Overview
Work History
Education
Timeline
Generic

KOK LEONG LOW

Overview

5
5
years of professional experience

Work History

Machine Technician

Dou Yee Tech
03.2021 - Current
  • Set accurate feed rates and trimming protocols to maintain efficient production and meet schedule demands.
  • Followed tooling instructions and product specifications to determine and implement operational sequences.
  • Demonstrated adaptability in mastering various machines across different departments, increasing overall team flexibility.
  • Performed preventive maintenance to promote machine reliability and longevity.

Machine Technician

Imprint System
05.2019 - 03.2021
  • Set accurate feed rates and trimming protocols to maintain efficient production and meet schedule demands.
  • Followed tooling instructions and product specifications to determine and implement operational sequences.
  • Maximized equipment lifespan with thorough cleaning and lubrication routines.
  • Enhanced production output with consistent monitoring and adjustments of machine settings.

Education

SPM -

Smk Methodist (ACS) Kampar
Malaysia

Timeline

Machine Technician

Dou Yee Tech
03.2021 - Current

Machine Technician

Imprint System
05.2019 - 03.2021

SPM -

Smk Methodist (ACS) Kampar
KOK LEONG LOW