj CCP plant project, Bangladesh
  • Client: M/s Isolux Corsan
  • Owner: M/s EGCB, Bangladesh

Mechanical Engineer

Jurong Engineering Ltd
12.2012 - 08.2014
  • Handling GTG&STG package and BOP equipment’s package
  • Project:1x400MW – KA26-1 CC power project at Jurong Island - Singapore
  • Client: M/s Alstom power ltd
  • Owner: M/s SembCorp CCP3 @ Banyan power project

Mechanical Engineer

Jurong Engineering Ltd
12.2011 - 11.2012
  • Acting as a piping in charge of GT, GEN &ST Turbine Inter connection piping
  • Project:2x400MW – CC power project at Jurong Island - Singapore
  • Client: M/s Alstom power ltd
  • Owner: M/s Keppel merlimau co gen power project

Mechanical Engineer

EDAC Engineering, Ltd
07.2010 - 07.2011
  • Acting as a Area In charge for Critical piping, LP piping, Pressure parts, coal mills &Ducting
  • Project:4x300MW -Thermal power plant at Ratnagiri, - Maharashtra
  • Client: M/s Shanghai Boiler Works, Ltd
  • Owner: M/s JSW Energy ltd

Piping In charge

Gulf Spic Engineering, (L.L.C), Dubai
04.2009 - 05.2010
  • Project:2000 MW -IW power plant at Fujairah- Dubai
  • Client: Jurong engineering ltd / M/s Alstom power ltd
  • Owner: M/s Fujairah Asia Power Company (FAPCO)

Piping engineer

Gulf Spic Engineering, (L.L.C), Dubai
02.2008 - 03.2009
  • Project:225 MW extension power plant at Fujairah-Dubai
  • Client: M/s Arabian Bemco contracting company
  • Owner: M/s Fujairah Electricity & Water Authority/ SembCorp

Execution engineer (Piping)

Dowel Erectors Pvt Ltd, Chennai
08.2005 - 12.2007
  • Project:4x250 MW Super Thermal power plant, Chhattisgarh
  • Client: M/s BHEL
  • (Bharat Heavy Electrical Ltd)
  • Owner: M/s O.P.Jinthal Super Thermal Power Plant, India

Training engineer (QA/QC)

Dowel Erectors Pvt Ltd, Chennai
12.2003 - 07.2005
  • Project:225 MW extension power plant at Unjahar, U.P, India
  • Client: M/s BHEL
  • (Bharat Heavy Electrical Ltd)-/ NTPC

Education

Bachelor of engineering - Mechanical

Madurai Kama Raj University
01.2000

Skills

  • Microsoft Excel
  • Product development
  • CAD
  • Manufacturing processes
  • Risk management
  • Quality assurance

Languages known

Tamil, English, Hindi & Malayalam.

Extracurricular activities:

ASNT-LEVEL-II (RT, UT, PT, MPT) Risk Management Implementation plan –BIZSAFE LEVEL2 BCSS-Building Construction Supervisors Safety Course Safety Instruction Course (MAN HOLE) For Supervisors Ms Office (word, excel, ms project, power point) AutoCAD Manage Workplace Safety and Health in Construction sites.

Profile summary:

Chief Mechanical engineer with more than Twenty years of experience with various organizations in different fields of mechanical engineering as Boiler Pressure parts, Steam Turbine and its related piping system, High pressure piping, Bop piping, Ducting, (Fabrication & Installation), Lp heater and Hp heaters, Coal Mill, HRSG, GTG and STG, Equipment’s and pumps erection plan, alignment, shut down jobs, Testing plan activities and Oil flushing and planning. (Coal and Gas based Power Plants).

Roles and Responsibilities:

  • Prepare, coordinate, review and distribute estimates in accordance with Company policy and procedures, Workflow, and Work Instructions.
  • Monitor the daily construction activities, daily site-inspections, and ensure compliance with the QA/QC program, project drawings and specifications.
  • Calculating of scope of work and preparing schedule as per project requirement.
  • Review the requirements of crane, Trailor, forklift requirements and tools tackles list.
  • Segregate the scope of works and allot the sub-contractor.
  • Preparing weekly/monthly target as per work front availability for getting progress.
  • Preparing/Review daily/weekly progress report and getting approval from the client for billing.
  • Preparing site and material constraint/discrepancies and submit to management.
  • Leading the site, subcontracting and Mechanical supervision and issuing field design changes for Mechanical jobs.
  • Attending Progress review meetings with client management and making Minutes and following up for actions.
  • Preparation of the bill of material and inspection of fabricated pipeline spools as per isometric drawing.
  • Preparation of method statements, Risk assessments and lifting plans.
  • Preparing inspection reports and other relevant documents.
  • Responsible for Gas Turbine, Generator and Steam turbine Installation and alignment as per applicable standards and testing plan.
  • Ensuring implementation of Quality Control Plan, Procedure and Inspection & Test Plan.
  • Review the test package and witnessing the hydro test, pneumatic test, service test, and flushing as per applicable codes and procedures.
  • Preparing & monitoring manpower requirement as per schedule.
  • Making requirement of tools & tackles and P & M equipment’s as per schedule.
  • Lead and review work packages prior to execution and erection.
  • Monitor the work progress and ensure the uniformity and consistency in the application of procedure in conformance of project specification requirements.
  • Planning, Evaluation and Acceptance of ongoing and completed piping works both in fabrication and installation.
  • Responsible for Equipment’s erection, inspection of alignments, pre-fabrication of piping spools and Fabrication of pipe supports.
  • Responsible for erection of high-pressure pumps &piping, hydro testing and pre commissioning.
  • Preparation of material and consumable requirements as per schedule.
  • Responsible to general requirements for pressure testing procedures for field hydro-test
  • Responsible for the installation & erection of all type of mechanical equipment’s.
  • Site survey, Pre-Engineering Survey, Site supervision and Co-ordination for offshore and onshore project.
  • Leading for erection, Alignment and Commissioning of Rotary Equipment’s and pipe line In Thermal Power Plants Such as Turbine, Gear Box, Generator, Forced Drought Fan, Primary Air Fan, Seal Air Fan.
  • Planning & leading for erection, Alignment and pre-Commissioning of Steam Turbine, Generator and STG Auxillaries of gland Steam Condenser Air Jet Ejector, LP Heater, Hp Heater, Deaerator and storage tanks,Condenser.
  • Plan for Erection Alignment and Commissioning of Coal Mill, CEP, BFP, CCW PUMP’S and lubricating oil equipment with integral pipe line.
  • Plan for Erection and Alignment of Air intake system &Sea Water intake pumps and screens
  • Responsible for erection of high-pressure piping, hydro testing and pre commissioning.
  • Responsible in closing the various category of punch list as per priorities.
  • Handover the package to client as per the committed schedule.

Timeline

Chief Mechanical Engineer

Jurong Engineering Pte Ltd
08.2024 - Current

Construction Manager

Jurong Engineering Ltd
09.2021 - 07.2024

Chief Mechanical Engineer

Jurong Engineering Ltd
04.2017 - 10.2020

Chief Mechanical Engineer

Jurong Engineering Overseas Ltd
08.2014 - 12.2016

Mechanical Engineer

Jurong Engineering Ltd
12.2012 - 08.2014

Mechanical Engineer

Jurong Engineering Ltd
12.2011 - 11.2012

Mechanical Engineer

EDAC Engineering, Ltd
07.2010 - 07.2011

Piping In charge

Gulf Spic Engineering, (L.L.C), Dubai
04.2009 - 05.2010

Piping engineer

Gulf Spic Engineering, (L.L.C), Dubai
02.2008 - 03.2009

Execution engineer (Piping)

Dowel Erectors Pvt Ltd, Chennai
08.2005 - 12.2007

Training engineer (QA/QC)

Dowel Erectors Pvt Ltd, Chennai
12.2003 - 07.2005

Bachelor of engineering - Mechanical

Madurai Kama Raj University
M. BASKAR RAJ