Summary
Overview
Work History
Education
Skills
Certification
DECLARATION
Timeline

K. Vignesh

M&E Project Engineer
Singapore,singapore

Summary

Versatile and skilled M&E Engineer with over 4 years of experience in ACMV (HVAC) and Electrical systems across residential, commercial, and industrial projects. Proven expertise in design, installation, testing & commissioning, and site supervision. Adept at delivering projects with high safety standards, quality control, and client satisfaction. Seeking a challenging position in a reputed engineering firm to contribute technical skills and project leadership.

Professional engineer with focus on mechanical and electrical systems, skilled in managing and optimizing M&E projects. Proven track record in collaborating with cross-functional teams to deliver high-quality results and adapt to evolving project requirements. Expertise in system design, troubleshooting, and regulatory compliance, combined with strong analytical and problem-solving abilities. Known for reliability and results-driven approach.

Overview

4
4
years of professional experience
5
5
Certifications
2
2
Languages

Work History

M&E Engineer

Wah Loon
01.2026 - Current
  • Championed continuous improvement initiatives within the organization, identifying opportunities for enhancing M&E practices across departments.
  • Conducted rigorous testing procedures to validate system functionality and ensure optimal performance at all times.
  • Upheld strict quality control measures across all project phases – from design through installation – to ensure consistently high standards were met.
  • Enhanced operational performance with the development of customized maintenance strategies for critical systems.
  • Improved system efficiency by designing and implementing M&E solutions for various projects.
  • Reduced energy consumption by conducting thorough energy audits and recommending cost-effective upgrades.
  • Coordinated closely with offsite teams to troubleshoot issues remotely, leveraging advanced diagnostic tools and techniques for rapid resolution.
  • Developed detailed system specifications to guide accurate fabrication, installation, and commissioning efforts.
  • Maintained a safe working environment, adhering strictly to established safety protocols while executing engineering tasks.
  • Collaborated closely with cross-functional teams to streamline project execution and maximize overall success rates.
  • Optimized production processes through the implementation of advanced control systems and process improvements.
  • Examined existing documents and blueprints to best update and maintain project records.
  • Supported data center power and cooling infrastructure and consistently applied critical facility operational best practices.
  • Spearheaded training sessions for junior engineers, fostering professional growth while strengthening overall team capabilities.

Asst Engineering

Wah loon Engineering Pte Ltd
01.2024 - Current
  • Key Responsibilities – Mechanical (ACMV):
  • Designed and reviewed ACMV systems including ductwork, chilled water piping, and ventilation systems.
  • Prepared shop drawings, coordination, and as-built drawings using AutoCAD.
  • Performed static/dynamic testing, air balancing, and HVAC commissioning.
  • Coordinated with consultants, clients, and MEP teams for execution.
  • Managed material submittals, method statements, and equipment selections (AHU, FCU, VRF, etc.).
  • Ensured mechanical system completion as per schedule and standard.
  • Key Responsibilities – Mechanical (ACMV) (Testing & Commissioning):
  • Performed system performance checks and air balancing.
  • Oversaw HVAC commissioning activities across multiple sites.
  • Ensured testing documentation met regulatory and internal QA/QC requirements.
  • Contributed to a positive work environment with strong interpersonal skills and proactive teamwork attitude.
  • Answered incoming phone calls to process requests, transfer calls, or relay messages to appropriate personnel.

Project supervisor

Wah loon Engineering Pte Ltd
01.2022 - 10.2023
  • Key Responsibilities – Electrical (Construction):
  • Supervised installation of cable trays, turnking, glanding, termination and panel installations (MV/LV).
  • Executed installation of smart lighting, streetlights, earthing, lightning systems.
  • Monitored F&G systems: smoke detectors, heat detectors, H2S detectors, VESDA, and flame detector
  • Ensured site adherence to SOP and zero-punch list policy.
  • Familiar with SLD, schematic drawings, FAT, and SAT procedures.
  • Key Responsibilities – Electrical (Testing & Commissioning):
  • Performed cable testing, panel torque tests, and electrical inspections.
  • Conducted solo run tests for motors, pumps, and compressors.
  • Executed loop testing and commissioning of PLC, DCS, HMI, VFD stations, and DB/motor circuits.

Asst Project supervisor

Wah loon Engineering Pte Ltd.
11.2021 - 01.2022
  • Enhanced project efficiency by streamlining communication between team members and stakeholders.
  • Identified potential risks and developed mitigation strategies, minimizing negative impacts on projects.
  • Performed variety of technical, clerical and data processing duties to support research professionals.
  • Boosted team productivity through continuous process improvement initiatives and workflow optimization.
  • Managed resource allocation efficiently to maintain optimal staffing levels across multiple projects simultaneously.
  • Edited and proofread tasks for technical and non-technical materials.
  • Ensured compliance with company policies, industry standards, and regulatory requirements throughout the duration of each project.
  • Assisted in budget management, maintaining financial accountability throughout each project phase.

Education

DIPLOMA - MECHANICAL AND ELECTRICAL ENGINEERING

Jurong Academy, Singapore
01.2024
GPA: 85%

BCA - COMPUTER APPLICATION

Pembury college, Melayur, Indai
01.2018
GPA: 80%

HSC - undefined

Government Hr. Sec School, Nangur
01.2014
GPA: 65%

Skills

Mechanical (ACMV):

HVAC System Design & Installation

Duct & Pipe Sizing, Routing

VRV/VRF System Setup

Fire Dampers & Smoke Extraction

Equipment Selection (AHU, FCU, Exhaust Fans)

Air Balancing & Commissioning

Electrical:

Electrical Load Calculation

Cable Laying, Glanding, Termination

MV/LV Panels, Smart Lights & Streetlight Systems

Fire Alarm and Gas Detection Systems

Loop Testing and Electrical Commissioning

PLC, HMI, DCS, VFD Setup

Software:

AutoCAD

Microsoft Office (Excel, Word, Project)

Commissioning

Power distribution

Load calculations

Equipment selection

Control systems

Electrical engineering

Value engineering

Energy management

Indoor air quality

Teamwork and collaboration

Teamwork

Organizational skills

Active listening

Team collaboration

Energy conservation

Interpersonal skills

Professionalism

Project documentation

Geometric dimensioning and tolerancing

Equipment assembly

Complex Problem-solving

AutoCAD proficiency

Certification

Building Construction Supervisor Safety Course – Singapore

DECLARATION

I hereby declare that the above-mentioned particulars are true to the best of my knowledge. Date: Yours Truly, (K.Vignesh )

Timeline

M&E Engineer - Wah Loon
01.2026 - Current
Asst Engineering - Wah loon Engineering Pte Ltd
01.2024 - Current
Project supervisor - Wah loon Engineering Pte Ltd
01.2022 - 10.2023
Asst Project supervisor - Wah loon Engineering Pte Ltd.
11.2021 - 01.2022
Pembury college - BCA, COMPUTER APPLICATION
Government Hr. Sec School - HSC,
Jurong Academy - DIPLOMA, MECHANICAL AND ELECTRICAL ENGINEERING
K. VigneshM&E Project Engineer