Solutions-oriented engineering professional with strong understanding of product development process. Brings excellent interpersonal and communication skills to work effectively with colleagues, management and vendors. Proactive in identifying areas of improvement and taking steps to drive successful completion of projects.
• Assembled vital components for semiconductor manufacturing equipment in a safe and methodical way, resulting in zero workplace incidents and assisted department in receiving certificate of recognition for the third and fourth quarter of 2020.
• Assisted in micro part assembly for manufacturing equipment components, which reduced turnover and returning of non-functional parts from product testing departments, which led to an increase in output of final equipment.
• Communicated well with other departments during part shortages and assisted in implementing a system for logging of parts borrowed in order to increase accountability and better allocation of parts.
• Assisted Transport Hub East with several projects and safety protocol implementations unit wide, resulting in fewer reported safety breaches and incidents happening within camp grounds.
• Trained incoming national servicemen on safe operating procedures and proper training routines, which allowed for an increase in trained servicemen, while resulted in proper resting and less strenuous timetable of current on duty NSFs.
• Subject Matter Expert for preventive maintenance of class 3 and 4 vehicles, resulting in faster turnover and processing of drivers returning from deployment.
• Achieved the position of safety ambassador for Transport Hub East, which directly led to a reduction in the number of safety violations throughout various camps around the country.
• Assisted engineers in data logging of components and parts into online platform, which resulted in the development and launch of final online database still currently in use by engineers to perform maintenance, repair and overhaul (MRO) work.
• Quality control checks on data uploaded for the CFM56-7B Engine platform utilized, which ultimately allowed engineers to reduce time spent on paperwork by up to 40%.
• Utilized team members in order to delegate tasks and focus on the more important aspects, resulting in over 6000 documents logged, a 20% increase in comparison to the prior batch of interns during the same timeframe.