Summary
Overview
Work History
Education
Skills
Educationbackground
Personal Information
Software
Certification
Timeline
Generic
KYI KYI MON

KYI KYI MON

ELECTRICAL ENGINEER
Singapore

Summary

Electrical Engineer with 10 years of experiences Construction Industry, over 2 years in Singapore Kim Chuan Depot Extension Project and 8 years in Myanmar such as Low Voltage & Extra Low Voltage elctrical installation, coordination, development of statements in testing procedures & System Design.

I bring my experiences in operating of projects and design coordination. I am looking forward to a opportunity of proving my worth that offers ambitious goals.

Overview

12
12
years of professional experience
12
12
years of post-secondary education
3
3
Certifications
1
1
Language

Work History

Electrical Engineer

Puretech Engineering Pte Ltd.
07.2022 - Current

KCDE (Kim Chum Depot Extension Rail and Bus Depot) Project


  • Design and analyze electrical systems based on Contract design drawings before construction to improve efficiency for timely submission to LTA & Consultant.
  • Collaborate with Civil, Architects, engineers, and other project stakeholders to integrate electrical systems into overall Rail & Bus Depot.
  • Participate in regular LTA Technical meetings and proactively manage customer expectations by preparing necessary submissions / Design Proposals/agenda /Pro minutes of meeting etc.
  • Liaise with multiple suppliers and Corporations for drawings & Material submission and approval, and advise Client to be implemented specifications and installations.
  • Perform electrical load calculations, equipment selection, and system sizing.
  • Review on Single Line Diagram & Panel Manufacturing drawings and submit for approval.
  • Ensure designs comply with relevant specifications, electrical codes, regulations and standards.
  • Coordinate with the BIM team for Shop drawing submission as per specifications & LTA requirement.
  • Raise RFI & EI to LTA & Consultant due to design discrepancies and load requirements from other SWCs.
  • Conduct and participate in FAT for Main Switch Boards & Distribution Boards at Panel Factory.
  • Proficient in technical design Volt Drop Calculation, Lux Calculation, etc,.
  • Proficient in AutoCAD and NAVISWORK to coordinate and review electrical & other services.
  • Collaborate with LTA, Consultant.Suppliers & internal team members for successful project execution.


Electrical Engineer

Kinden Corporation (Myanmar - Japan Branch)
02.2020 - 04.2022

Y-Complex - Office Tower & Hotel Project


  • Participate in weekly and monthly project progress meeting and update progress report
  • Co-ordinate with in-house architectural & structural team to minimize discrepancies
  • Submit, and review shop drawings, coordination drawings & progress claims
  • Supervise and control project operations for manpower planning and update project schedule
  • Make periodic checks on contractors to ensure compliance with specifications and drawings, etc
  • Supervise site works to achieve good quality and progress
  • Work closely with draftsmen and all sub-contractors to carry out design, supervision and installation of the entire electrical installation, including testing and commissioning of all systems


Site Engineer (Electrical)

Thai Chumsin Engineering Co.,Ltd(Myanmar-Thailand)
12.2015 - 11.2019

Sule Square Office Tower Project

ARYU International Hospital Project

Holly Hotel 1&2 Project


  • Handling of technical and engineering problems in electrical LV,ELV systems
  • Submit, and prepare shop drawings, as-built drawings
  • Responsible for the planning, coordinating, quality and timely completion of engineering drawings
  • Ensure that all materials used and work performed are as per specifications
  • Track subcontractor resources daily and record accurately
  • Monitoring and carrying out quality check on progressive completed
  • Inspection, Test & Commissioning with Consultants/Main con



Quantity Surveyor & Drafter

Now Engineering M&E Co.,Ltd
06.2013 - 10.2015
  • Review and understand scope of works, tender drawings and tender specifications
  • Request quotations from suppliers and sub-contractors
  • Responsible for pre-tender and preparation of tender documents
  • Responsible for quantity take-off and cost estimation for tendering of project
  • Develop and prepare engineering drawings, such as Single-Line, Layout, Schematics, from sketches
  • Coordinate M&E services site issue, site inspection
  • Documentation such as RFI, RFA, Materials Submission, OMM
  • Prepare project tender submission and cost estimation
  • Liaise with suppliers, contractors and consultants


Education

Bachelor of Engineering - Electrical Power

Meikhtilar Technological University
Meikhtilar
04.2001 - 01.2013

Skills

Design and Coordination

undefined

Educationbackground

B.E. (Electrical Power), Meiktila Technological University, 2013

Personal Information

  • Available: August 2025 onward
  • Expected Salary: S$4000 (Negotiable)
  • Current Salary: S$3745
  • Passport Number: MF724748
  • Date of Birth: 05/31/91
  • Gender: Female
  • Nationality: Myanmar

Software

Auto Cad

NAVISWORKS

MS Outlook

MS Word

MS Excel

MS Powerpoint

Certification

Auto Cad 2D, 3D, Isometric Course

Timeline

Electrical Engineer

Puretech Engineering Pte Ltd.
07.2022 - Current

Electrical Engineer

Kinden Corporation (Myanmar - Japan Branch)
02.2020 - 04.2022

Site Engineer (Electrical)

Thai Chumsin Engineering Co.,Ltd(Myanmar-Thailand)
12.2015 - 11.2019

Quantity Surveyor & Drafter

Now Engineering M&E Co.,Ltd
06.2013 - 10.2015

Bachelor of Engineering - Electrical Power

Meikhtilar Technological University
04.2001 - 01.2013
KYI KYI MONELECTRICAL ENGINEER