Summary
Overview
Work History
Education
Skills
Timeline
Generic

K BASKARAN KRISHNAN

Since

Summary

Energetic Field Service Engineer with 10-year background performing tool Lam Flex repairs, installations and troubleshooting. Committed to providing optimum service support through personal visits. Proficient in investigating and troubleshooting common problems and providing efficient, courteous and professional repair services.

Overview

25
25
years of professional experience

Work History

Field Service Engineer

Must holding Pte Ltd
06.2016 - Current
  • Cost Improvement Project
  • Coordinated with equipment engineers in the Lam (Internal), fabricate the special jigs for preventive team to improve pm quality which extended life-time of certain high-dollar parts by 50%
  • Equipment Sustaining
  • Provide equipment support and analytical report and presentations to customer
  • Proposing preventive actions and rectification which brought up the manufacturing availability by 15% - Upgrades and project management - Managed parts acquisition and man-power planning to ensure efficient work flow
  • Support as a vendor for LAM Research to install new tool, upgrade and process kit installation (FXP.HXP , ICS and HX) base at Micron
  • Semiconductor Asia at woodland
  • Provide training for new hired engineer and process tech
  • Performed 12-hours shift working hours in a clean room DRY ETCH department
  • Served in a 3-men team for main job requirements which includes performing troubleshooting and preventive maintenance
  • Responsible in providing maintenance support for dry etch machines, i.e,
  • FLEX FXP , HXP AND HX E2300e6 -Established equipment troubleshooting operational procedure to reduce maintenance cost management
  • Perform proper housekeeping, implemented modification to equipment in
  • Resume K BASKARAN KRISHNAN - 6 - order to improve production yield and reduce down time
  • Sustains and improve preventive maintenance procedure during high production time to reduce downtime and cost at the same time maintain machine reliability.

Associate Maintenance Engineer

StatscChipPac Pte Ltd
09.2014 - 06.2016
  • Resume K BASKARAN KRISHNAN - 3 -
  • Performed 12-hours shift working hours in a cleanroom final testing department
  • Served in a 4-men team for main job requirements which includes performing troubleshooting and preventive maintenance
  • Responsible in providing maintenance support for final testing machines, i.e, NS6040,NS7000, and Multitest
  • To solve defectivity problems faces by the production and maintenance group
  • Performed proper housekeeping, implemented modifications to equipment in order to improve production yield and reduce down time
  • Sustains and improves preventive maintenance procedure during high production time to reduce downtime and cost and at the same time maintains machine reliability.

Assistant Maintenance Engineer 1/PM coordinator

STMicroelectronics Pte Ltd
12.1997 - 09.2014
  • Versatile, accomplished engineering management professional with proven expertise managing maintenance operations in a wide range of industrial settings
  • Carry out duties in monitoring and maintenance of equipment and
  • Processes to ensure no wastage of resources such as energy, chemical and gases and eliminate and minimize contamination to environment
  • Resume K BASKARAN KRISHNAN - 4 -
  • Responsible in providing maintenance support for Thin Film machines, i.e, SVG ,Watkins jhonson(WJ),Asm Tube,Varian ,P5000 and Mrc machines, Wet benches & Semitools spin dryers
  • Coordinated machine conversions, installation of gas lines, vacuum pumps and chemical inlets, and setting up and commissioning of new and old tools from scratch to run production
  • Sustains and improves preventive maintenance procedure and provide technical skill training and certification of production staff through TPM and during high production time to reduce downtime and cost and at the same time maintains machine reliability
  • Performed proper housekeeping, implemented modifications to equipment in order to improve wafer yield and reduce down time
  • Lead a group of pm tech to implement project which improve equipment reliability, efficiency, wafer cost and fab yields by providing technical know-how and tools
  • To qualify machines after machine up by maintenance engineer
  • IFit - Project -Novellus variability improvement
  • To solve defectively problems faces by the production and maintenance group
  • Implement TQM and continuous improvements projects for process/quality productivity
  • Resume K BASKARAN KRISHNAN - 5 -
  • Liaise with vendor for upgrading and modification of machine, raise
  • RWP(risk work plan) when bring in vendor.

Education

WSQ SC - undefined

Resume K BASKARAN KRISHNAN
01.2002 - 1 1

SC-ISE-402E-1 Manage problem solving - undefined

WSQ

Higher National Dip - Electrical/Electronic Engineering

The Nottingham Trent University
01.1996 - 01.1997

ITE Skills Cert in Autonomous Maintenance - undefined

Institute of Technical Education
01.2007 - 01.2008

ITE Skills Cert in Public Trade Test - undefined

Institute of Technical Education

Diploma - Electrical/Electronic Engineering

Selangor Workers Institute of Technology (WIT)
01.1995 - 01.1998

Higher Secondary - undefined

Sijil Pelajaran Malaysia (SPM)
01.1991 - 01.1992

undefined

Sekolah Menengah

Skills

D OFFICE SKILLS AND SOFTWAREMicrosoft Office such as Word, Excel, PowerPointE SKILLS AND ABILITIESCommunicationEffective and good verbal and non-verbal communication skillsTraining / Organizational AbilityAble to complete task given efficiently and promptlyCritical thinking in meetings and researchObtained CERT training and certification in 2011- 201One month Diaelectric and kiyo training at Taiwan 2017Appreciations letter from Lam for outstanding performance 2018

Notice period : one month

Current basic salary: $380000 (exclude transport and phone allowance $400)Resume K BASKARAN KRISHNAN7 -

Expected salary: $430000

Timeline

Field Service Engineer

Must holding Pte Ltd
06.2016 - Current

Associate Maintenance Engineer

StatscChipPac Pte Ltd
09.2014 - 06.2016

ITE Skills Cert in Autonomous Maintenance - undefined

Institute of Technical Education
01.2007 - 01.2008

WSQ SC - undefined

Resume K BASKARAN KRISHNAN
01.2002 - 1 1

Assistant Maintenance Engineer 1/PM coordinator

STMicroelectronics Pte Ltd
12.1997 - 09.2014

Higher National Dip - Electrical/Electronic Engineering

The Nottingham Trent University
01.1996 - 01.1997

Diploma - Electrical/Electronic Engineering

Selangor Workers Institute of Technology (WIT)
01.1995 - 01.1998

Higher Secondary - undefined

Sijil Pelajaran Malaysia (SPM)
01.1991 - 01.1992

SC-ISE-402E-1 Manage problem solving - undefined

WSQ

ITE Skills Cert in Public Trade Test - undefined

Institute of Technical Education

undefined

Sekolah Menengah
K BASKARAN KRISHNAN