Experienced Engineer with over 20+ years of experience in Construction. Excellent reputation for resolving problems and improving customer satisfaction. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Work History
QA/QC Engineer
TAKENAKA Corporation Singapore
09.2022 - Current
Devised and implemented best quality practices and processes for product development.
Directed workers testing product and tabulating data concerning materials, product quality, process and reliability.
Performed and coordinated Concrete & Steel inspections and determined quality assurance testing models of raw materials and finished products.
Prepared, documented and executed detailed test plans, test cases and defect reports.
Designed and developed forms and instructions to evaluate, assess and report quality standards and data.
QA/QC Manager
TOYAH CONST.& ENG’G. P/L
07.2021 - 08.2022
Raising Inspection request on EasyPlant and actual request
Monitored staff organization and suggested improvements to daily functionality.
Recorded, analyzed and distributed statistical information.
Implemented new quality assurance and customer service standards.
Inspected products and worker progress throughout production.
Collected production samples regularly and performed detailed quality inspections.
Reported production malfunctions to managers and production supervisors.
Specified quality requirements of raw materials with suppliers.
Senior Site Engineer
SMCC Overseas Singapore P/L
12.2019 - 06.2021
Checked technical designs and drawings for adherence to standards.
Oversaw quality control and health and safety matters for construction teams.
Recorded daily events and activities in site diary to evaluate process and improve productivity.
Supervised and monitored daily tasks of Six subcontractors.
Conducted project site visits to meet with construction staff, evaluate progress and discuss operational issues.
Ordered and tracked delivery of construction materials and supplies from vendors.
Managed construction equipment maintenance to minimize costs and avoid project disruption.
Site Manager
Takasago Singapore P/L
11.2018 - 11.2019
Maintained records and logs of work performed and materials and equipment used.
Resolved issues between employees and customers using company policies.
Supervised contractor work processes and adherence to project schedule.
Attended weekly meetings with Supervisors to discuss safety procedures, compliance issues and facility maintenance.
Provided general office administration, correspondence, filing and spreadsheet development.
Communicated daily with vendors to keep project fully operational.
Coordinated site investigations, documented issues and escalated to executive teams.
Site Manager
JEKS Engineering P/L
05.2018 - 11.2018
Created weekly and monthly reports and presentations for management team.
Maintained heavy equipment, tools and machinery.
Supported work of superintendents and liaised with off-site designers.
Maintained zero site accidents and lost work days for construction duration.
Verified completed projects met approved time, quality and cost estimates.
Site Engineer
Menard Geosystem (S) P/L
09.2017 - 03.2018
Soil Investigation & Extraction of soil samples by Hand Auger
Conducting vane Shear test to areas on a Bi-weekly basis
Installation of Vibrating Wire Piezometer and monitoring
Installation of Settlement Plate marker and Monitoring
Conduct Hand Drop cone penetration test
Submit report to PM & clients.
SENIOR SITE ENGINEER & Planning Engineer
UES Holdings P/L
10.2014 - 07.2017
Prepared and reviewed engineering specifications, scopes of work, schedules of payments and other documents.
Prepared site reports and organized subcontractor invoices, codes documentation and schematics.
Identified and resolved technical issues and design conflicts to minimize project delays and maintain tight schedules.
Drafted construction planning documents for internal use and submission to applicable inspectors.
Established and implemented construction schedules, methods, equipment and labor requirements using Gantt charts and MS Project.
Surveyed site, marked locations and oversaw construction of roads and other infrastructure components.
Sr. QA/QC Engineer
Taikisha (S) P/L
04.2013 - 09.2014
Prepared the Construction Methodologies for the Fabrication and Installation of ACMV and HVAC eqpmts.
Generating forms for Inspection of Equipment and Materials.
Prepared of Test packs for Inspection and Submission.
Testing and Commissioning and Handing over to Client.
Preparation of all hand‐over documents required by the client.
Coordinating with MainCon for Test schedules.
Coordinating with client/MainCon for all installation procedures.
Clearing for all punchlist items.
Project Engineer
Alstom Singapore P/L
02.2012 - 04.2013
Inspection of materials and installation process for all civil works.
Quality controlling and monitoring of all works being conducted at site. Inspection of reinforcements and formworks before actual casting.
Checking of Instrumentation for struts work at water intake area.
Checking of road works elevation and grading for construction.
Coordination and Inspection with the Resident Engineer, Architects and Clerk of Works/RTO to ensure that works are executed accordingly.
Planning of works so as not to congest the site with different trades working in one area.
Resident Technical Officer (RTO)
Chong & Lee Consultants
07.2011 - 12.2011
Ensuring the contractors maintain work safety, cleanliness and tidiness of the site
Assisting in compilation of all As‐built Drawings, Operation Maintenance Manuals/Warranties and Defects’ List for rectification by the contractor
Checking of column reinforcement prior to closing of column formworks and casting.
Checking of quality of slabs prior to application of Architectural finishing.
Checking of Quality of hollow core slab material before delivery to site.
Checking of eccentricity of hollow core slab before acceptance.
Checking of post tensioning tendons before casting of beams and slabs
Checking of actual quality of columns and slabs for Conquas inspection.
Construction QA/QC Manager
Turner & Townsend P/L
04.2010 - 06.2011
Developed and analyzed quality control processes and deliverables to determine present standards and establish recommended action plans.
Documented inspection results by completing logs.
Oversaw department of 300 workers by supervising daily operations, providing technical support and coordinating personnel.
Evaluated Quality systems for overall functionality, identified opportunities for improvement and implemented changes to facilitate better outcomes.
Collaborated with development teams, internal customers and product line management to verify delivery of desired quality requirements to distributors.
Improved quality processes for increased efficiency and effectiveness.
QA/QC Engineer
McConnell Dowell SEA P/L
12.2007 - 02.2010
Preparation and updating of Project Execution Plans/Construction Quality Control.
Preparation for External Quality Audit (ISO 9001)
Monitoring for Instrumentations such as Inclinometers, Vibration Monitors, Prism Monitors & Ground Settlements
Quality control of all Precast Units for Launching.
Submission of Materials for Client’s approval.
Preparation of Loading Plan and Launching Procedure.
Checking of Pile Driving Records and Pile Driving Analysis.
Sourcing and Evaluation of Suppliers/Subcontractors for the project
Checking and Updating of Records (Piling, Concreting, etc.)
Conducting Non‐Destructive Test (RT, FDT by Nuclear Method,
Education
Bachelor of Science - Civil Engineering
Bataan Educational Inst.
Philippines
03.1991
Skills
Quality Control Standards
Test Scheduling
Manual Testing
Quality Control Programs
Test Procedure Documentation
Corrective Actions
Engineering Specifications
Continuous Learning
Accomplishments
Resolved product issue through consumer testing.
Supervised team of 20 staff members.
Used Microsoft Excel to develop inventory tracking spreadsheets.